Duta–Ulu Klang Expressway
Duta–Ulu Klang Expressway (DUKE, E33), is the main expressway network in Klang Valley, Malaysia. The 18 km (11 mi) expressway connects New Klang Valley Expressway's Jalan Duta Interchange (E1) to Taman Hillview Interchange on Kuala Lumpur Middle Ring Road 2 28 in Ulu Klang. The expressway was constructed to provide the "missing link" between New Klang Valley Expressway (E1), Kuala Lumpur–Karak Expressway (E8), and Kuala Lumpur Middle Ring Road 2 (JKR28). This expressway is also known as the Kuala Lumpur Northeast Dispersal Link Scheme. It was proposed by Tan Sri Datuk Lim Kang Hoo, a chairman of Ekovest Berhad.
It originally was given route code E16 but later changed to E33 instead. In addition to improving connectivity, DUKE disperses traffic from the city to the suburban range through several routes in and out of several branches of the main intersection. Through DUKE, drivers can move from one part to other parts of Kuala Lumpur in a short time, by bypassing congested traffic areas, such as Kuala Lumpur Middle Ring Road 1 and Kuala Lumpur Inner Ring Road.
Route background
Duta–Sentul Pasar–Ulu Klang sections
The Kilometre Zero of this section is located at Jalan Duta Interchange near Jalan Duta, Kuala Lumpur, at its interchange with the New Klang Valley Expressway North–South Expressway Northern Route.
Greenwood–Sentul Pasar sections
The Kilometre Zero of this section is located at Sentul Pasar Interchange. At Bandar Dalam Interchange the expressway overlaps with the Federal Route 2 from Bandar Dalam Interchange to Greenwood Interchange.
History
The expressway used to be known as the Kuala Lumpur North East Expressway (KLNEE). It is a main element in the Kuala Lumpur Structure Plan 2020 as specified in the Transportation Research of the Japan International Cooperation Agency (JICA) conducted by the Kuala Lumpur City Hall (Dewan Bandaraya Kuala Lumpur) (DBKL) in 1985. It was identified by DBKL as one of the main connecting routes to complete the Kuala Lumpur Structure Plan 2020. DBKL conducted a detailed study of the alignment that feed the next three years, including Environmental Impact Assessment and Public Opinion. These studies and reports were approved by the Concession Agreement signed with the Federal Government on 12 August 2004.
The construction of this expressway commenced in mid-2006. The Jalan Duta–DUKE Interchange was built at the sharp hairpin of the NKVE and the Jalan Kuching Interchange was built at the former Jalan Kuching Toll Plaza owned by Kamunting Corporation Berhad. The expressway was partially (2/3) opened officially by the Minister of Works Ir Mohd Zin Mohamed on 9 January 2009. Three months later, the NKVE section was open to traffic on 30 April 2009. Built to accommodate 120,000 vehicles per day, this expressway will offer an attractive alternative route to Klang Valley residents, especially for those traveling from east to west and for those who want to go to the city centre.
Progress
Construction progress gallery
- Progress photo taken at Duta Interchange Feb 2006
- Progress photo taken at Duta Interchange Feb 2007
Developments
DUKE Extension Expressway Project
The phase two development of the DUKE will be built by Ekovest Bhd and will start in two weeks at a construction cost of RM1.183 billion. Phase two, which will entail the construction of an elevated highway that will complement the existing DUKE, was to be completed in 2015. The DUKE extension will comprise two additional links, namely the Sri Damansara Link and the Tun Razak Link. Both links are proposed to have dual carriageways and the Tun Razak link will be about 9 kilometres in length while the Sri Damansara Link will be 7 kilometres long. The expressway will serve as a link between the Kuala Lumpur Middle Ring Road 1 (MRR1) and Kuala Lumpur Middle Ring Road 2 MRR2.
Features
- Flyovers passing Segambut, Sentul and Setapak town.
- Sentul flyover sections with 132kv of Tenaga Nasional Berhad's (TNB) transmmision line (National Grid). During construction on 2007, the Cabinet directed the concessionaire Konsortium Lebuhraya Utara-Timur (KL) Sdn Bhd to share the TNB reserve in order to reduced land acquisition costs. In order to do this, the existing high tension pylons were replaced with monopoles, with the expressway running either side.
Tolls
The DUKE uses an open toll system.
Batu, Sentul Pasar, Ayer Panas & Segambut toll plazas have fully Electronic Toll Collections (ETC). As part of an initiative to facilitate faster transaction at the Batu, Sentul Pasar, Ayer Panas & Segambut Toll Plazas, all toll transactions at four toll plazas on the DUKE are conducted electronically via Touch 'n Go cards, SmartTAGs or RFID tags starting January 2018.
Toll rates
(Starting 23 November 2017)
Class | Type of vehicles | Rate (in Malaysian Ringgit (RM)) |
---|---|---|
0 | Motorcycles, bicycles or vehicles with 2 or less wheels | Free |
1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM 2.50 |
2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM 3.80 |
3 | Vehicles with 3 or more axles | RM 5.00 |
4 | Taxis | RM 1.30 |
5 | Buses | RM 1.30 |
- Note: Toll charges can only be paid with the Touch 'n Go cards, SmartTAGs or RFID tags. Cash payment is not accepted.
List of interchanges
Duta–Sentul Pasar–Ulu Klang sections (Main Link)
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
West North–South Expressway Northern Route AH141 New Klang Valley Expressway Klang Kota Damansara Shah Alam North–South Expressway Central Link Kuala Lumpur International Airport (KLIA) North–South Expressway Southern Route AH2 Johor Bahru North–South Expressway Northern Route AH2 NSE Northern Route Ipoh Taiping Penang Alor Setar | |||||
North–South Expressway Northern Route AH141 New Klang Valley Expressway PLUS Expressway border limit | |||||
Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
Duta–Ulu Klang Expressway 0 | 3301 | Jalan Duta Interchange | North–South Expressway Northern Route New Klang Valley Expressway South Jalan Tuanku Abdul Halim (Jalan Duta) City Centre From North–South Expressway Northern Route NKVE West Only Southwest Sprint Expressway Sprint Expressway Mont Kiara Sri Hartamas Petaling Jaya Damansara–Shah Alam Elevated Expressway Kota Damansara From Persiaran Dutamas (proposal)[1] |
Trumpet expressway interchange | |
Duta–Ulu Klang Expressway 0 | 3301 | Jalan Duta Interchange | Direction Towards Sprint Expressway Sprint Expressway From East Southwest Sprint Expressway Sprint Expressway Mont Kiara Sri Hartamas Petaling Jaya Damansara–Shah Alam Elevated Expressway Kota Damansara | From east only | |
Segambut flyover | Start/End of flyover | ||||
Segambut flyover Road-Railway crossing stacked bridge | |||||
3301A 3301B | Segambut flyover Sungai Keroh bridge Segambut Interchange | Upper Flyover 3301A Northwest Duta–Ulu Klang Expressway DUKE Extension Expressway Segambut Bandar Menjalara Kepong FT 54 Sungai Buloh Highway Kuala Selangor Damansara–Puchong Expressway Damansara–Puchong Expressway Desa Park City Damansara Below Flyover Only 3301B East Segambut Bypass Jalan Segambut Jalan Sultan Azlan Shah Jalan Ipoh Jalan Sentul | Directional T elevated expressway interchange Ramp out to/from expressway | ||
Segambut flyover | Start/End of flyover | ||||
Duta–Ulu Klang Expressway 3 | |||||
3302 | Jalan Kuching Interchange | FT 1 Kuala Lumpur–Rawang Highway North Ipoh Rawang Kepong Fraser's Hill South City Centre Cheras North–South Expressway Southern RouteSeremban | Semi cloverleaf interchange | ||
Jalan Ipoh Ramp | Bamboo Hills @ KL Digital City
North Batu Kentonmen Army Camp |
Exit/Entrance ramp via toll plaza | |||
Batu toll plaza BTU | TnG TAG Customer Service Centre | West bound | |||
Batu toll plaza BTU (West bound) MyRFID MyRFID Touch 'n Go Touch 'n Go SmartTAG SmartTAG Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go, MyRFID and SmartTAG) only) | |||||
Duta–Ulu Klang Expressway 4 | |||||
Sentul flyover | Start/End of separated flyover | ||||
Sentul flyover Sungai Batu bridge | |||||
Sentul flyover 132 kv of TNB transmission line (National Grid) 500m | High voltage transmission line on the flyover | ||||
Sentul flyover 132 kv of TNB transmission line (National Grid) 500m Railway crossing bridge | High voltage transmission line on the flyover | ||||
Sentul flyover | Start/End of separated flyover | ||||
Sentul flyover Jalan Sentul Ramp | Jalan Sentul (No Entry) | Ramp in from expressway | |||
Sentul flyover | Start/End of flyover | ||||
Duta–Ulu Klang Expressway 5 | |||||
Duta–Ulu Klang Expressway AH141 Duta–Ulu Klang Expressway | |||||
3303 | Sentul Pasar Interchange | North Duta–Ulu Klang Expressway FT 2 AH141 Greenwood–Sentul Pasar Link (Karak Link) Gombak Sentul Taman Greenwood FT 28 Kuala Lumpur Middle Ring Road 2 Batu Caves Kepong Selayang East Coast Expressway FT 2 AH141 Kuala Lumpur-Karak Highway Genting Highlands Kuantan Kuala Terengganu Duta–Ulu Klang Expressway Tun Razak Link KLCC City Centre Kampung Baru North–South Expressway Southern Route Seremban | Y expressway interchange Elevated u-turn interchange | ||
Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway | |||||
Setapak flyover | Start/End of flyover | ||||
Setapak flyover Sungai Gombak bridge | |||||
Setapak flyover Jalan Pahang Ramp | FT 2 Genting Klang–Pahang Highway Jalan Pahang (No Entry) | Ramp in to expressway | |||
Setapak flyover | Start/End of flyover | ||||
Ayer Panas toll plaza APS (East bound) MyRFID SmartTAG SmartTAG Touch 'n Go Touch 'n Go Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go, MyRFID and SmartTAG) only) | |||||
Ayer Panas toll plaza APS Kesturi main headquarters | TnG TAG Customer Service Centre Kesturi operation office | East bound | |||
Ayer Jernih–Semarak flyover | Start/End of flyover | ||||
3304 | Ayer Jernih–Semarak flyover Ayer Jernih Ramp | Setapak City Centre | Ramp in/out to/from expressway | ||
Ayer Jernih–Semarak flyover | |||||
3305 | Ayer Jernih–Semarak flyover Semarak Interchange | Jalan Sultan Yahya Petra (Jalan Semarak) South City Centre Kampung Baru PULAPOL | Half diamond interchange | ||
Ayer Jernih–Semarak flyover | Start/End of flyover | ||||
3306 3306B 3306C | Setiawangsa Interchange | Jalan Jelatek North Wangsa Maju Taman Sri Rampai Danau Kota South Setiawangsa B31 Jalan Ampang 3306B Setiawangsa–Pantai Expressway Setiawangsa-Pantai Expressway South Kampung Pandan Bandar Malaysia (Not yet opened) 3306C North Setiawangsa–Pantai Expressway Taman Melati FT 28 Kepong | 3-tier stacked interchange | ||
Federal Territory of Kuala Lumpur | |||||
FT Kuala Lumpur–Selangor border | |||||
Selangor Darul Ehsan Gombak district border | |||||
Hilview flyover | Start/End of flyover | ||||
3307 | Hilview flyover Jalan 37/66 Ramp | Jalan 37/66 North Taman Melawati South Jalan Enggang Taman Setiawangsa Taman Keramat | Roundabout interchange | ||
Hilview flyover Sungai Klang bridge | |||||
Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go,MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
FT 28 Kuala Lumpur Middle Ring Road 2 JKR border limit | |||||
3308A 3308B | Hilview flyover Taman Hillview Interchange | FT 28 Kuala Lumpur Middle Ring Road 2 3308A North Ulu Klang Taman Melawati Taman Melati Taman Permata East Klang Valley Expressway East Klang Valley Expressway (EKVE) (Not yet opened) Hulu Langat Bandar Mahkota Cheras Kajang East Coast Expressway FT 2 AH141 Kuala Lumpur-Karak Highway Genting Highlands Kuantan 3308B South Ampang Pandan Indah Cheras Sungai Besi Shah Alam Expressway Puchong Shah Alam Expressway Shah Alam Sungai Besi–Ulu Klang Elevated Expressway Sungai Besi-Ulu Klang Elevated Expressway (SUKE) Ampang Hulu Langat Cheras North–South Expressway Southern Route AH2 NSE Southern Route Seremban Malacca Johor Bahru Kuala Lumpur International Airport | Stacked expressway interchange |
Greenwood–Sentul Pasar sections (Karak Link)
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
Duta–Ulu Klang Expressway 0 (K) | 3303A | Sentul Pasar Interchange | Duta–Ulu Klang Expressway Duta–Sentul Pasar–Ulu Klang Link (Main Link) West North–South Expressway Northern Route AH2 Ipoh Sprint Expressway Petaling Jaya FT 1 Segambut FT 54 Kepong FT 1 Sentul FT 1 Kuala Lumpur city centre East Jalan Sultan Yahya Petra (Jalan Semarak) Duta–Ulu Klang Expressway Setiawangsa FT 28 Ulu Klang FT 28 Ampang South (U-Turn Only) Duta–Ulu Klang Expressway DUKE Extension Expressway Duta–Ulu Klang Expressway Seremban Duta–Ulu Klang Expressway KLCC Duta–Ulu Klang Expressway City Centre Duta–Ulu Klang Expressway Bulatan Pahang Duta–Ulu Klang Expressway Sentul | Y expressway interchange Elevated u-turn interchange | |
Sentul toll plaza STL (North bound) MyRFID SmartTAG SmartTAG Touch 'n Go Touch 'n Go Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go, MyRFID and SmartTAG) only) | |||||
Sentul toll plaza STL | TnG TAG Customer Service Centre | North bound | |||
3303B | Sentul Pasar Interchange | East Only DUKE Extension Expressway FT 2 FT 68 Jalan Gombak Gombak Setapak | From exit only | ||
Sungai Chubadak bridge | |||||
Duta–Ulu Klang Expressway 1 (K) FT 2 -- | |||||
Duta–Ulu Klang Expressway AH141 | |||||
3309 | Jalan Kampung Bandar Dalam | FT 2 Jalan Kampung Bandar Dalam West Sentul Batu East Gombak Setapak | Diamond interchange | ||
Duta–Ulu Klang Expressway FT 2 AH141 Duta–Ulu Klang Expressway | |||||
Duta–Ulu Klang Expressway 2 (K) FT 2 -- | |||||
Duta–Ulu Klang Expressway 3 (K) FT 2 -- | |||||
Sungai Padang Balang bridge | |||||
Federal Territory of Kuala Lumpur | |||||
FT Kuala Lumpur–Selangor border | |||||
Selangor Darul Ehsan Gombak district border | |||||
Duta–Ulu Klang Expressway FT 2 AH141 Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
FT 2 FT 28 AH141 Kuala Lumpur Middle Ring Road 2 JKR border limit | |||||
Duta–Ulu Klang Expressway 4 (K) FT 2 -- | |||||
3310 | Greenwood Interchange | West FT 28 Kuala Lumpur Middle Ring Road 2 Batu Caves Kepong Rawang FT 54 Sungai Buloh FT 54 Kuala Selangor Damansara–Puchong Expressway Damansara-Puchong Expressway (LDP) Damansara Petaling Jaya Puchong East B22 Jalan Batu Caves FT 68 Gombak B22 Taman Greenwood | Directional ramp Stacked diamond interchange | ||
FT 28 AH141 Kuala Lumpur Middle Ring Road 2 Ampang Taman Melati Ulu Klang Northeast East Coast Expressway FT 2 AH141 Kuala Lumpur-Karak Highway Kuantan Genting Highlands |
DUKE Extension Expressway
Duta–Ulu Klang Expressway | |
---|---|
DUKE Extension Expressway | |
Length | 9 km (5.6 mi) |
Existed | 2015–present |
History | Completed in 2017 |
The DUKE Extension Expressway (E33) is an expressway in Kuala Lumpur, Malaysia connecting Sentul Pasar Interchange on the Duta-Ulu Klang Expressway to the Genting Klang–Pahang Highway.
History
The phase two development of the DUKE will be built by Ekovest Bhd and will start in two weeks at a construction cost of RM1.183 billion. Phase two, which will entail the construction of an elevated highway that will complement the existing DUKE, was to be completed in 2015. The DUKE extension will comprise two additional links, namely the Sri Damansara Link and the Tun Razak Link. Both links are proposed to have dual carriageways and the Tun Razak link will be about 9 kilometres in length while the Sri Damansara Link will be 7 kilometres long. The expressway will serve as a link between the Kuala Lumpur Middle Ring Road 1 (MRR1) and Kuala Lumpur Middle Ring Road 2 MRR2. This 9 kilometre and 7 kilometre segment was opened to traffic on 28 September 2017 and 23 October 2017.
Tolls
The DUKE Extension Expressway uses an open toll system.
Sentul Pasar & Segambut toll plazas have fully Electronic Toll Collections (ETC). As part of an initiative to facilitate faster transaction at the Sentul Pasar & Segambut Toll Plazas, all toll transactions at two toll plazas on the DUKE are conducted electronically via Touch 'n Go cards, SmartTAGs or RFID tags starting January 2018.
(Starting 23 November 2017)
Class | Type of vehicles | Rate (in Malaysian Ringgit (RM)) |
---|---|---|
0 | Motorcycles, bicycles or vehicles with 2 or less wheels | Free |
1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM 2.50 |
2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM 3.80 |
3 | Vehicles with 3 or more axles | RM 5.00 |
4 | Taxis | RM 1.30 |
5 | Buses | RM 1.30 |
- Note: Toll charges can only be paid with the Touch 'n Go cards, SmartTAGs or RFID tags. Cash payment is not accepted.
Sri Damansara Link
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
3302 | Segambut Interchange | Duta–Ulu Klang Expressway Duta–Sentul Pasar–Ulu Klang Link (Main Link) East FT 28 Gombak FT 28 Batu Caves East Coast Expressway FT 2 AH141 Kuantan East Coast Expressway FT 2 AH141 Genting Highlands Duta–Ulu Klang Expressway Seremban Duta–Ulu Klang Expressway KLCC Duta–Ulu Klang Expressway City Centre Duta–Ulu Klang Expressway Bulatan Pahang Duta–Ulu Klang Expressway Sentul FT 215 Jalan Semarak Duta–Ulu Klang Expressway Setiawangsa FT 28 Ulu Klang FT 28 Ampang West (U-Turn) North–South Expressway Northern Route AH2 Ipoh Sprint Expressway Petaling Jaya FT 1Kuala Lumpur–Rawang Highway North Only/U-Turn FT 1 Rawang FT 1 Bandar Baru Selayang | Directional T with elevated u-turn expressway interchange | ||
Duta–Ulu Klang Expressway 0 (K) | |||||
3321 | Plaza Tol Segambut Exit | Jalan Lang Emas Jalan Segambut Segambut town centre Taman Sri Bintang Taman Sri Sinar | Interchange with toll plaza | ||
Segambut toll plaza SGT (Both bound) MyRFID Touch 'n Go Touch 'n Go Touch 'n Go SmartTAG Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go MyRFID SmartTAG) only) | |||||
Segambut toll plaza SGT Kesturi main headquarters | TnG TAG Customer Service Centre Kesturi operation office | Both bound | |||
Duta–Ulu Klang Expressway 1 (K) | |||||
Duta–Ulu Klang Expressway 2 (K) | |||||
3322 | Jalan Burung Hantu Ramp | Jalan Burung Hantu Kepong Baru Kepong Taman Bukit Maluri Bandar Menjalara Desa Park City | Ramp in/out from expressway | ||
Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
FT 28 FT 54 Kuala Lumpur Middle Ring Road 2 JKR border limit | |||||
Duta–Ulu Klang Expressway FT 28 FT 54 3 (K) | |||||
3323A | Menjalara Interchange | FT 28 FT 54 Kuala Lumpur Middle Ring Road 2 South Persiaran Utama Bandar Sri Damansara Kepong Industrial Area Damansara–Puchong Expressway Damansara–Puchong Expressway Desa Park City Damansara Petaling Jaya Puchong Putrajaya | From directional ramp expressway interchange | ||
3323B | Menjalara Interchange | FT 28 FT 54 Kuala Lumpur Middle Ring Road 2 North (U-Turn) FT 28 FT 54 Kepong FT 28 Selayang FT 1 Rawang FT 28 Batu Caves East Coast Expressway FT 2 AH141 Kuantan East Coast Expressway FT 2 AH141 Genting Highlands West FT 54 Sungai Buloh Highway Bandar Sri Damansara Sungai Buloh Kuala Selangor Puncak Alam North–South Expressway Southern Route AH2 North–South Expressway Northern Route North–South Expressway Southern Route AH2 Ipoh North–South Expressway Southern Route AH2 Klang North–South Expressway Southern Route AH2 Kuala Lumpur International Airport (KLIA) North–South Expressway Southern Route AH2 Johor Bahru | Elevated directional ramp expressway interchange with u-turn from FT 28 FT 54 Kuala Lumpur Middle Ring Road 2 & Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway |
Sentul Pasar–Jalan Gombak Link
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
3303 | Sentul Pasar Interchange | Duta–Ulu Klang Expressway Duta–Sentul Pasar–Ulu Klang Link (Main Link) West (U-Turn) North–South Expressway Northern Route AH2 Ipoh Sprint Expressway Petaling Jaya FT 1 Segambut FT 54 Kepong FT 1 Sentul FT 1 Kuala Lumpur city centre East Jalan Sultan Yahya Petra (Jalan Semarak) Duta–Ulu Klang Expressway Setiawangsa FT 28 Ulu Klang FT 28 Ampang | Y elevated expressway interchange with u-turn to Duta–Ulu Klang Expressway Duta–Sentul Pasar–Ulu Klang Link (Main Link) | ||
Duta–Ulu Klang Expressway 0 (K) | |||||
Sungai Gombak bridge | |||||
Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
FT 2 FT 68 Jalan Gombak | |||||
Duta–Ulu Klang Expressway 1 (K) | |||||
3351 | Jalan Gombak Interchange | FT 2 FT 68 Jalan Gombak North Bentong Genting Highlands FT 2 Sentul FT 2 Batu Caves East Coast Expressway FT 2 AH141 Kuantan Gombak Wisma Ekovest South FT 2 Genting Klang–Pahang Highway Setapak town centre Jalan Genting Klang FT 28 Klang Gates FT 28 Ulu Klang Jalan Pahang Sentul City Centre Seremban Petaling Jaya | Tunnel trumpet interchange |
Tun Razak Link
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
North Duta–Ulu Klang Expressway FT 2 AH141 Greenwood–Sentul Pasar Link (Karak Link) FT 28 Batu Caves FT 28 FT 2 AH141 Gombak East Coast Expressway FT 2 AH141 Kuantan East Coast Expressway FT 2 AH141 Genting Highlands | |||||
Sentul Tambahan toll plaza STL (South bound) MyRFID Touch 'n Go SmartTAG Touch 'n Go Opened toll system Pay toll (Accepts electronic toll payment (Touch 'n Go, MyRFID and SmartTAG) only) | |||||
Sentul toll plaza STL | TnG TAG Customer Service Centre | South bound | |||
Duta–Ulu Klang Expressway 0 (K) | 3305A 3305B | Sentul Pasar Interchange | Duta–Ulu Klang Expressway AH141 Duta–Sentul Pasar–Ulu Klang Link (Main Link) West North–South Expressway Northern Route AH2 Ipoh Sprint Expressway Petaling Jaya FT 1 Segambut FT 54 Kepong FT 1 Sentul FT 1 Kuala Lumpur city centre Duta–Ulu Klang Expressway FT 2 AH141 Greenwood–Sentul Pasar Link (Karak Link) North (U-Turn) FT 28 Batu Caves FT 28 FT 2 AH141 Gombak East Coast Expressway FT 2 AH141 Kuantan East Coast Expressway FT 2 AH141 Genting Highlands | Y expressway interchange Directional ramp elevated u-turn interchange | |
-- | Jalan Gombak Link Ramp | Duta–Ulu Klang ExpresswayJalan Gombak Link East FT 2 FT 68 Jalan Gombak Gombak Jalan Genting Klang Klang Gates Jalan Pahang Setapak | Southbound direction only | ||
Duta–Ulu Klang Expressway 1 (K) | |||||
Sungai Gombak bridge | |||||
3305C | Bandar Baru Sentul Ramp | FT 2 Genting Klang–Pahang Highway North Jalan 9/48A Jalan Sentul Sentul town centre Bandar Baru Sentul Jalan Pahang FT 2 Setapak FT 68 FT 2 Gombak | Ramp out from expressway | ||
Duta–Ulu Klang Expressway 2 (K) | |||||
Duta–Ulu Klang Expressway 3 (K) | |||||
Duta–Ulu Klang Expressway Duta–Ulu Klang Expressway Start/End of expressway (Touch 'n Go, MyRFID and SmartTAG ETC only) Kesturi border limit | |||||
Jalan Tun Razak (Jalan Pekeliling) | |||||
3355A 3355B | Jalan Pahang Interchange | FT 2 Genting Klang–Pahang Highway Jalan Pahang North FT 2 Setapak FT 68 Gombak East Coast Expressway FT 2 AH141 Kuantan South Jalan Tuanku Abdul Rahman (Batu Road) Jalan Chow Kit (Chow Kit Road) City Centre Hospital Kuala Lumpur Kuala Lumpur Middle Ring Road 1 Jalan Tun Razak West Ipoh Petaling Jaya East KLCC Ampang North–South Expressway Southern Route AH2 Seremban North–South Expressway Southern Route AH2 Melaka North–South Expressway Southern Route AH2 Johor Bahru | Roundabout interchange with one directional underpass to Ipoh and Petaling Jaya |
See also