Green Line (Hyderabad Metro)

The Green Line is a part of the Hyderabad Metro system in Telangana, India.[2] The line is 16.6 km and spans 15 stations from JBS Parade Ground to Falaknuma.[3] It was funded by a public–private partnership (PPP),[4][5] with the state government holding a minority equity stake.[6] A special purpose vehicle company, L&T Metro Rail Hyderabad Ltd (L&TMRHL), was established by the construction company Larsen & Toubro (L&T)[7][8] to develop the Hyderabad Metro rail project.[9][10]

Hyderabad Metro Green Line

JBS Parade Ground - MG Bus Station
Metro train arriving at Secunderabad West metro station
Overview
Other name(s)Corridor – II
StatusOperational
LocaleHyderabad
Termini
Connecting lines
Stations15 (9 opened, 6 yet to open)
Service
TypeRapid transit
SystemHyderabad Metro
Operator(s)Hyderabad Metro Rail Ltd. (HMRL)
Depot(s)Falaknuma
Rolling stockHyundai Rotem
History
Opened8 February 2020 (2020-02-08)[1]
Technical
Line length16.6 km (10.3 mi)
Number of tracksDouble-track
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC Overhead catenary
Operating speed80 km/h (50 mph)
SignallingCBTC
Route map

Parade Ground Subway interchange Blue Line
Secunderabad West
Gandhi Hospital
Musheerabad
R.T.C. X Roads
Chikkadpally
Narayanaguda
Sultan Bazaar
MG Bus Station Subway interchange Red Line
Salarjung Museum
Charminar
Shah-Ali-Banda
Shamsherganj
Jungametta
Falaknuma Palace

An 11-kilometre (6.8 mi) stretch of the Green Line from JBS Parade Ground to MG Bus Station, with 9 stations, was inaugurated on 7 February 2020 by Telangana Chief Minister K. Chandrasekhar Rao,[11] and opened to the public the next day.[1] A 5.6 km southward extension from MG Bus Station to Falaknuma is yet to be completed in the Old City.[1]

Construction

Green Line sections were opened as indicated below.

Green Line
Stage Extension date Terminal Stations Length Stations
18 February 2020Parade GroundMG Bus Station11 km (6.8 mi)9
2Yet to start constructionMG Bus StationFalaknuma5.6 km (3.5 mi)6
TotalParade GroundFalaknuma16.6 km (10.3 mi)15

Stations

Green Line
# Station Name Opened Connections Alignment
EnglishTelugu
1JBS Parade Groundజేబీస్ పెరేడ్ గ్రౌండ్8 February 2020Blue LineElevated
2Secunderabad Westసికింద్రాబాద్ వెస్ట్8 February 2020Secunderabad railway stationElevated
3Gandhi Hospitalగాంధీ హాస్పిటల్8 February 2020NoneElevated
4Musheerabadముషీరాబాద్8 February 2020NoneElevated
5R.T.C. Cross Roadsఆర్.టి.సి క్రాస్ రోడ్8 February 2020NoneElevated
6Chikkadpallyచిక్కడపల్లి8 February 2020NoneElevated
7Narayangudaనారాయణగూడ8 February 2020NoneElevated
8Sultan Bazaarసుల్తాన్ బజార్8 February 2020NoneElevated
9M.G. Bus Stationఎం.జి బస్ స్టేషన్8 February 2020Red LineElevated
10Salarjung Museumసలార్జున్ మ్యూసియంYet to start construction NoneElevated
11Charminarచార్మినార్NoneElevated
12Shah-Ali-Bandaషా-అలీ-బండాNoneElevated
13Shamsherganjశంషేర్గంజ్NoneElevated
14Jungamettaజుంగమెట్టNoneElevated
15Falaknumaఫలక్నుమాFalaknuma railway stationElevated

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.