KD Keris (111)
KD Keris is the lead ship of Keris-class littoral mission ship of the Royal Malaysian Navy. She built by Chinese company China Shipbuilding and Offshore International Co. Ltd and this class of ship was the first major Chinese made equipment purchased by RMN.[3][4]
KD Keris (111) | |
History | |
---|---|
Malaysia | |
Name | KD Keris |
Builder | China Shipbuilding and Offshore International Co. Ltd |
Launched | 15 April 2019 |
Commissioned | 6 January 2020 |
Homeport | Sepanggar, Sabah |
Status | In active service |
General characteristics | |
Class and type | Keris-class littoral mission ship |
Displacement | 700 long tons (711 t) full load |
Length | 69 m (226 ft 5 in) |
Beam | 9 m (29 ft 6 in) |
Draught | 2.8 m (9 ft 2 in) |
Speed | 24 knots (44 km/h) |
Range | 2,000 nautical miles (3,700 km) at 15 knots (28 km/h) |
Complement | 45 |
Sensors and processing systems |
|
Armament |
Development
Keris was first built on 31 July 2018 at Wucang Port, Wuhan and was launched by then wife of the Minister of Defense, Normah Alwi on 15 April 2019. Keris physical handover ceremony to the Government of Malaysia was completed by the Final Acceptance Committee led by the Secretary of the Procurement Division, Ministry of Defense, Datuk Ahmad Husaini Abdul Rahman, on 31 December 2019. She then commissioned on 6 January 2020 at China Shipbuilding and Offshore International Co. Ltd facility in Wucang Port, Qidong, Shanghai, China.[5][6]
References
- "PJ17". deagel.com. Retrieved 31 January 2020.
- "Keris On Sea Trials". malaysiandefence.com. 19 October 2019. Retrieved 31 January 2020.
- "Malaysia aims to replace all 50 ships in navy". The Straits Times. 22 March 2017. Retrieved 1 August 2018.
- "Littoral Mission Ship". Globalsecurity.org. Retrieved 31 January 2020.
- "Keris Launched". malaysiandefence.com. 15 April 2019. Retrieved 31 January 2020.
- "Royal Malaysian Navy commissions first Keris-class Littoral Mission Ship". Jane's 360. 6 January 2020. Retrieved 31 January 2020.