Kamojang

Kamojang, popularly known as Kawah Kamojang or (the Kamojang crater), is a geothermal field and tourist spot in West Java, Indonesia. The crater is located in sub-district (kecamatan) Ibun in the Bandung Regency, approximately 45 km to the southeast of Bandung through the towns of Majalaya and Ibun. The crater can also be reached from the opposite direction through the town of Garut, in Garut Regency (the distance by road from Garut to the northwest through the township of Samarang is around 25 km).

Kamojang
Work at Kawah Kamojang in 1935
Highest point
Elevation1,730 m (5,680 ft)[1]
Coordinates7°07′30″S 107°48′00″E
Geography
Kawah Kamojang is located in Java
Kawah Kamojang
Kawah Kamojang
Kawah Kamojang is located in Indonesia
Kawah Kamojang
Kawah Kamojang
Kawah Kamojang (Indonesia)
Geology
Mountain typestratovolcano
Last eruptionPleistocene

The volcano that the crater is located on is Mount Guntur but the crater itself is listed as an active volcano of Indonesia because of its geothermal activities.[1]

Geothermal activities

Kamojang Geothermal Power Plant Complex
CountryIndonesia
LocationGarut, West Java
Coordinates7°07′30″S 107°48′00″E
StatusOperational
Commission date1983(Unit 1)
1987 (Unit 2 & 3)
2008 (Unit 4)
2015 (Unit 5)
Operator(s)PT Pertamina Geothermal Energy Tbk
Site elevation
  • 1,730 m (5,680 ft)
Power generation
Units operational5
Nameplate capacity235 MW:
1 × 30 MW (Unit 2)
2 × 55 MW (Unit 2 & 3)
1 × 60 MW (Unit 4)
1 × 35 MW (Unit 5)
External links
CommonsRelated media on Commons

There is a long history of interest in the possibility of developing the geothermal potential of the Kamojang region. The first geothermal wells in Indonesia were drilled at Kamojang in 1926 by the Dutch colonial government. The current geothermal field is on the slopes of Mt Guntur, about 7 km to the west of the peak of the mountain. There are four operating geothermal generating units with a capacity of 200 MW. The fourth unit began operation in January 2013. A fifth unit with a planned capacity of 35 MW was contracted in October 2013 with estimated construction completion by July 2015.[2]

Kamojang is the site of the first modern geothermal site in Indonesia, commissioned by former president Soeharto in January 1983. The 5 current units, with a capacity of 235 MW, are owned and operated by PT Pertamina Geothermal Energy, a subsidiary of Indonesia's major state-owned companies, PT Pertamina.[3][4]

See also

References

  1. "Kawah Kamojang". Global Volcanism Program. Smithsonian Institution. Retrieved 2006-12-21.
  2. ', "Bloomberg New Energy Finance", 7 October 2013.
  3. 'Pertamina, PLN to jointly develop power plants' Archived 2012-10-15 at the Wayback Machine, The Jakarta Post, 11 August 2000.
  4. "Kamojang". Pertamina Geothermal Energy Tbk (in Indonesian). Retrieved 2023-03-20.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.