Kerang train accident

The Kerang train accident occurred on 5 June 2007 at about 13:40 AEST in the Australian state of Victoria, approximately 6 kilometres (3.7 mi) north of the town of Kerang in the state's northwest, and 257 kilometres (160 mi) north-northwest of the city of Melbourne.

Kerang train accident
Details
Date5 June 2007
13:40
LocationKerang, Victoria
257.2 km (159.8 mi) NNW from Melbourne
CountryAustralia
LinePiangil railway line
OperatorV/Line
Incident typeLevel crossing collision
CauseTruck driver error
Statistics
Trains1
Passengers36
Deaths11
Injured23

Victoria Police confirmed that 11 people were killed and 23 injured in the crash,[1][2] making this to date the deadliest Australian rail disaster since 1977. As of 11:00 am on 6 June, two passengers remained unaccounted for.[3] The site was visited on the evening of 5 June by the Premier of Victoria, Steve Bracks, who called it a "horrific scene".[4]

Background

Level crossing

The Murray Valley Highway crosses the Piangil railway line about 6 km (3.7 mi) north-west of the town of Kerang. The level crossing at this location, numbered Y2943, was protected prior to the accident by warning signs, road markings, flashing lights and warning bells, all of which were later found to be operational at the time of the crash.[5]

The highway is a single-carriageway, two-lane bitumen road, with a gentle curve about 300 m (980 ft) prior to the level crossing when approaching from the south. At the level crossing, the speed limit was 100 km/h (62 mph).[6] The railway is a single line with a speed limit of 90 km/h (56 mph) for passenger trains.[7]

One fatal crash had previously occurred at the crossing, in 1995, but a database maintained by Transport Safety Victoria had recorded a number of near misses between rail and road vehicles in the months leading up to the 2007 accident.[8]

Train

N460 pictured some months after the accident, in 2008.

Southbound V/Line passenger train 8042 was a regularly scheduled passenger service from Swan Hill to Southern Cross, Melbourne. The train consisted of N class locomotive N460 and three carriages, designated set N7: ACN21, a first class carriage; BRN20, an economy class carriage with buffet facilities; and BN19, a second economy carriage.[9] It departed Swan Hill at 1.00 pm with a scheduled arrival time in Kerang of 1.39 pm.

The train was crewed by a fully qualified V/Line driver from Melbourne, and two conductors, one from Bendigo and the other from Melbourne, who were jointly responsible for passenger services and operating the buffet.[10]

34 passengers were on board at the time of the accident: 6 in the leading carriage, ACN21, 21 in BRN20, and 7 at the rear of the train in BN19.[11]

Truck

A Kenworth K104 similar to the prime mover involved in the accident.

The semi-trailer truck involved in the accident consisted of a refrigerated curtain sided trailer hauled by a Kenworth K104B prime mover.[12] Its driver, Christiaan Scholl, was transporting a load of timber and pipe fittings from Victoria to South Australia on behalf of Canny Carrying Company.[13]

On 5 June, Scholl departed Wangaratta about 90 minutes later than was usual for his cross-border trip. It was usual for him to cross the railway line at Kerang around noon.[14]

Incident

The train involved in the accident was a locomotive-hauled service from Swan Hill that departed for Melbourne at 13:00,[15] operated by an N class locomotive and three car N type carriage set. The collision caused the closure of nearby sections of the Murray Valley Highway.[4]

Southbound V/Line passenger train service 8042, which consisted of locomotive N460 and carriage set N7, was run into by a northbound semi-trailer truck, at a level crossing where the Piangil railway line crosses the Murray Valley Highway. The locomotive and first carriage escaped impact as the truck swerved left. However, the second carriage and third carriages were both struck, causing severe damage to the carriages and fatal injury to 11 passengers.

Given that the truck had a mass of about 40 tonnes, and had been travelling at 100 km/h,[16] its impact was devastating. The truck, owned by the Canny Carrying Company of Wangaratta and driven by Christiaan Scholl, was extensively damaged on impact with the carriages, although Scholl only sustained shoulder and head injuries.

One survivor recalled, "A lady sitting across from me saw the truck and closed her eyes. You just wonder how anybody got out."[17]

Ursula McGuinnes, general manager of Stakeholder Relations for V/Line, noted that the level crossing was protected with lights and bells, which were still sounding and flashing when emergency services arrived, but did not have boom gates.[4]

According to Kerang resident and Shire of Gannawarra councillor Lui Basile, there had been a recent timetable change on the line.[17]

On 15 February 2008, the Office of the Chief Investigator, Department of Infrastructure, released Rail Safety Report 2007/09, detailing the findings of the investigation into the collision. The report noted that the train, truck, and level crossing warning signals were all serviceable prior to the incident, and both the train and truck driver were familiar with their respective routes. The report noted that the truck driver did not agree to be interviewed by investigators, and concluded that: "For reasons not determined the truck driver did not respond in an adequate time and manner to the level crossing warning devices."[18]

Response

Emergency response was swift, with a number of seriously injured people airlifted to Melbourne, while others were taken by road or air ambulance to nearby Kerang Hospital.[4] The State Premier Steve Bracks flew to the crash scene on the evening of 5 June with the Victoria Police Assistant Commissioner Noel Ashby and the Opposition transport spokesman Terry Mulder, calling it a "horrific scene".[4][19]

Both the Federal Minister for Transport and Regional Services Mark Vaile and the Prime Minister John Howard spoke to the media, offering Federal government aid to families as well as the investigative assistance of the Australian Transport Safety Bureau.[4][17] Leader of the Opposition Kevin Rudd said that he was "saddened and shocked" by the incident and went on to say that his "thoughts and prayers tonight are with those still fighting for their life in hospitals throughout Victoria."[20]

V/Line announced it would support a full inquiry and had arranged counselling for the passengers and their families. Chief executive Rob Barnett said the incident would raise questions about the safety of level crossings, but asked everyone to resist jumping to conclusions.[15] Buses replaced trains between Bendigo and Swan Hill until the crash site was cleared and the site released by accident investigators.[21][22]

Due to the nature of land surrounding the accident site, some earthworks were required to provide a solid footing for the heavy lifting equipment needed to remove the rolling stock damaged in the accident.[23] Once removed from the line, the damaged rolling stock was transported to Melbourne for further investigation,[23] with some of the carriages still in storage in 2008.[24]

The driver of the semi-trailer, Christiaan Scholl, was charged with one count of culpable driving and on 7 June was bailed to appear before Bendigo Magistrates Court on 19 December. A police spokesman stated that more charges were expected to be laid in due course.[25][26] On 18 August 2008, Scholl was committed for trial on 11 charges of causing death by culpable driving and 8 charges of causing injury by negligent driving. His trial began in Bendigo on 26 May 2009. On 13 June 2009, he was found not guilty on all charges.[27] A group of crash victims indicated they would pursue a civil action against Scholl.[28] One of the train's conductors settled his claim against Scholl out of court in 2011 for an undisclosed sum of money.[29]

Inquest

An inquiry into the Kerang rail disaster was due to begin on 18 January 2011, but was delayed by a day due to flooding in the region.[30] The inquest began on 19 January at the Coroner's Court in Bendigo. After a minute's silence, coroner Dr Jane Hendtlass heard evidence from the driver of the train. The inquest was scheduled to run over 58 days.[31]

The inquest ultimately investigated 15 other deaths at Victorian level crossings. Its findings were released on 21 October 2013, and included recommendations that V/Line's emergency procedure and training be improved, that level crossing design be revisited to examine the best ways to alert drivers to approaching trains, and that better records be kept of level crossing incidents.[32]

See also

References

  1. Oakes, Dan; Doherty, Ben, Webb, Carolyn, Guerrera, Orietta (5 June 2007). "11 die in train crash". The Age. Archived from the original on 14 August 2009. Retrieved 6 June 2007.{{cite news}}: CS1 maint: multiple names: authors list (link)
  2. "No boom gates at level crossing crash scene". ABC News. 5 June 2007. Archived from the original on 23 August 2010. Retrieved 6 June 2007.
  3. "Train crash truckie 'sorry'", The Age, 6 June 2007 Archived 25 December 2007 at the Wayback Machine (Retrieved 6 June 2007)
  4. "Three still missing after Vic train smash". ABC News. 6 June 2007. Archived from the original on 29 October 2016. Retrieved 5 January 2018.
  5. CITMSI 2008, p. 45.
  6. CITMSI 2008, p. 50.
  7. CITMSI 2008, p. 44.
  8. CITMSI 2008, p. 49.
  9. CITMSI 2008, p. 17.
  10. CITMSI 2008, p. 15.
  11. CITMSI 2008, p. 16.
  12. CITMSI 2008, pp. 20–21.
  13. Coroner 2013, p. 15.
  14. Coroner 2013, p. 16.
  15. "V/Line to support full scale inquiry". V/Line Passenger Pty. Ltd. 5 June 2007. Archived from the original on 6 July 2011. Retrieved 6 June 2007.
  16. "Truckie 'speed error' behind 11 Kerang deaths". news.com.au. 26 May 2009. Archived from the original on 12 August 2014. Retrieved 21 January 2011.
  17. "Eight killed in train crash". The Sydney Morning Herald. 5 June 2007. Archived from the original on 7 June 2007. Retrieved 6 June 2007.
  18. "Level Crossing Collision V/Line Passenger Train 8042 and a Truck Near Kerang, Victoria 5 June 2007" (PDF). Chief Investigator, Transport and Marine Safety Investigations. Department of Infrastructure, Victoria. 15 February 2008. Archived from the original (PDF) on 24 March 2012. Retrieved 16 May 2008.
  19. "Bracks to fly to train crash scene". The Age. 5 June 2007. Archived from the original on 8 June 2007. Retrieved 5 June 2007.
  20. "PM offers train crash help". The Australian. 5 June 2007. Archived from the original on 11 June 2007. Retrieved 5 June 2007.
  21. "Victoria train crash toll now eight dead". The Age. 5 June 2007. Archived from the original on 7 June 2007. Retrieved 5 June 2007.
  22. "Bendigo Line ~ Service disruptions ~ Tue 5 June". V/Line Passenger Pty. Ltd. 5 June 2007. Archived from the original on 6 July 2011. Retrieved 6 June 2007.
  23. "V/Line prepares for rail recovery program". V/Line Passenger Pty. Ltd. 6 June 2007. Archived from the original on 17 February 2012. Retrieved 7 June 2007.
  24. "Kerang collision carriage BRN20 stored at Newport workshops". www.flickr.com. 4 October 2008. Archived from the original on 11 May 2021. Retrieved 23 March 2009.
  25. "Man charged over Kerang collision". Victoria Police. 7 June 2007. Archived from the original on 28 September 2007. Retrieved 8 June 2007.
  26. "Kerang crash driver charged". news.com.au. 7 June 2007. Archived from the original on 9 June 2007. Retrieved 7 June 2007.
  27. Hagan, Kate (13 June 2009). "Kerang driver not guilty". The Age. Archived from the original on 5 January 2018. Retrieved 5 January 2018.
  28. Best, Catherine; Turnbull, Jeff (14 June 2009). "Anger at Kerang train crash verdict". The Australian. Archived from the original on 12 October 2017. Retrieved 5 January 2018.
  29. Petrie, Andrea (25 July 2011). "Conductor settles action". The Age. Archived from the original on 5 January 2018. Retrieved 5 January 2018.
  30. "Kerang rail disaster inquest begins". ABC News. 19 January 2011. Archived from the original on 26 March 2011. Retrieved 5 January 2018.
  31. Lowe, Adrian (19 January 2011). "Kerang train crash inquest starts with minute's silence". The Age. Archived from the original on 5 January 2018. Retrieved 5 January 2018.
  32. Cooper, Adam (21 October 2013). "Coroner's findings leave families of Kerang train crash victims unsatisfied". The Age. Archived from the original on 5 January 2018. Retrieved 5 January 2018.

Bibliography

35°42′05″S 143°52′47″E

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.