Silver Line (Delhi Metro)

The Silver Line (Line 10) is an under construction line of Delhi Metro which is expected to be completed by September 2025.[1]

Silver Line
(Line 10)
Overview
StatusUnder Construction
OwnerDelhi Metro
LocaleDelhi
Termini
Stations15 , Elevated: 4, Underground: 11
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
History
Planned opening2025 (Phase 4)
Technical
Line length23.62 km (14.68 mi)
CharacterUnderground and Elevated
Route map

Delhi Aerocity
Mahipalpur
Vasant Kunj Sector-D
Kishangarh
Chhatarpur
Chhatarpur Mandir
IGNOU
Neb Sarai
Saket G-Block
Ambedkar Nagar
Khanpur
Sangam Vihar - Tigri
Anandmayee Marg
Tughlakabad Railway Colony
Tughlakabad Station

This 23.622 km line consists of 15 stations (4 Elevated & 11 Underground) from Tughlakabad to Delhi Aerocity. This Line is a part of Phase 4 of Delhi Metro.[2]

Stations

The stations proposed for the Silver Line are:[2][3]

Silver Line
No. Station Name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1 Delhi Aerocity दिल्ली एरोसिटी 4 2025 Airport Express Underground Island None None
2 Mahipalpur महिपालपुर 4 2025 Underground Side None None
3 Vasant Kunj Sector-D वसंत कुंज सैक्टर-डी 4 2025 Underground Side Vasant Kunj Depot At Grade
4 Kishangarh किशनगढ़ 4 2025 Underground Side None None
5 Chhatarpur छत्तरपुर 4 2025 Yellow Line Underground Side None None
6 Chhatarpur Mandir छत्तरपुर मंदिर 4 2025 Underground Island None None
7 IGNOU इग्नू 4 2025 Underground Island None None
8 Neb Sarai नेब सराय 4 2025 Underground Island None None
9 Saket G-Block साकेत जी-ब्लॉक 4 2025 Brown Line
(Phase 4 - Under Construction)
Elevated Side None None
10 Ambedkar Nagar अम्बेडकर नगर 4 2025 Elevated Side None None
11 Khanpur ख़ानपुर 4 2025 Elevated Side None None
12 Sangam Vihar - Tigri संगम विहार 4 2025 Elevated Side None None
13 Anandmayee Marg आनंदमयी मार्ग 4 2025 Underground Island None None
14 Tughlakabad Railway Colony तुग़लक़ाबाद रेलवे कॉलोनी 4 2025 Underground Island None None
15 Tughlakabad Station तुग़लक़ाबाद 4 2025 Violet Line Underground Island Sarita Vihar Depot At Grade

In November 2020, DMRC changed the alignment of the Silver line as per the instructions of Archaeological Survey of India to circumvent the Qutub Minar and more than a hundred other historical structures in Mehrauli.[2]

Train Info

Silver Line
Rakes
Train Length
Train Gauge
Electrification
Train's Maximum Speed
Train Operation Delhi Metro

References

  1. "Delhi: Covid, green concerns put Phase-IV in low gear; push targets back". The Times of India. 14 June 2022. Retrieved 16 June 2022.
  2. Sidharatha Roy (2 December 2020). "Delhi Metro News: Delhi Metro steers clear of Qutub Minar | Delhi News - Times of India". The Times of India. Retrieved 14 April 2021.
  3. "Delhi Metro map". www.delhimetrorail.com. Retrieved 21 April 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.