Koman Hydroelectric Power Station
The Koman Hydroelectric Power Station is a large hydroelectric power station, for which a dam on the Drin River was built. The dam is near the settlement of Koman, northern Albania. It is the second of three dams on the Drin River; the Fierza Hydroelectric Power Station upstream, and the Vau i Dejës Hydroelectric Power Station downstream. The dam, 130m tall, was completed in 1985 and the reservoir was filled with water at full capacity in 1986.[1]
Komani Hydroelectric Power Station | |
---|---|
Location | Albania |
Coordinates | 42°06′23″N 19°49′37″E |
Construction began | 1979 |
Opening date | 1985 |
Owner(s) | Albanian Power Corporation |
Dam and spillways | |
Type of dam | Rock-fill dam |
Impounds | Drini River |
Height | 130 m (427 ft) |
Length | 275 m (902 ft) |
Spillway capacity | 3,400 m3/sec |
Reservoir | |
Creates | Koman Reservoir |
Total capacity | 16,000,000,000 m3 (5.7×1011 cu ft) |
Surface area | 12 km2 (5 sq mi) |
Maximum water depth | 96 m (315 ft) |
Power Station | |
Operator(s) | Albanian Power Corporation |
Turbines | 4 × 150 MW |
Installed capacity | 600 MW |
Completed in 1986, the power station consists of four turbines of French origin with a nominal capacity of 150 MW each, totalling the installed capacity to 600 MW.[2]
References
- Paul G. Marinos (1 January 2001). Engineering Geology and the Environment. A.A. Balkema. p. 3707. ISBN 978-90-5410-882-5. Retrieved 26 September 2013.
- Komani Hydro Power Plant
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.