Line 10 (Chongqing Rail Transit)
Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017.[1] Rapid trains started operating on Line 10 in June 2020.[2]
Line 10 | |
---|---|
10 | |
Overview | |
Native name | 重庆轨道交通10号线 |
Status | Operational |
Line number | 10 |
Locale | Chongqing, China |
Termini | |
Stations | 23 |
Service | |
Type | Rapid transit |
System | Chongqing Rail Transit |
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. |
History | |
Opened | 28 December 2017 |
Technical | |
Line length | 38.5 km (23.9 mi) (operational) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | 1500 V DC Overhead line |
Operating speed | 120 km/h (75 mph) (Peak) |
The trains on Line 10, which links Jiangbei Airport and Chongqing North railway station, are equipped with a luggage rack on each car.[3]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wangjiazhuang – Liyuchi | 28 December 2017 | 33.7 km (20.94 mi) | 18 | Phase 1 |
Chongqing North Station South Square | 28 December 2018 | infill station | 1 | |
Liyuchi – Houbao[4] | 18 January 2023 | 6 km (3.7 mi)[4] | 4 | Phase 2 (initial section) |
Stations (north to south)
Service routes |
Station № |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|---|
R | L | English[5] | Chinese | |||||
● | ● | 10/27 | Wangjiazhuang | 王家庄 | Int'l Expo | - | 0 | Yubei |
| | ● | 10/26 | Yuelai | 悦来 | Int'l Expo | 2.04 | 2.04 | |
| | ● | 10/25 | Central Park West | 中央公园西 | 5 | 2.71 | 4.75 | |
| | ● | 10/24 | Central Park | 中央公园 | 1.09 | 5.84 | ||
| | ● | 10/23 | Central Park East | 中央公园东 | 9 | 0.82 | 6.66 | |
| | ● | 10/22 | Lushan | 鹿山 | 1.64 | 8.30 | ||
| | ● | 10/21 | Yubei Square | 渝北广场 | 2.05 | 10.35 | ||
● | ● | 10/20 | Terminal 2 of Jiangbei Airport | 江北机场T2航站楼 | 3 CKG | 0.74 | 11.09 | |
● | ● | 10/19 | Terminal 3 of Jiangbei Airport | 江北机场T3航站楼 | 15 CKG | 2.22 | 13.31 | |
| | ● | 10/18 | Changhe | 长河 | 5.31 | 18.62 | ||
| | ● | 10/17 | Huanshan Park | 环山公园 | 1.85 | 20.47 | ||
| | ● | 10/16 | Shangwanlu | 上湾路 | 9 | 1.67 | 22.14 | |
| | ● | 10/15 | Sanyawan | 三亚湾 | 2.74 | 24.88 | ||
| | ● | 10/14 | Minxinjiayuan | 民心佳园 | 2.08 | 26.96 | ||
● | ● | 10/13 | Chongqing North Station North Square[lower-alpha 1] | 重庆北站北广场 | 4 YW CUW |
2.61 | 29.57 | |
● | ● | 10/12 | Chongqing N. Station S. Square[lower-alpha 1] | 重庆北站南广场 | 3 Loop YW CUW |
0.60 | 30.17 | |
| | ● | 10/11 | Longtousi Park | 龙头寺公园 | 0.87 | 31.04 | ||
● | ● | 10/10 | Hongtudi | 红土地 | 6 | 1.63 | 32.67 | Jiangbei |
● | ● | 10/09 | Liyuchi | 鲤鱼池 | 9 | 1.09 | 33.76 | |
● | ● | 10/08 | Zengjiayan | 曾家岩 | 2 | 0.82 | 34.58 | Yuzhong |
● | ● | 10/07 | Chongqing People's Auditorium | 大礼堂 | 0.92 | 35.5 | ||
● | ● | 10/06 | Qixinggang | 七星岗 | 1 18 | 0.89 | 36.39 | |
● | ● | 10/05 | Houbao[4] | 后堡 | 2.12 | 38.51 | Nan'an | |
10/04 | Nanping | 南坪 | 3 27 | 1.22 | 39.73 | |||
10/03 | Wanshoulu | 万寿路 | 0.98 | 40.71 | ||||
10/02 | Nanhu | 南湖 | Loop | 1.27 | 41.98 | |||
10/01 | Lanhualu | 兰花路 | 1.28 | 43.26 | ||||
Notes
- The former translation is North/South Square of Chongqingbei Railway Station, which has been replaced since the opening of Line 10's station
References
- "重庆市主城形成多层次立体交通体系". May 16, 2017.
- "轨道交通将跨线运行 唐家沱到重图不到40分钟-新华网". m.xinhuanet.com. Retrieved August 27, 2020.
- Jiang, Yan; Hu, Jie (December 18, 2017). 轨道也将有"超车道"! 五号线十号线将分"快慢车"-上游新闻 汇聚向上的力量. Chongqing Morning Paper (in Chinese (China)). Retrieved February 24, 2018.
- "重庆轨道交通10号线二期通过竣工验收". January 9, 2023.
重庆轨道交通10号线二期(鲤鱼池至后堡)呈南北走向,线路全长6公里
- "重庆轨道交通线网图". Archived from the original on June 9, 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.