Line 11 (Beijing Subway)

Line 11 of the Beijing Subway (Chinese: 北京地铁11号线; pinyin: běijīng dìtiě shíyī hàoxiàn) is a rapid transit line of the Beijing Subway.[7] The line opened on December 31, 2021.[3] Line 11's color is grapefruit.

Line 11
Line 11 train leaving Jin'anqiao station
Overview
Other name(s)M11 (planned name)
Winter Olympic Branch Line
StatusOperational
Termini
Stations3 (in operation)[1]
4 (in 2023)
Service
TypeRapid transit
SystemBeijing Subway
Rolling stockType A, 4-car / 6-car[2]
History
Opened31 December 2021 (2021-12-31)[3]
Technical
Line length1.54 km (0.96 mi) (in operation)
4.2 km (2.6 mi)[4][5]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed100 km/h (62 mph)[6]
Route map

Moshikou
Jingmen railway crossing
Jin'anqiao
Beixin'an
Xinshougang (Shougang Park)
extension to Lize Shangwuqu and Yangqiao

Opening timeline

SegmentCommencementLengthStation(s)Name
Jin'anqiao — Shougang Park 31 December 2021 1.5 km (0.93 mi)[4] 3 Phase 1

Stations

Phase 1

All stations are in Shijingshan.

Station Name Connections Nearby Bus Stops Distance
km[8][9]
English Chinese
Moshikou 模式口
Jin'anqiao 金安桥  6   S1  325 336 337 358 370 396 472 489 502 876 892 920 921 929 931 932 941 941快 948 959 961 977 977快 981 BRT4(快速公交4) M3 M4 M5 M6 M7 M11 M16 M20 M22 专61 专110 专148 0.000
Beixin'an 北辛安 337 941 959 专61 专148 0.850
Xinshougang (Shougang Park)[1] 新首钢 992 专108 专218 0.689 1.539

Phase 2

  • Under Planning.
  • There are suggestions to add an infill station between Qingta and Lianhuaqiao stations on Phase 2 of Line 11.[10][11]
Station Name[12] Connections Nearby Bus Stops Distance
km
English Chinese
Xingcai 型材    
Guoluchang Nanlu 锅炉厂南路    
Yamenkouxi 衙门口西    
Tiyuchang Nanjie[13] 体育场南街  1  (Branch) (Planned)[13]    
Yamenkoudong 衙门口东    
Lugu Dajie 鲁谷大街    
Wujiacun 吴家村    
Xiaowayao 小瓦窑    
Qingta 青塔    
Lianhuaqiao 莲花桥  10     
Beijing West railway station 北京西站  7   9 
China Railway Beijing West railway station BXP
   
Maliandao 马连道    
Lize Shangwuqu 丽泽商务区  14   16  (U/C)
 Daxing Airport  (U/C)
   
Caihuyingqiaodong 菜户营桥东    
Beijing South railway station 北京南站  4   14 
China Railway Beijing South railway station VNP
   
Yangqiao 洋桥    

History

Old planning

In 2006, Line 11 was originally designed as an L-shaped line from Wanliu to Dahongmen, which together with the L-shaped Line 10, form a subway ring route.[14] After Line 10 Phase II took over the entire ring route, Line 11 was displaced.

In January 2010, the government of Shijingshan District disclosed plans for a Line 11 in western Beijing that would traverse the Shougang (Beijing Capital Steel) complex and intersect with Lines 4 and 16.[15][16]

Phase 1

Construction started on November 13, 2019.[7] The western section (Phase 1) of Line 11 (Moshikou station — Xinshougang station), also known as "Winter Olympic Branch Line", is 4.2 km (2.6 mi) in length with 4 stations.[4][5] It is fully underground.[17][18]

Jin'anqiao, Beixin'an and Xinshougang (Shougang Park) stations opened on December 31, 2021. Moshikou station will open in 2023.[19]

Phase 2

According to the information released on January 11, 2022, Phase II of Line 11 to Lize Shangwuqu and Yangqiao is included in the "Beijing Rail Transit Phase III Construction Plan".[20] In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) confirmed that it will be 23.8 km (14.8 mi) long with 17 stations.[21]

References

  1. "两条地铁新段年底开通,京西轨道交通动脉即将正式打通". Archived from the original on 2021-12-14. 随着地铁11号线金安桥站至新首钢站区间、S1线金安桥站至苹果园站区间年底前开通
  2. "『北京』地铁11号线西段首列车下线". 2021-07-30.
  3. "北京地铁11号线西段等轨道新线2021年开通" [Beijing Subway Line 11 West Section and other new metro lines to open in 2021]. 2021-01-08. Archived from the original on 2021-02-17.
  4. "北京轨道交通11号线西段(冬奥支线)工程环境影响报告书" (PDF). Retrieved 2020-02-21.
  5. "地铁冬奥支线分秒必争保工期". 首都建设报. 2020-02-20. Archived from the original on 2020-02-20. Retrieved 2020-02-21.
  6. "北京地铁冬奥支线规划来了!全天运营18小时,更多细节披露". 2019-07-09.
  7. "北京地铁11号线西段(冬奥支线)01标工程正式开工". 2019-11-14.
  8. "11号线路网车站站间距信息". Retrieved 2022-02-18.
  9. "站间距信息". 北京地铁.
  10. "关于11号地铁在青塔站和莲花桥站之间增设一站". Archived from the original on 2023-04-20.
  11. "北京地铁11线东段站点设置". Archived from the original on 2023-04-20.
  12. "地铁11号线二期已启动西段东延线站位选线选址工作". Archived from the original on 2023-04-20.
  13. "北京地铁1号线今年将建支线". 2023-03-03.
  14. (Chinese) "北京再添三条地铁线 六号十一号线正岩土勘探" 北京青年报 Archived 2007-01-25 at the Wayback Machine 2006-12-04
  15. (Chinese) "北京地铁M11线2020年启动建设 将纵贯首钢整个厂区" Archived 2011-07-20 at the Wayback Machine Jan. 13, 2010
  16. (Chinese)"北京地铁16号线车站设计方案展示" Archived 2013-10-07 at the Wayback Machine 2013.4.25
  17. "北京石景山:2019年力争开建M11线冬奥支线". 2019-01-11. Archived from the original on January 11, 2019.
  18. "北京轨道交通11号线西段(冬奥支线)工程 社会稳定风险分析公众参与信息公示". 2019-04-09. Archived from the original on 2019-05-29. Retrieved 2019-05-23.
  19. "年底交付运营!地铁11号线模式口站最新进展". 2022-11-15.
  20. "北京市轨道交通第三期建设规划环境影响评价第一次公示_信息公开_北京市基础设施投资有限公司". www.bii.com.cn. Retrieved 2022-01-27.
  21. "北京市轨道交通第三期建设规划(2022-2027年)环境影响报告书(征求意见稿).pdf" (PDF). China Academy of Railway Sciences Co., Ltd. 2022-07-08. Archived from the original (PDF) on 2022-07-08. Retrieved 2022-07-08.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.