Line 21 (Shanghai Metro)
Line 21 will be a future subway line on the Shanghai Metro. It will run in a north–south direction through Pudong, connecting Gaohang in Waigaoqiao to the Disney Resort. The first phase will be about 28 km (17 mi) long with 10 stations.[1] Stations will have passing loops to allow for express and local stopping patterns.[1]
Line 21 | |
---|---|
21 | |
Overview | |
Other name(s) | Line 24 (between 2014 and 2016) |
Native name | 上海地铁21号线 |
Status | Under construction |
Locale | Pudong, Shanghai |
Termini |
|
Connecting lines | 2 6 9 11 12 13 14 |
Stations | 28 |
Website | www |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Operator(s) | Shanghai Maglev Development Co., Ltd. |
Depot(s) | Liuchen Road Depot |
Rolling stock | Type A 6-car trains |
History | |
Commenced | January 4, 2022 |
Planned opening | 2026 |
Technical | |
Track length | 48 km (30 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Operating speed | 100 km/h (62 mph) |
The line was announced by the Municipal government in 2016.[2][3] Previous plans in 2014 designated the Disney Resort — Guanglan Road section as Line 24.
History
Shanghai metro line 21 opening history | ||||||
---|---|---|---|---|---|---|
Segment | Commenced | Opened | Length | Station(s) | Name | Investment |
Dongjing Road - Liuchen Road | 4 Jan 2022 | exp 2026 | 27.964 km (17.4 mi) | 18 | Phase 1 | 36.956 billion yuan |
Liuchen Road - Pudong Airport T3 Terminal | planned | 14 km (8.7 mi) | 4 | Phase 2 | ||
Dongjing Road - Wusongkou International Cruise Terminal | planned | 7 | Phase 3 | |||
Stations
Service routes
Shanghai metro line 21 service routes | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||
Routes | Station name | Connections | Distance | Location | Open- ing | |||||
L | R | English | Chinese | km | min | |||||
Wusongkou International Cruise Terminal | 吴淞口国际邮轮码头 | 22 (planned) | 0.0 | Baoshan | Phase III | |||||
Binjiang Forest Park | 滨江森林公园 | Pudong | ||||||||
Linggao Road | 凌高路 | |||||||||
Jiangdong Road | 江东路 | |||||||||
West Gaoqiao | 高桥西 | 10 | ||||||||
Qingxi Road | 清溪路 | |||||||||
Gaoqiao New Town | 高桥新城 | |||||||||
Qifan Road | 启帆路 | 20 (planned) | ||||||||
Dongxu Road | 东煦路 | |||||||||
● | ● | Dongjing Road | 东靖路 | 6 | 0.0 | Pudong | Phase I 2027 | |||
● | ● | North Yanggao Road | 杨高北路 | 12 | ||||||
● | | | Linghe Road | 凌河路 | |||||||
● | ● | Jinqiao | 金桥 | 9 | ||||||
● | | | Yunqiao Road | 云桥路 | |||||||
● | ● | Pudong Football Stadium | 浦东足球场 | 14 | ||||||
● | | | Longdong Avenue | 龙东大道 | |||||||
● | ● | Guanglan Road | 广兰路 | 2 | ||||||
● | | | Gaosi Road | 高斯路 | |||||||
● | | | Zhangheng Road | 张衡路 | |||||||
● | ● | Xuelin Road | 学林路 | 13 | ||||||
● | | | Junmin Road | 军民路 | |||||||
● | | | Kangnan Road | 康南路 | |||||||
● | ● | Zhangjiang | 张江 | Airport Link | ||||||
● | | | South Shenjiang Road | 申江南路 | |||||||
● | ● | Disney Resort | 迪士尼 | 11 | ||||||
● | | | Tanghuang Road | 唐黄路 | |||||||
● | | | Liuchen Road | 六陈路 | 28 | ||||||
● | | | Shixin Road | 施新路 | Pudong | East extension | |||||
● | | | Jinwen Road | 金闻路 | |||||||
● | ● | Shanghai East railway station | 上海东站 | Airport Link Lianggang Express East West Link (planned) (u/c) | ||||||
● | ● | Pudong Airport T3 Terminal | 浦东机场T3航站楼 | 2 Maglev Shanghai Pudong Airport APM Airport Link Lianggang Express | 42 | |||||
Important stations
The line will interchange with various lines in Pudong at the following stations:
References
- "上海轨道交通21号线(一期)环评报批前公示-基础工程网". www.jcgcw.com. Retrieved 2022-01-17.
- "Shanghai Municipal Government: City mulls plan for nine more Metro projects". publicnow.com. 20 April 2016. Retrieved 24 April 2016.
- 上海市轨道交通近期建设规划(2017-2025)出炉 规划有9条线路 (in Chinese). Shanghai Municipal Government. 19 April 2016. Retrieved 24 April 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.