Line 28 (Beijing Subway)

Line 28 of the Beijing Subway (Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a rapid transit line under construction in Beijing. It was formerly known as CBD line.

Line 28
 28 
Construction site in February 2021
Overview
Other name(s)M28 (planned name)
CBD line
StatusUnder construction[1]
LocaleChaoyang district
Beijing
Termini
Stations9
Service
TypeRapid Transit
SystemBeijing Subway
Rolling stock6-car Type LB
History
Planned opening2025 (2025) (planned)[2]
Technical
Line length8.877 km (5.516 mi) (Phase 1)[3]
CharacterUnderground
Operating speed80 km/h (50 mph)[3]
Route map

Dongdaqiao
Left arrow JiahuihuFuture Science Park North Right arrow
Jintai Xizhao
Left arrow inner – outer Right arrow
Pinggu LowerRight arrow
Guanghualu
Hexinqu
Dawang Lu
Line 14
Tonghui River
Beijing East railway station
Dajiaoting
Guangqulu
Guangqudonglu
Guangqudonglu depot

Construction started in July 2021.[1] It is planned to open in 2025.[2]

List of Stations

Station Name[4] Connections Distance
km
Location
English Chinese
Dongdaqiao 东大桥  6   17   Pinggu  Chaoyang
Jintai Xizhao 金台夕照  10   Pinggu 
Guanghualu 光华路
Hexinqu 核心区
Dawang Lu 大望路  1   14 
Beijing East railway station 北京东站 Sub-Central Beijing East railway station BOP
Dajiaoting 大郊亭  7 
Guangqulu 广渠路
Guangqudonglu 广渠东路

History

In August 2015, planning authorities proposed an underground automatic people mover (APM) line through the Central Business District (CBD).[5]

According to the most recent plan announced in August 2019, the line will run 8.877 km (5.516 mi), have 9 stations from Dongdaqiao to Guangqudonglu.[3] The line was redesigned into a higher capacity light metro line, not an automatic people mover (APM).[3]

A feasibility study for the line was approved in October 2020.[4]

Construction started in July 2021.[1]

Rolling stock

It will use 6-car Type LB linear motor rolling stock, similar to the Capital Airport Express of Beijing Subway, and Guangzhou Metro's Line 4, Line 5 and Line 6.[1]

References

  1. "北京地铁28号线首站启动建设". 2021-07-27.
  2. "CBD:京城老牌商务区升级之旅". 2021-01-25. Archived from the original on 2021-03-12. Retrieved 2021-03-12. 该项目已被列入2020年北京市政府重点工程计划,并计划于2025年建成
  3. "北京地铁28号线最新车站方案公布:5座车站可以换乘". 2019-08-20.
  4. www.bjnews.com.cn. "地铁28号线可行性研究报告批复,纳入今年北京市政府重点工程". www.bjnews.com.cn. Retrieved 2020-10-21.
  5. Cao Zheng (曹政) (13 August 2015). CBD拟通'地下小火车:初步设8站 呈Z形斜穿'. Beijing Daily. Archived from the original on 26 November 2015. Retrieved 12 November 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.