Line 2 (Changchun Rail Transit)

Line 2 of the Changchun Rail Transit (Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun.

Line 2
Line 2 train departing from Jiefang Ave. Station
Overview
StatusOperational
OwnerChangchun
LocaleChangchun, Jilin, China
Termini
  • Qiche Gongyuan
  • Dongfang Square
Stations21
Service
TypeRapid transit
SystemChangchun Rail Transit
Services1
Operator(s)Changchun Rail Transit Corporation
History
Opened30 August 2018 (2018-08-30)
Technical
Line length24.9 km (15.47 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

History

Phase 1

Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.[2]

Western extension

The western extension to Qiche Gongyuan opened on 8 October 2021.[1] The extension is 4.36 km in length.[3]

Opening timeline

SegmentCommencementLengthStation(s)Name
Shuangfeng — Dongfang Square 30 August 2018 20.5 km (12.74 mi)[2] 18 Phase 1
Shuangfeng — Qiche Gongyuan 8 October 2021[1] 4.36 km (2.71 mi)[3] 3 Western extension

Service routes

  • Qiche GongyuanDongfang Square

Stations

Station name Connections Distance
km
Location
English Chinese
Qiche Gongyuan 汽车公园 Luyuan
Jieda Avenue 捷达大路
West Lake 西湖
Shuangfeng 双丰 2.18 2.18
Changchun West Railway Station 长春西站  CJ ~ JH  Trams in Changchun Trams 55 Changchun West railway station CRT 1.52 3.70
Xinglongpu 兴隆堡 2.09 5.79
West Ring Road 西环城路 1.41 7.20
Heping Street 和平大街 1.14 8.34
Wanfu Street 万福街 Trams in Changchun Trams 54 0.82 9.16
Jingyang Square 景阳广场 0.86 10.02
Jiefang Overpass 解放桥  3  1.07 11.09 Luyuan / Chaoyang
Jianshe Square 建设广场 0.80 11.89 Chaoyang
Wenhua Square 文化广场 0.75 12.64
Jiefang Avenue 解放大路  1  1.36 14.00 Chaoyang / Nanguan
Pingyang Street 平阳街 0.78 14.78 Nanguan
Nanguan 南关 1.12 15.90
Jilin Avenue 吉林大路  4  1.31 17.21 Erdao
Dongsheng Street 东盛大街 0.99 18.20
East Ring Road 东环城路 1.46 19.66
Changqing 长青 1.27 20.93 Erdao / Nanguan
Dongfang Square 东方广场 1.38 22.31 Erdao

    Future Development

    Eastern extension

    An eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length.[4] It's scheduled to open in 2025.

    References

    1. 10月8日8时 长春轨道交通2号线西延线将开通运营. 新浪吉林 (in Chinese). 2021-10-07. Archived from the original on 2021-10-07. Retrieved 2021-11-28. 2号线运营里程增长4.4公里,达到24.9公里
    2. 长春地铁进入换乘时代 2号线8月30日通车. 新华网吉林 (in Chinese). 2018-08-30. Archived from the original on 2019-10-07. Retrieved 2019-10-07.
    3. 长春地铁2号线西延线预计今年年末开通. 中国新闻网 (in Chinese). 2021-04-07. Archived from the original on 2021-08-08. Retrieved 2021-08-08. 线路全长4.36km,共设车站3座,均为地下站
    4. 长春地铁2号线东延工程项目正式开工. Sohu 搜狐 (in Chinese). 2019-11-27. Archived from the original on 2021-02-04. Retrieved 2019-11-27.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.