Shaoxing Metro
Shaoxing Metro (Chinese: 绍兴轨道交通; pinyin: Shàoxīng Guǐdào Jiāotōng), also known as Shaoxing Rail Transit, is the metro system in Shaoxing, Zhejiang province, China.
Shaoxing Metro | |||
---|---|---|---|
Overview | |||
Locale | Shaoxing, Zhejiang Province, China | ||
Transit type | Rapid transit | ||
Number of lines | 2 | ||
Number of stations | 37 | ||
Daily ridership | 20,000 (daily ave. 2021) | ||
Website | www | ||
Operation | |||
Began operation | 28 June 2021[1] | ||
Operator(s) | Shaoxing Rail Transit Group Co., Ltd. | ||
Technical | |||
System length | 57.8 km (35.9 mi) (in operation) | ||
Track gauge | 1,435mm | ||
|
Network
Line | Terminals | Commencement | Newest Extension |
Length km |
Stations | Operator | |
---|---|---|---|---|---|---|---|
1 | Guniangqiao | Fangquan | 28 June 2021 | 29 April 2022 | 47.1 | 28 | Shaoxing Rail Transit Group Co., Ltd. |
2 | Jinghu Hospital | Tandu | 26 July 2023[2] | 10.73[3] | 9 | Shaoxing Rail Transit Group Co., Ltd. | |
Total | 57.8 | 37 |
Line 1
Line 1 began construction in 2016. The section from Guniangqiao to China Textile City opened on 28 June 2021,[1] the remaining section from China Textile City to Fangquan opened on 29 April 2022. A branch line from Huangjiu Town to Convention & Exhibition Center will open in 2024.[4]
The western terminus, Guniangqiao, is also the eastern terminus of Hangzhou Metro Line 5.
Future Development
Route | Name | Termini | Planned Opening | Length | Stations | Status | Notes | |
---|---|---|---|---|---|---|---|---|
1 | Branch | Exhibition And Convention Center | Huangjiu Town | 2024[4] | 7.3 km | 6 | Under construction | [4] |
Planned
The Phase II Construction Plan of Shaoxing Metro, including Line 2 (Phase 2) and Lines 3, 4, 5, is under planning. Line 4 is a southern extension of the Line 1 branch which is currently under construction.[6]
Lines S2 (Shaoxing–Zhuji) and S3 (Shaoxing–Shengzhou–Xinchang) are under planning.[7]
References
- 绍兴正式进入"地铁时代" 两地"一张网"运营创全国先例. 新华网 (in Chinese). 28 June 2021. Archived from the original on 28 June 2021. Retrieved 25 November 2021.
- "重磅官宣!绍兴地铁2号线一期,明日开通". 25 July 2023.
- "开通倒计时!绍兴地铁2号线要来了". 16 February 2023.
- "绍兴地铁1号线主线明日开通". 28 April 2022.
目前,绍兴地铁1号线支线共5座车站中,除绍兴北站站外,其余4座车站土建工程已完工,计划至2024年底支线全线开通
- "开通倒计时!绍兴地铁2号线,真的要来了". 15 February 2023.
- "绍兴市城市轨道交通第二期建设规划环评公众意见征询". 5 January 2022. Archived from the original on 2 May 2022.
4号线一期:将现有1号线支线拆分为4号线,并在此基础上向南延伸
- 绍兴市域铁路S2线(绍兴至诸暨)、绍兴市域铁路S3线(绍兴至嵊州新昌)预可行性研究项目招标公告. 绍兴轨道交通 (in Chinese). 8 June 2020. Archived from the original on 19 July 2020. Retrieved 19 July 2020.