Line 3 (Suzhou Rail Transit)
Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long.[2] The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.
Line 3 | |
---|---|
Overview | |
Status | In operation |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | 37 |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
History | |
Opened | 25 December 2019[1] |
Technical | |
Line length | 45.272 km[2] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 started trial operations from December 6 to December 10, 2019.[3] Official operation started on December 25, 2019.[1]
Stations
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Suzhou Xinqu Railway Station | 苏州新区火车站 | 6 ITH Tram line 2 | 0.00 | 0.00 | Huqiu | |
Huichanglu | 惠昌路 | |||||
Wenchanglu | 文昌路 | Tram line 2 (branch) | ||||
Changting | 长亭 | |||||
Tongdun | 铜墩 | |||||
Mayunlu | 马运路 | |||||
Xijinqiao | 西津桥 | 8 | ||||
Heshan | 何山 | |||||
Shizishan | 狮子山 | 1 Tram line 1 | ||||
Shishanlu | 狮山路 | |||||
Shajinqiao | 沙金桥 | |||||
Suoshanqiao West | 索山桥西 | 5 | ||||
Hengshan | 横山 | |||||
Hengtang | 横塘 | |||||
Shihu North | 石湖北 | |||||
Xinguo | 新郭 | Gusu | ||||
Panlilu | 盘蠡路 | 2 | Wuzhong | |||
Baodailu | 宝带路 | 4 | ||||
Yingchunlu | 迎春路 | |||||
Beiganglu | 北港路 | SIP | ||||
Tongyuanlu South | 通园路南 | 7 | ||||
Shupulu North | 墅浦路北 | |||||
Dongzhenlu | 东振路 | |||||
Jinsheqiao | 金厍桥 | 5 | ||||
Ligongdi West | 李公堤西 | 6 | ||||
Dongfangzhimen | 东方之门 | 1 | ||||
Yanyuqiao | 烟雨桥 | |||||
Nibang | 泥浜 | |||||
Tangzhuang | 唐庄 | 8 | ||||
Kuatang | 跨塘 | |||||
Suzhou Yuanqu Railway Station | 苏州园区火车站 | 8 KAH | ||||
Fangwanjie | 方湾街 | |||||
Fenghelu | 丰和路 | |||||
Shuangmajie | 双马街 | |||||
Fengtingdadao | 葑亭大道 | 5 | ||||
Gexiangjie | 戈巷街 | |||||
Weiting | 唯亭 | 11 | ||||
Map
Gallery
- An image of Exit 6b of Ligongdi West Station, under construction, taken a few weeks before the opening.
- An image of Exit 2 of Ligongdi West Station, under construction, taken a few weeks before the opening.
References
- "苏州轨道交通3号线明日(12月25日)11点30分开通". 2019-12-24.
- "轨交3号线铺轨,预计2019年底试运营". 2018-01-10.
- "轨交3号线试乘首日迎来众多市民"打卡"". 2019-12-07.
此次"万人试乘"活动时间为12月6日至10日,为期5天。每天试乘时限为7:00至19:00
- "地铁S1线拟更名为11号线 预计2023年底与3号线贯通运营".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.