Line 30 (Chengdu Metro)

Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport East[1] to Longquan Railway Station.[2] Phase 1 is 27.74 km long with 24 stations, all underground.[2] Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h.[3] Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao.[3]

Chengdu Metro Line 30
30
Overview
StatusConstruction
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
  • Terminal 2 of Shuangliu International Airport East[1]
  • Longquan Railway Station[2]
Stations24[2]
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Gaobeiba Depot (高碑坝车辆段)
Hongjiaqiao Depot (洪家桥停车场)
History
Planned opening2024
Technical
Line length27.74 km (17.2 mi)[2]
Number of tracks2
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrificationoverhead lines, 1,500 V DC
Operating speed80km/h

History

  • On August 21, 2019, Line 30 is approved officially as part of the fourth phase expansion for the Chengdu Metro by the National Development and Reform Commission, confirming it for 2019–2024's subway construction plan.
  • On March 18, 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.[4]
  • In Dec 2022, Phase 1 finished Financial City North's water/cable/pipe reroute, marking station's main structure construction enters next stage.[6]
  • On Dec 22 2022, Phase 1 finished Jiaozi Flyover's structure construction.[7]
  • On 17 Feb 2023, Phase 1 Terminal 2 of Shuangliu International Airport EastSisheng section's left tunnel is finished, marking the completion of the 18th tunnel.[8]
  • On 31 March 2023, Phase 1 's Gaobeiba Depot (高碑坝车辆段) is powered on.[9]
  • On 11日 September 2023, Phase 1's longest station - Terminal 2 of Shuangliu International Airport East finished structure construction, marking the 23rd station to finish structure contraction.[10]
  • On 22 September 2023, Phase 1 finished tunnel construction.[11]

Stations

Station name Transfer Distance
km
Location
English Chinese
Terminal 2 of Shuangliu International Airport East[1] 双流机场2航站楼东 0.00 0.00 Shuangliu
Sisheng 寺圣 2.09 2.09
Xingyue 星月 0.81 2.90
Guangming 光明 0.92 3.82
Xiejiadu 谢家渡 1.31 4.13
Zhujiang Road 珠江路 8 0.66 5.79
Datong 大同 1.34 7.13
Shiyang East[1] 石羊东 1.99 9.12 High-Tech Zone
Xinyuan Avenue 新园大道 0.87 9.99
Chengdu First People's Hospital 市一医院 5 1.15 11.14
Yizhou Avenue 益州大道 0.84 11.98
Financial City North 金融城北 0.86 12.84
Fuchengqiao 府城桥 0.61 13.44
Jinshi Road 金石路 6 1.25 14.69 Jinjiang
Juanzishu 棬子树 1.59 16.28
Jinyi 锦逸 0.99 17.27
Jiaozi Flyover 娇子立交 1.70 18.97
Haitong Street 海桐街 0.90 19.87
Hangtian Flyover 航天立交 1.01 20.87
Huiwangling 惠王陵 2 1.07 21.94 Longquanyi
Yushi 玉石 1.37 23.31
Fenshui 分水 1.09 24.40
Yuhong Road[1] 玉虹路
Longquan Railway Station 龙泉

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.