Line 4 (Beijing Subway)
Line 4 of the Beijing Subway (Chinese: 北京地铁4号线; pinyin: běijīng dìtiě sìhào xiàn) is a subway line in Beijing's mass transit network. It entered into operation on 28 September 2009,[5] and runs from north to south, parallel and to the west of Line 5, through Haidian, Xicheng, and Fengtai Districts in the western half of the city. It runs from Anheqiao North in the north and ends at Gongyixiqiao in the south, but the 4-Daxing connected line runs all the way to Tiangongyuan in Daxing. All stations are underground except Anheqiao North. It is 28.2 km (17.5 mi)[6] long with 24 stations.[7] Riding on this line starts from a fare of RMB(¥) 3.00 depending on the distance traveled. Line 4's color is teal.
Line 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | M4 (planned name) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Haidian, Xicheng and Fengtai districts Beijing | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 24 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Beijing Subway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Beijing MTR Corporation Limited | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Longbeicun, Majiapu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 6-car Type B (SFM05) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 1,187,000 (2014 Avg. Line 4 only)[1][2] 1,574,000 (2014 Peak Line 4 only)[3] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ridership | 351 million (2012 annual)[4] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 28 September 2009 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 28.165 km (17.501 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Almost all underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC, third rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Line 4 and Daxing line operate as a single line although they are classified as separate lines.[8] Two different services are run during the day: A full service covering both Line 4 and Daxing line and a shorter service that ends at Xin'gong station, the first station of Daxing line. Combined, the Line 4/Daxing Corridor carries an average of 1.24 million passengers every day in 2017,[9] growing to about 1.4 million passengers per day by 2019.[10]
Hours of operation
The first south-bound trains departs from Anheqiao North at 5:00 AM. The first northbound train departs from Gongyixiqiao at 5:10 AM. The last northbound train leaves Anheqiao North at 10:45 PM. The last southbound train leaves Gongyixiqiao at 11:10 PM.[11] Each train completes the entire journey in 48 minutes.
Route
In the north, Line 4 begins in Anheqiao, just beyond the Summer Palace, and heads south past the Old Summer Palace, through the university district and Zhongguancun, Beijing's high-tech silicon village, before turning east at the National Library of China and passing the Beijing Zoo en route to Xizhimen. After entering the 2nd Ring Road at Xizhimen, Line 4 resumes southwards at Xinjiekou and traverses the old city through Xisi, Xidan, Xuanwumen, Caishikou, and Taoranting Park. It passes the city's high-speed rail link at the Beijing South railway station before reaching the terminus at Gongyixiqiao. Construction began in 2004 but delays have pushed back the opening date by two years to 28 September 2009.[12]
Service routes
- Anheqiaobei — Xingong (through service via Daxing line)
- Anheqiaobei — Tiangongyuan (through service via Daxing line)
- Rush hour (7:00-8:00): Zhongguancun — Huangcun Xidajie (through service via Daxing line)[13]
List of Stations
Line 4 and Daxing line stations, from north to south:
Line Name | Service routes |
Station Name | Connections | Nearby Bus Stops | Distance km[14] |
Location | |||||
---|---|---|---|---|---|---|---|---|---|---|---|
English | Chinese | ||||||||||
Line 4 | ● | ● | Anheqiaobei | 安河桥北 | 437 575 专28 | 0.000 | 0.000 | Haidian | |||
● | ● | Beigongmen | 北宫门 | 303 332 346 384 394 563 584 601 观光3 夜8 | 1.363 | 1.363 | |||||
● | ● | Xiyuan | 西苑 | 16 | 129 303 331 332 333 346 384 393 394 432 437 438 476 508 534 563 579 584 601 608 610 636 644 671 686 688 夜8 | 1.251 | 2.614 | ||||
● | ● | Yuanmingyuan Park | 圆明园 | 129 331 424 432 438 508 579 601 664 观光3 | 1.672 | 4.286 | |||||
● | ● | Peking Univ East Gate | 北京大学东门 | 129 305 307 320 331 355 365 375 438 450 549 579 601 614 681 982 观光3 | 1.295 | 5.581 | |||||
● | ● | ● | Zhongguancun | 中关村 | 26 145 302 305 307 320 332 355 365 384 392 400 400快 450 466 549 579 584 601 608 613 614 681 686 982 983 夜8 | 0.887 | 6.468 | ||||
● | ● | ● | Haidian Huangzhuang | 海淀黄庄 | 10 | 145 302 304 305 307 320 332 355 365 386 584 614 630 634 653 671 681 夜8 夜9 | 0.900 | 7.368 | |||
● | ● | ● | Renmin Daxue (Renmin Univ.) | 人民大学 | 26 145 300 300快 302 305 320 323 332 355 361 365 368 425 549 584 614 651 653 658 695 921 夜8 夜30 | 1.063 | 8.431 | ||||
● | ● | ● | Weigongcun | 魏公村 | 26 145 305 320 332 563 603 609 645 651 653 658 695 夜8 | 1.051 | 9.482 | ||||
● | ● | ● | Guojia Tushuguan (National Library) | 国家图书馆 | 9 16 | 86 92 129 305 320 332 481 563 609 653 658 695 夜8 | 1.658 | 11.140 | |||
● | ● | ● | Dongwuyuan (Beijing Zoo) | 动物园 | 7 15 16 19 27 56 65 87 102 103 105 107 111 129 305 332 334 347 360 360快 362 534 563 604 632 695 夜8 | 1.517 | 12.657 | Xicheng | |||
● | ● | ● | Xizhimen | 西直门 | 2 13 Huairou–Miyun VAP |
7 16 21 26 27 44 69 80 87 105 111 145 200 305 332 347 360 362 375 387 438 534 563 604 618 632 651 686 693 694 夜8 夜14 夜20 夜21 专6 专216 | 1.441 | 14.098 | |||
● | ● | ● | Xinjiekou | 新街口 | 7 47 105 111 508 夜36 | 1.025 | 15.123 | ||||
● | ● | ● | Ping'anli | 平安里 | 6 19 | 3 4 7 13 22 38 42 47 88 105 107 111 118 143 409 夜3 夜4 夜10 夜21 夜36 | 1.100 | 16.223 | |||
● | ● | ● | Xisi | 西四 | 3 13 22 38 42 88 101 102 103 105 109 124 143 409 612 夜4 夜10 夜13 | 1.100 | 17.323 | ||||
● | ● | ● | Lingjing Hutong | 灵境胡同 | 22 38 46 68 88 102 105 109 143 夜4 夜10 | 0.869 | 18.192 | ||||
● | ● | ● | Xidan | 西单 | 1 | 1 7 15 22 52 70 83 88 102 105 109 143 夜1 夜4 夜10 | 1.011 | 19.203 | |||
● | ● | ● | Xuanwumen | 宣武门 | 2 | 7 9 15 22 44 67 70 83 102 105 109 137 142 143 144 332 夜4 夜5 夜10 | 0.815 | 20.018 | |||
● | ● | ● | Caishikou | 菜市口 | 7 | 5 6 48 57 70 83 102 105 109 144 381 夜4 夜7 夜10 夜18 专13 | 1.152 | 21.170 | |||
● | ● | ● | Taoranting | 陶然亭 | 40 59 83 133 381 144 414 夜4 夜18 夜23 专13 专155 | 1.200 | 22.370 | ||||
● | ● | ● | Beijing South railway station | 北京南站 | 14 VNP Jingjin |
20 25 102 106 133 200 343 381 414 458 485 529 652 665 夜15 夜17 夜24 专18 专53 专155 | 1.643 | 24.013 | Fengtai | ||
● | ● | ● | Majiapu | 马家堡 | 51 66 72 134 144 485 501 529 954 夜18 专145 | 1.480 | 25.493 | ||||
● | ● | ● | Jiaomenxi | 角门西 | 10 | 30 51 72 144 474 501 529 646 954 夜18 专145 专209 | 0.827 | 26.320 | |||
● | ● | ● | Gongyi Xiqiao | 公益西桥 | 377 400 474 511 556 602 646 685 825 954 990 专145 专209 | 0.989 | 27.309 | ||||
Daxing line | ● | ● | ● | Xingong | 新宫 | 19 | 343 353 354 369 474 556 827 829 946 954 专59 专67 专190 | 2.798 | 30.107 | ||
● | ● | Xihongmen | 西红门 | 381 454 470 474 483 646 829 937 993 兴13 兴14 兴14区 兴53 兴66 兴68 兴71 兴79 专84 专97 专169 | 5.102 | 35.209 | Daxing | ||||
● | ● | Gaomidianbei | 高米店北 | 631 937 兴12 兴34 兴53 兴66 兴82 | 1.810 | 37.019 | |||||
● | ● | Gaomidiannan | 高米店南 | 913 937 兴11 兴42 兴53 兴66 专24 | 1.128 | 38.147 | |||||
● | ● | Zaoyuan | 枣园 | 410 631快 829 937 954 968 兴47 兴66 X101 X102 X104 X105 | 1.096 | 39.243 | |||||
● | ● | Qingyuan Lu | 清源路 | 456 631 631快 829 913 934 954 968 969 兴23 兴24 兴26 兴27 兴28 兴30 兴33 兴35 兴37 兴48 兴53 兴54 兴66 X101 X103 X105 X107 | 1.200 | 40.443 | |||||
● | ● | Huangcun Xidajie | 黄村西大街 | 456 631 631快 829 840 913 934 954 968 兴11 兴14 兴17 兴19 兴20 兴22 兴28 兴29 兴29区 兴31 兴31区 兴33 兴35 兴37 兴45 兴46 兴48 兴52 兴54 兴55 兴57 兴59 兴61 兴66 X105 X107 | 1.214 | 41.657 | |||||
● | Huangcun railway station | 黄村火车站 | HCP | 366 366快 369 631 631快 829 913 957 968 969 兴12 兴13 兴15 兴16 兴18 兴20 兴21 兴22 兴25 兴29 兴29区 兴33 兴37 兴45 兴46 兴55 兴59 兴66 X107 | 0.987 | 42.644 | |||||
● | Yihezhuang | 义和庄 | 456 934 兴13 兴15 兴16 兴37 兴45 兴46 兴48 兴55 兴65 兴66 兴77 兴81 兴82 | 2.035 | 44.679 | ||||||
● | Biomedical Base | 生物医药基地 | 456 827 兴15 兴16 兴21 兴27 兴27快 兴28 兴30 兴39 兴41 兴46 兴48 兴52 兴54 兴55 兴55区 兴61 兴61区 兴64 兴65 兴66 兴68 兴77 兴80 兴81 兴82 X102 | 2.918 | 47.597 | ||||||
● | Tiangongyuan | 天宫院 | 456 827 829 940 兴11 兴21 兴27 兴27快 兴28 兴30 兴39 兴40 兴41 兴44 兴46 兴48 兴54 兴55 兴55区 兴61 兴61区 兴64 兴65 兴66 兴68 兴77 兴80 兴81 X102 X108 X110 | 1.811 | 49.408 | ||||||
Planning and construction
Plans for Line 4 date back to the 1950s when Beijing's first subway line was still under construction. It was planned to run from the Summer Palace, east towards Xizhimen, southeast to Zhongshan Park, terminating at the Beijing Stadium, which near today's Tiantandongmen Station.[15] Ultimately, the section between Summer Palace to Xizhimen was built as planned. However, construction only formally started in 2004.[16]
On 3 December 2004 Hong Kong's MTR Corporation, Beijing Infrastructure Investment Co., Ltd., and Beijing Capital Group Co., Ltd. signed the Beijing Metro Line 4, investment, construction, operation principle of cooperation agreement, making Line 4 the Mainland China's first rail transit line financed using a public-private partnership framework. Subsequently, on 8 November 2005, a joint venture among the 3 companies was established. The Hong Kong MTRC will invest 735 million RMB to the construction of Line 4 and in return have the right to operate Line 4 for 30 years.[17]
On 11 February 2009, the construction of Line 4 is nearing completion with all tunnels bored.[18] On 6 March, four subway trains begin testing while Hong Kong's then Chief Executive, Donald Tsang, visited the project.[19] On 28 September 2009, Line 4 was officially opened for trial operation. Bringing the number of subway lines in Beijing to 9.[20] On 30 December 2010, the Daxing line started trial operation, with direct service into Line 4. Creating a 50 km (31 mi) long line with 35 stations.[21]
In 2008, planners in Haidian District have proposed extending the line to the north by 8 km (5.0 mi) with four additional stations.[22] The planned stations have been identified as Baiwangshan (百旺山), Xibeiwang (西北旺), Aerospace City West (航天城西), and Yongfeng (永丰).[23] However, by June 2010, Line 4's northern extension was cancelled and replaced by the northern extension of Line 16 which opened in 2016.[24]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Anheqiaobei — Gongyi Xiqiao | 28 September 2009 | 28.2 km (17.52 mi)[6] | 24 | (initial phase) |
Gongyi Xiqiao — Tiangongyuan | 30 December 2010 | see Daxing line | (through services) |
Operation
Unlike the other lines of the Beijing Subway, which are completely state-owned and operated, Line 4 was built and is managed by the Beijing MTR Corp. Ltd., a three-way joint-venture among the Hong Kong MTR Corporation, the Beijing Capital Group ("BCG"), and the Beijing Infrastructure Investment Co. ("BIIC").[25] The Hong Kong MTR, which operates the Hong Kong Mass Transit Railway, and the state-owned BCG each holds a 49% stake in the venture and the BIIC has 2%.[25] The JV is responsible for 30% of the investment capital to build Line 4, mainly to finance the purchase of electrical and mechanical equipment, while the Beijing Municipal Government provided the remaining 70%, to cover civil engineering, station, and track work costs.[26]
The Beijing government has also awarded the JV a concession to manage Line 4 for 30 years.[26] The PPP JV model was designed to introduce private capital as well as advanced metro management methods to the growing Beijing Subway.[25] Among the most visible differences in management of Line 4 is a ban on food and beverage consumption inside Line 4 trains and stations.[27]
Rolling Stock
Model | Image | Manufacturer | Year Built | Amount in Service | Fleet Numbers | Depot |
---|---|---|---|---|---|---|
SFM05 | CRRC Qingdao Sifang | 2008, 2010 | 73 | 001–040 061–093 |
Longbeicun Majiapu Nanzhaolu |
Gallery
- Zhongguancun Station Exit B
- Haidianhuangzhuang Station Exit A2
References
- "In the 3 Moon Festival Holidays, Total Patronage is 4.434 Million for BJL4&DXL and 136K for BJL14". mtr.bj.cn. 9 September 2014. Archived from the original on 2 April 2015. Retrieved 6 June 2021.
- 4号线早高峰1分43秒一趟车 (in Chinese). 15 March 2013. Archived from the original on 12 November 2013. Retrieved 15 March 2013.
- 2014年4月30日综合交通总体运行情况. 北京市交通信息中心 北京市交通运行监测调度中心. 1 May 2014. Archived from the original on 2 May 2014. Retrieved 2 May 2014.
- 案例1:北京地铁四号线项目 (in Chinese). 北京市发展与改革委员会. Archived from the original on 22 August 2013.
- 北京地铁4号线9月28日开通 (in Simplified Chinese). Archived from the original on 1 October 2009. Retrieved 28 September 2009. 28 Sept. 2009
- "4号线-大兴线". Retrieved 28 October 2019.
- 地铁四号线通过验收 (in Simplified Chinese). Beijing Evening News. 25 September 2009.
- 北京地铁4号线今年年底将与大兴线贯通运营. news.china.com.cn (in Simplified Chinese). 23 May 2010. Retrieved 4 July 2010.
- 缓解客流压力,北京地铁4号线、大兴线调整运营措施-新华网. Xinhua News. Archived from the original on 28 December 2017. Retrieved 28 December 2017.
- 孙福亮, 马毅林. "纵观北京地铁十年客流变化(2010-2019)". Weixin Official Accounts Platform. Retrieved 24 May 2021.
- "Line 4 timetable" (in Chinese). Beijing Subway. Archived from the original on 31 December 2009.
- 北京地铁4号线确定于明年9月试运营 (in Simplified Chinese). The Beijing News. 28 August 2008.
- "明天起,地铁大兴线工作日早高峰最小行车间隔将缩至2分钟". 7 May 2021.
- "站间公里数 北京地铁官方网站".
- 北京地铁诞生记:周总理称筹建地铁是为备战 (in Chinese). 28 September 2007. Archived from the original on 16 January 2009. Retrieved 3 May 2009.
- 北京地铁4号线5车站开工 残疾人有专用电梯 (in Chinese). 10 August 2004. Retrieved 3 May 2009.
- 七亿港资注入北京地铁4号线 首创公私合营模式 (in Chinese). 8 February 2005. Retrieved 3 May 2009.
- 北京地铁4号线今日全线贯通 9月开始运营 (in Chinese). 10 February 2009. Retrieved 3 May 2009.
- 北京地铁4号线全线实现电通 装修进展顺利 主打地域特色 (in Chinese). Retrieved 27 November 2009.
- 北京地铁4号线开通试运营 下午3时起载客运营 (in Chinese). 28 September 2009. Retrieved 28 September 2009.
- 大兴线12月30日两点开门迎客 (in Chinese). Beijing MTR. 30 December 2010. Archived from the original on 9 January 2011. Retrieved 14 January 2011.
- 北京地铁明年有望通香山 西长安街沿线道路扩宽_CCTV.com_中国中央电视台. CCTV News. Retrieved 16 June 2018.
- chinanews. 北京地铁4号线拟向北延长8公里 增设四座车站. www.chinanews.com. Retrieved 16 June 2018.
- 北京地铁16号线城西贯通南北 (in Simplified Chinese). 法制晚报. 29 June 2010. Archived from the original on 7 July 2011. Retrieved 8 May 2013. 2010-06-29
- "Hong Kong MTR Corp wins 30-year operation of new Beijing metro line" People's Daily 15 Apr. 2006
- "Beijing Metro Line 4" Hong Kong MTR Corporate Site Accessed on 6 Jan. 2009
- Chen Si; Yan Xinhong (1 June 2009). 北京地铁4号线禁吃零食喝饮料 站厅能隔毒气 (in Simplified Chinese). 法制晚报.
External links
- Beijing MTR Corp. Ltd official site