List of tallest buildings in North Carolina
This list of tallest buildings in North Carolina ranks skyscrapers in the U.S. state of North Carolina by height. The tallest building in North Carolina is the Bank of America Corporate Center in Charlotte, which contains 60 floors and is 871 ft (265 m) tall. The second-tallest building in the state is the Duke Energy Center also in Charlotte, North Carolina, which rises 786 feet (240 m) above the ground.
Tallest buildings
This list ranks North Carolina skyscrapers that stand at least 200 feet (60.96 m) tall, based on standard height measurement. This includes spires and architectural details but does not include antenna masts or other objects not part of the original plans. Existing structures are included for ranking purposes based on present height.
Rank | Name | Image | Height ft / m |
Floors | Year | City | Notes |
---|---|---|---|---|---|---|---|
1 | Bank of America Corporate Center | 871 / 265[1] | 60 | 1992 | Charlotte | 56th-tallest in the United States and the tallest between Philadelphia and Atlanta; tallest building in Charlotte and North Carolina since 1992[2] | |
2 | 550 South Tryon | 786 / 240[3] | 54 | 2010 | Charlotte | 479th-tallest in the world; 62nd-tallest in the United States; 2nd-tallest in North Carolina. Tallest building constructed in Charlotte in the 2010s.[4][5] It is the largest building in Charlotte by leasable square feet.[6] | |
3 | Truist Center | 659 / 201[7] | 47 | 2002 | Charlotte | Tallest building constructed in Charlotte in the 2000s.[8][9] It is the fourth largest building in Charlotte by leasable square feet.[6] | |
4 | Bank of America Tower | 632 / 193[10] | 33[10] | 2019 | Charlotte | It is the seventh largest building in Charlotte by leasable square feet.[6] | |
5 | Duke Energy Plaza | 629 / 191.7<[11] | 40 | 2023 | Charlotte | Will be leased by Duke Energy. Construction started in May 2019. It will become the new headquarters for Duke.[12] The building topped out on August 20, 2021.[13][14] | |
6 | One Wells Fargo Center | 588 / 179[15] | 42 | 1988 | Charlotte | Tallest building constructed in Charlotte in the 1980s.[16][15] It is the third largest building in Charlotte by leasable square feet.[6] | |
7 | The Vue | 576 / 175.5[17] | 51 | 2010 | Charlotte | 6th Tallest building in Charlotte and the tallest residential high rise in North Carolina[18] | |
8 | PNC Plaza | 538 / 164[19] | 32 | 2008 | Raleigh | Previously known as RBC Plaza; was the U.S. headquarters of RBC Bank | |
9 | One South at The Plaza | 503 / 153[20] | 40 | 1974 | Charlotte | [21][22][23] It is the ninth largest building in Charlotte by leasable square feet.[6] | |
10 | 1 Bank of America Center | 484 / 148)[24] | 32 | 2010 | Charlotte | 9th-tallest in North Carolina.[24][25][26] With 746,152 square feet of leasable space, it is the 9th largest office building in Charlotte.[27] The building opened in June 2010. Bank of America owns the building and occupies 95% of it.[28] Bank employees started occupying the building in July 2010.[29] | |
11 | 300 South Tryon[lower-alpha 1] | 463 141[30] | 25 | 2017 | Charlotte | Anchored by Barings[30][31][32] | |
12 | 121 West Trade | 462 / 141[33] | 32 | 1990 | Charlotte | Also known as the Interstate Tower[34][35] | |
13 | 100 North Main Street | 460 / 140[36] | 34 | 1995 | Winston-Salem | Tallest building in Winston-Salem since 1995, as well as the tallest in North Carolina outside of Charlotte and Raleigh The building contains 549,000 square feet (51,000 m2) of space. It was 95% leased as February 2012, tenants at that time included Wells Fargo, Deutsche Bank Securities, Morgan Stanley Smith Barney and Wake Forest Baptist Medical Center.[37] In October 2018 WFC Property LLC of Oklahoma City purchased the building for $62 million.[38] | |
14 | Three Wells Fargo Center | 450 / 137[39] | 32 | 2000 | Charlotte | Originally known as Three First Union Center[40][41] It is the fifth largest building in Charlotte by leasable square feet.[6] | |
15 | Fifth Third Center | 447 / 136.3)[42] | 30 | 1997 | Charlotte | Also known as the IJL Financial Center and 201 North Tryon[43][44] | |
Museum Tower | 447 / 136.3[45] | 42 | 2017 | Charlotte | 43-story apartment tower developed by Childress Klein, built atop of the Mint Museum | ||
17 | Two Wells Fargo Center | 433 / 132[46] | 32 | 1971 | Charlotte | Originally known as Two First Union Center[47][48] It is the eighth largest building in Charlotte by leasable square feet.[6] | |
18 | Two Hannover Square | 431 / 131[49] | 29 | 1991 | Raleigh | Commonly referred to as the "BB&T Building"[50] | |
19 | Ally Charlotte Center | 427 / 115.2[51] | 26 | 2021 | Charlotte | Construction started in December 2016. Delivered on May 3, 2021.[52][53][54][55] It is the tenth largest building in Charlotte by leasable square feet.[6] | |
20 | Ascent Uptown | 426 / 129.8[56] | 33 | 2017 | Charlotte | 32-story apartment tower developed and owned by Greystar Real Estate Partners | |
21 | Avenue | 425 / 130[57] | 36 | 2007 | Charlotte | [58][59] | |
22 | 400 South Tryon | 420 / 128[60] | 32 | 1974 | Charlotte | Also known as Duke Energy Plaza. Originally known as Wachovia Corporate Center and First Union Corporate Center.[61][62][63] | |
23 | Winston Tower | 410 / 125[64] | 29 | 1966 | Winston-Salem | Tallest building in Winston-Salem from 1966 to 1995 | |
24 | Wells Fargo Capitol Center | 400 / 121.9[65] | 30 | 1990 | Raleigh | ||
25 | Carillon Tower | 394 / 120[66] | 24 | 1991 | Charlotte | ||
26 | Charlotte Plaza | 388 / 119[67] | 28 | 1982 | Charlotte | [68] | |
27 | The Ellis | 384 / 117[69] | 33 | 2021 | Charlotte | 549 apartment units with 19,000 square feet of retail. Completed June 2021.[70] It is one of the tallest residential towers in Charlotte.[71] | |
FNB Tower Charlotte | 384 / 117[72] | 30 | 2021 | Charlotte | FNB Corporation anchored building will include 156,000 square feet of office space, 196 luxury apartments, and 2,300 square feet of retail. Ground broke in December 2018.[73] The building opened on July 21, 2021.[74] | ||
29 | Lincoln Financial Building | 374 / 114[75] | 20 | 1990 | Greensboro | Tallest building in Greensboro | |
30 | Lowe's Global Technology Center | 357 / 108.814[76] | 23 | 2021 | Charlotte | Being constructed across from the Design Center of the Carolinas, will be anchored by Lowe's. Construction started August 2019.[77] It is the tallest building in Charlotte outside of Uptown.[78] | |
31 | University Tower | 356 / 108.5[79] | 17 | 1986 | Durham | Tallest building in Durham | |
32 | The Eastern | 354 / 108 [80] | 36 | 2022 | Raleigh | Also named “Walter Tower” after Sir Walter Raleigh | |
33 | Catalyst | 338 / 103[81] | 27 | 2009 | Charlotte | ||
34 | GMAC Tower | 330 / 100.6[82] | 21 | 1980 | Winston-Salem | ||
35 | 525 North Tryon | 330 / 100.6[83] | 19 | 1999 | Charlotte | ||
36 | Wells Fargo Tower | 328.50 / 100 | 21[84] | 1989 | Greensboro | The building sits on one acre, it contains 324,405 square feet (30,138.2 m2) of space. The building houses the corporate headquarters for The Fresh Market and Bell Partners. It was sold in December 2021 for $30.4 million to Argentic.[84] | |
37 | TradeMark | 325 / 99.1 )[85] | 28 | 2007 | Charlotte | ||
38 | First Citizens Plaza | 320 / 97.5 [86] | 23 | 1987 | Charlotte | [87][88] | |
AC Hotel/Residence Inn Charlotte EpiCentre | 320 (97.5)[89] | 23 | 1987 | Charlotte | |||
40 | SkyHouse Uptown North Tower | 318 / 96.9 [90] | 24 | 2015 | Charlotte | [91] | |
SkyHouse Uptown South Tower | 318 / 96.9 [92] | 24 | 2017 | Charlotte | [93] | ||
42 | F.N.B. Tower | 316 / 88 | 32 | 2008 | Raleigh | [94] Regional headquarters of First National Bank. Includes 239 apartments. Formerly known as Charter Square North. | |
43 | Reynolds Building | 314 / 95.7[95] | 22 | 1929 | Winston-Salem | Tallest building in Winston-Salem from 1929 to 1966. | |
44 | The Arlington | 310 / 94.5[96] | 24 | 2002 | Charlotte | ||
Skye | 310 / 94.[97] | 23 | 2013 | Charlotte | [98][99] | ||
46 | Honeywell Tower | 305 / 93.05[100] | 23 | 2021 | Charlotte | Construction starting September 2019. The third building as part of the Legacy Union development.[101] | |
JW Marriott Charlotte | 305 (93.05)[102] | 22 | 2021 | Charlotte | Construction started in December 2018. Part of the Ally Charlotte Center. Once completed it will be the 7th largest hotel in Charlotte by number of rooms with 381 rooms.[103] The hotel opened August 17, 2021.[104] | ||
48 | One Independence Center | 301 / 91.8[105] | 22 | 1983 | Charlotte | [106][107] | |
49 | 200 South College | 300 / 91.4[108] | 22 | 1974 | Charlotte | [109][110] | |
One City Center | 300 / 91.44[111] | 27 | 2018 | Durham | Mixed use residential. | ||
51 | 200 South Tryon | 299 / 91.1[112] | 18 | 1961 | Charlotte | Tallest building constructed in Charlotte in the 1960s.[113][114][115] | |
52 | The Westin Charlotte | 293 / 89.3[116] | 25 | 2003 | Charlotte | Largest hotel in Charlotte by number of rooms[103] | |
NASCAR Plaza | 293 / 89.3[117] | 20 | 2009 | Charlotte | [118][119][120] | ||
54 | The Hilton Charlotte Center City[lower-alpha 2] | 292 / 89[121] | 22 | 1990 | Charlotte | The 5th largest hotel in Charlotte by number of rooms.[103][122][123] | |
Uptown 550 | 293 / 89[124] | 21 | 2019 | Charlotte | 21 story apartment tower that along with a 6-story building contains 421 apartments. It was developed and owned by Northwood Ravin. The building broke ground in December 2016 and was completed in October 2019. The project cost was $82.151 million, and it sits on a 3.76-acre site in Uptown Charlotte.[125] | ||
Novel Stonewall Station | 293 / 89[126] | 19 | 2018 | Charlotte | $150 million mixed used development by Crescent Communities and CNM Enterprises in Uptown Charlotte. It contains 459 apartments, a 38,000 square feet (3,530 m2) Whole Foods, Home2 Suites by Hilton hotel, and 23,000 square feet (2,137 m2) of additional retail space. Retail tenants include Starbucks, Fifth Third Bank, and a high-end nail salon.[127] | ||
57 | 650 S Tryon | 291 / 88.6[128] | 18 | 2020 | Charlotte | Second office tower planned on the Legacy Union development site. Construction completed mid November 2020.[129] | |
58 | 112 Tryon Plaza | 280 / 85.3[130] | 22 | 1927 | Charlotte | Tallest building constructed in Charlotte in the 1920s.[131][132][133] | |
59 | Element Uptown[lower-alpha 2] | 278 / 84.9[134] | 22 | 2014 | Charlotte | 22-story 352-unit apartment tower across the street from Romare Bearden Park, developed by Childress Klein. It was sold to Bell Partners in June 2022 for $165 million.[135][136] | |
60 | One Progress Plaza | 277 / 84[137] | 21 | 1977 | Raleigh | [137] | |
61 | Durham Centre | 273 / 83[138] | 18 | 1987 | Durham | 3rd tallest building in Durham | |
62 | BB&T Financial Center | 271 / 83.2[139] | 21 | 1987 | Winston-Salem | Former BB&T Headquarters | |
63 | Sheraton Greensboro Hotel at Four Seasons | 270 / 82[140] | 28 | 1991 | Greensboro | Tallest hotel in Greensboro | |
64 | Harrah's Cherokee Casino & Hotel | 267 / 81[141] | 22 | 2012 | Cherokee | Tallest building outside of any major metro area | |
65 | 301 Hillsborough | 263 / 80 | 19 | 2022 | Raleigh | Phase 1 of the Raleigh Crossing development. Headquarters of Pendo. | |
66 | Regions 615[lower-alpha 2] | 260 / 79.1[142] | 19 | 2017 | Charlotte | ||
Captrust Tower | 260 / 79.1[143] | 17 | 2009 | Raleigh | |||
Bank of America Tower | 260 / 79.1[144] | 18 | 2016 | Raleigh | |||
69 | Advance Auto Parts Tower | 257 / 78 | 20 | 2020 | Raleigh | ||
70 | Wake County Justice Center | 256 / 78[145] | 11 | 2013 | Raleigh | ||
Renaissance Plaza | 256 / 78[145] | 19 | 1989 | Greensboro | |||
72 | Charlotte Marriott City Center | 252 / 76.8[146] | 19 | 1984 | Charlotte | The Charlotte Marriott City Center was built as a part of the $120 million 101 Independence Center and hotel project developed by Henry Faison. The hotel sits on the land of the former White House Inn. Faison purchased the Marriott site in 1982 when the hotel was already vacant[147][148] The Marriott is currently the second largest hotel in Charlotte by number of rooms with 446 rooms.[103][149] | |
The Tower at Mutual Plaza | 252 / 76.8[150] | 20 | 1965 | Durham | Headquarters of N.C Mutual Life Insurance. Tallest building in Durham from 1965 to 1986. | ||
74 | Nissen Building | 246 / 75[151] | 20 | 1927 | Winston-Salem | Tallest building in Winston-Salem from 1927 to 1929. | |
75 | Red Hat Tower | 251 / 77[152] | 20 | 1927 | Raleigh | [152] Previously the headquarters of Progress Energy; is now the headquarters of Red Hat. | |
76 | The Dillon | 250 / 76[152] | 20 | 1927 | Raleigh | [153] Tallest building in the Warehouse District. | |
77 | Holiday Inn Raleigh Downtown | 239 / 73[154] | 20 | 1969 | Raleigh | [154] Tallest Hotel in Raleigh. Tallest building in Raleigh from 1969 to 1977. To be demolished & replaced in 2023. | |
78 | Le Méridien Charlotte[lower-alpha 2] | 238 / 72.5[155] | 18 | 1973 | Charlotte | The hotel was previously part of the Blake Hotel, which had 605 rooms. In early 2015 the former hotel completed a $20 million renovation to become The Sheraton with 305 room and Le Méridien with 300. Le Méridien is the 11th largest hotel in Charlotte.[156][157][158][159][160] | |
Kimpton Tryon Park[lower-alpha 2] | 238 / 72.5[161] | 18 | 2017 | Charlotte | It has 217 rooms and is ranked as the 25th largest hotel in Charlotte.[156][162][163][164] | ||
Sonesta Charlotte Executive Park | 238 / 72.5[165] | 18 | 1983 | Charlotte | The hotel is owned by Hospitality Properties Trust, purchased in 2017 for $44 million. It has 300 rooms and is ranked as the 11th largest hotel in Charlotte.[166][156] In 2014 a $10 million renovation was finished.[167] The renovation included upgrades to guestrooms, public areas, meeting space, the hotel restaurant, and bar.[168] | ||
81 | Marriott Winston Plaza Hotel | 237 / 72.2[169] | 19 | 1984 | Winston-Salem | Tallest full-service hotel in Winston-Salem | |
82 | Jefferson Standard Building | 233 / 71[170] | 18 | 1923 | Greensboro | Tallest building in Greensboro from 1923 to 1989 | |
Center Pointe | 233 / 71[171] | 16 | 1966 | Greensboro | |||
84 | The Arras | 228 / 69.4[172] | 19 | 1965 | Asheville | ||
85 | 129 West Trade | 227 / 76.8[173] | 17 | 1958 | Charlotte | Tallest building constructed in Charlotte in the 1950s.[173] | |
86 | Ritz-Carlton Charlotte | 225 / 69.1[174] | 17 | 2009 | Charlotte | 150 room hotel built by Bank of America for $500 million combined cost for 1 Bank of America Center and the hotel. The bank has an agreement with the hotel to cover their losses in order to keep the hotel open.[175][176] Also, bank employees will receive discounted rates.[177] | |
Johnston Building | 225 / 69.1[161] | 17 | 1924 | Charlotte | |||
88 | Buncombe County Courthouse | 217 / 66.1[178] | 16 | 1928 | Asheville | ||
89 | Charter Square | 215 / 66 [179] | 11 | 2015 | Raleigh | [179] Platinum LEED certified. | |
Wake County Public Safety Center | 215 / 66[180] | 17 | 1991 | Raleigh | |||
One Bank of America Plaza | 215 / 66[181] | 17 | 1985 | Raleigh | [181] Also known as One Bank of America Square and One Bank of America Plaza | ||
Sheraton Capital Center | 215 / 66[182] | 17 | 2008 | Raleigh | |||
93 | 440 South Church | 212 / 64.7[183] | 16 | 2009 | Charlotte | ||
Towerview at Ballantyne | 212 / 64.7[184] | 16 | 2021 | Charlotte | Announced in October 2019 by Northwood Ravin as Ballantyne Corporate Park's first apartment tower. The 16-story building with an attached low-rise building have 212 apartments. The apartments ranged in size from one bedroom to three-bedroom units with the smallest apartments having 650 square feet (60 m2) and the largest units with 3,800 square feet (350 m2). It delivered in the spring of 2021. The building was part of the early stages of Ballantyne Reimagined.[185] | ||
The Line | 212 / 64.7[186] | 16 | 2022 | Charlotte | A 16-story building developed by Portman[187] on a 2.2 acre lot next to the current location of Scycamore Brewing.[188] The brewery will move next store to be its anchor tentant.[189] Foundry Commercial will be the first tenant of the building starting on May 16, 2022.[190] | ||
Park Central | 212 / 64.7 | 16[191] | 2017 | Raleigh | Apartment building in North Hills with 286 apartments across 252,204 square feet (23,430.5 m2) including 36,400 square feet (3,380 m2) of ground floor retail. Completed in September 2017.[191] | ||
97 | One West Fourth | 211 / 64.3[192] | 13 | 2002 | Winston-Salem | Tallest building constructed in Winston-Salem in the 2000s | |
98 | Duke Chapel | 210 / 64[193] | 1935 | Durham | Tallest building in Durham from 1935 to 1937. | ||
99 | Marriott City Center | 203 / 62[194] | 17 | 1937 | Raleigh | ||
100 | Hill Building | 202 / 61.6[195] | 17 | 1937 | Durham | 21c Hotel. Tallest building in Durham from 1937 to 1965. A window was broken after a man was pushed off the top floor. | |
101 | RJR Plaza Building | 201 / 69 | 12 | 1929 | Winston-Salem | ||
Reynolds Tower – WFUBMC | 201 / 69 | 16 | 1972 | Winston-Salem | |||
103 | Capitol Towers North | 200 / 60.9[196] | 10 | 2017 | Charlotte | Developed by Charlotte-based Lincoln Harris, located in South Park on a 6 acres (2.4 ha) site behind Piedmont Town Center. Each building contains 240,000 square feet (22,000 m2) of office space. The towers were built as speculative buildings, with no tenants signed on prior to construction.[197][198] | |
Capitol Towers South | 200 / 60.9[199] | 10 | 2015 | Charlotte | Developed by Charlotte-based Lincoln Harris, located in South Park on a 6 acres (2.4 ha) site behind Piedmont Town Center. Each building contains 240,000 square feet (22,000 m2) of office space. The towers were built as speculative buildings, with no tenants signed on prior to construction.[197][198] | ||
Quorum Center | 200 / 60.9[200] | 15 | 2007 | Raleigh | [200] Building received damage from the Metropolitan apartment complex fire on March 16, 2017.[201] |
Tallest under construction
This lists buildings that are under construction in North Carolina and are planned to rise at least 200 ft (61 m). Buildings that have already been topped out are also included. As of October 2023, there are 20 such buildings under construction.
Name | Image | Height ft (m) |
Floors | Year | City | Notes |
---|---|---|---|---|---|---|
Queensbridge Collective Residential Tower | 596 (181.6) | 45 | 2025 | Charlotte | Originally the project was planned to have two residential towers. However, due to a higher water table than expected only one residential tower will be built. The tower will be 45 stories and include 400 apartments.[202][203] It broke ground on May 24, 2023.[204] | |
Radius Dilworth | 345 / 105.1[205] | 26 | 2024 | Charlotte | Two apartment towers at the corner of Morehead Street and Euclid Avenue with a combined total of 626 units with 6,000 square feet (560 m2) of ground level retail.[206] The two parcels that make up the lot were purchased by Spandrel Development in December 2020 for $17.8 million.[207] Construction will begin in the fourth quarter of 2021.[206] The project broke ground in May 2022. The total project cost will be $235 million. The 26 story tower, Overlook, will deliver in the fourth quarter of 2024. The 8 story building, Enclave, will deliver in the first quarter of 2024.[208] | |
The Bowl at Ballantyne Apartment Tower | 345 / 105.1 | 26[209] | 2025[210] | Charlotte | A 26-story apartment tower that will have 350 units located in Ballantyne Corporate Park, it will be built in the first phase of Ballantyne Reimagined. The entire project will cost $1 billion and include 400,000 square feet (37,000 m2) of office space, 300,000 square feet (28,000 m2) of commercial non office space, 2,000 apartments, 300 townhomes, and 200 hotel rooms.[209][211] | |
Ascent South End | 318 / 96.9[212] | 24 | 2024 | Charlotte | 24 story residential tower with 324 apartments and 15,000 square feet (1,400 m2) of ground floor retail. It will be developed by White Point Partners and Greystar. Located at the corner of South Blvd and Kingston in South End. Construction will start in December 2021 and finish in January 2024[213][214] | |
2161 Hawkins | 318 / 96.9[215] | 24[216] | 2024 | Charlotte | Apartment tower with 370 units along with 18,700 square feet (1,740 m2) of ground-floor retail and restaurant space. It is planned next to the current The Line construction site where Sycamore Brewing is currently. Construction began in October after Sycamore had their moving party October 7 – 8 2022[217] and will complete in the third quarter of 2024.[218] | |
600 South Tryon | 318 / 96.9[219] | 24 | 2024 | Charlotte | The fourth office tower as part of the phase four of the Legacy Union project. The tower will be anchored by Robinson Bradshaw. Construction started in April 2022.[220] | |
Brooklyn Village Phase 1 Office Tower 1 | 318 / 96.9 | 24[221] | 2026 | Charlotte | 24-story office tower being built as a part of the Brooklyn village development phase 1. This is 1 of 2 office towers totaling 531,600 square feet (49,390 m2). It will be built upon a 5.75-acre lot currently occupied by Bob Walton Plaza at 700 E. Brooklyn Village Ave, which will be made up of 6 parcels.[221]The land sold in July 2023 for $10.3 milllion. In September 2023 the demolition of Bob Walton Plaza began and construction will complete in late 2026.[222][223] | |
110 East | 305 / 92.9[224] | 23 | 2024 | Charlotte | 370,000 square feet (34,000 m2) office tower with 6,000 square feet (560 m2) square of street level retail at the intersection of South Boulevard and East/West Boulevard. Construction started in January 2022.[225][226] | |
The Howard R. Levine Center for Education | 270 / 82.2[227] | 18 | 2024 | Charlotte | The Wake Forest University School of Medicine main education tower. It will be 18 stories, 270 feet tall, with 300,000 square feet (27,871 m2). The building was named after Howard Levine after he gave the project a $25 million donation. It will be built as part of phase one of The Pearl medical innovation district.[227][228] | |
Mint & Morehead | 226 / 68.8[229] | 17 | 2023 | Charlotte | A 17-story apartment building developed by Aspen Heights Partners located at the corner of Mint St and Morehead St in South End. It will have 393 units. The 1.4 acre lot was purchased in April 2022 for $16.3 million. Ground breaking occurred shortly after the land sale was complete. Construction will complete in the fall of 2023.[230] | |
Brooklyn Village Phase 1 Office Tower 2 | 212 / 65 | 16[221] | 2026 | Charlotte | 16-story office tower being built as a part of the Brooklyn village development phase 1. This is the second of 2 office towers totaling 531,600 square feet (49,390 m2). It will be built upon a 5.75-acre lot currently occupied by Bob Walton Plaza at 700 E. Brooklyn Village Ave, which will be made up of 6 parcels.[221] The land sold in July 2023 for $10.3 milllion. In September 2023 the demolition of Bob Walton Plaza began and construction will complete in late 2026.[222][223] | |
400H | 256 / 72.273 [231] | 20 | Fall 2023 | Raleigh | 144,000 SF office space, 16,000 SF retail, and 242 apartments[232][233] | |
The Tower at Cardinal North Hills | 239 / 73 | 18 | Spring 2023 | Raleigh | A 18-story senior living tower with 192 units that is located on a 2.8-acre site.[234] | |
North Hills Tower V | 238 / 72.5 | 18 | Spring 2024 | Raleigh | An 18-story office tower with 322,232 square feet (29,936.3 m2) located in the North Hills Innovation District.[235][236] | |
Union West (Tower 1) | 380 / 116 | 32 | 2026 | Raleigh | 1 of 2 towers planned for GoTriangle's Raleigh Union Station Bus Facility Project. To house the primary bus station for the development.[237] | |
Union West (Tower 2) | 221 / 67.3 | 18 | 2026 | Raleigh | 1 of 2 towers planned for GoTriangle's Raleigh Union Station Bus Facility Project.[237] | |
320 South St. | 213 / 64.9 | 20 | 2024 | Raleigh | A development on a 1.32-acre site spanning parcels 320 South St and 328 W South St. which will include 296 apartments and 10,000 square feet (930 m2) of retail space. It is located in downtown cater-cornered Red Hat Amphitheater along W. Lenior Street. The land was purchased in April 2020 for $4.2 million[238] | |
Salisbury Square Mixed-Use Tower | 265 / 80.772 | 20 | 2024 | Raleigh | It is a tower that has 175,000 square feet (16,300 m2) of office and retail space topped with 242 apartments. Dogwood State Bank will have their headquarters in the building. The tower is a part of the 4.9-acre Salisbury Square in downtown located at the corner of W. South and S. Salisbury streets, specially at 700 S. Salisbury St. The land was purchased for $35.5 in March 2022 by Dominion Realty Partners and New York Life Real Estate Investors. It broke ground in the May 2022.[238][239] | |
Salisbury Square Residential Tower | 265 / 80.772 | 20 | 2024 | Raleigh | It is a residential tower with 270 apartments. The tower is a part of the 4.9-acre Salisbury Square in downtown located at the corner of W. South and S. Salisbury streets, specially at 700 S. Salisbury St. The land was purchased for $35.5 in March 2022 by Dominion Realty Partners and New York Life Real Estate Investors. It broke ground in the May 2022.[238][239] | |
Carroll South of the Ballpark | 265 / 80.7 | 20[240] | Greensboro | An office building containing 200,000 square feet (19,000 m2), including 150 Aloft hotel, 280 apartments, and 30,000 square feet (2,800 m2) of retail. The project will cost $140 million. It broke ground in December 2020.[240][241] | ||
Novus | 300 / 91.4 | 27 | 2024 | Durham | A residential building containing 54 condos, 188 apartments, and ground floor retail.[242] | |
Durham Center II | 335 / 102.1[243] | 25[243] | Durham | Mixed-Use. Will incorporate 312 residential units and 11,343 sq ft of retail space.[243][244] |
Proposed and approved
This lists buildings that are proposed, approved, or on hold in North Carolina that are planned to rise at least 200 ft (61 m).
Name | Height* ft / m |
Floors | Year | Status | Primary Purpose | City | Notes |
---|---|---|---|---|---|---|---|
Queensbridge Collective Office Tower | 557 / 169.7[245] | 42 | 2025 | Approved | Office | Charlotte | Office tower with 750,000 square feet (70,000 m2) to be developed by Riverside Investment & Development, planned on the 3 acre site of the Uptown Cabaret and Midnight Diner at 1111 S. Tryon Street. The entire project will include 2,000 parking spaces.[246] Both the office building and residential tower will break ground in December 2022.[247] |
1728 South Boulevard | 265 / 79.2 | 20 | 2025 | Approved | Office | Charlotte | Office Tower that will be a joint venture between White Point Partners, MRP Realty and Barings with 400,000 square feet (37,000 m2) of office space, ground floor retail, and a rooftop terrace. The building will be near Ascent South End. It will be built on the lot that Walgreen currently occupies and the store will be built on the ground floor once complete. Construction will begin in 2023.[248] |
Southern Land Co. Residential Tower | 336 / 102.4 | 30 | 2025 | Approved | Residential | Charlotte | Apartment tower with 300 units to be developed by Southern Land Co., planned on the site of Tyber Creek Pub. It will break ground in early 2023 and finish by 2025. Tyber Creek will occupy 6,700 square of the building with outdoor and indoor areas.[249] |
VeLa Uptown | 368 / 112.1 | 32[250] | 2025 | Approved | Residential | Charlotte | 379 luxury apartments are being developed at 200 E. Seventh St., former site of the Levine Museum of the New South. The .7 acre site at the corner of East Seventh and North College was purchased on March 13, 2022, for $10.75 million. It will also include 4,000 square feet (370 m2) of retail and 20,000 square feet (1,900 m2) of resident amenity space. The project cost is $170 million. Construction will begin in the first half of 2023 and complete in the fourth quarter of 2025.[250] |
Camden Exchange | 398 / 121.3 | 30 | 2024 | Approved | Residential | Charlotte | Apartment tower with 315 units, 10,000 square feet (930 m2) of ground floor retail, and 10,000 square feet (930 m2) of office space occupied by Catalyst. It is being developed by Catalyst Capital Partners and Stiles Corp. It is planned on the former site of Price's Chicken Coop located at 1600 and 1604 Camden Road. It will break ground in October 2022.[251][252] |
Carson & Tryon | 411 / 125.2[253] | 31[254] | 2025 | Approved | Mixed Use | Charlotte | 31 story mixed use tower with 565,000 square feet (52,500 m2) of office space, 200 room hotel, 10,000 square feet (930 m2) of retail, and 200 residential units.[255][254][256] The 3-acre site is currently occupied by an Enterprise Rent-A-Car location at the corner of Carson and Tryon at 1102 S Tryon St. The developers Crescent Communities and Nuveen Real Estate paid $37 million for the four parcels from different owners that make up the site.[257][258] Construction will start in late 2022 and complete in 2025.[254] The building will also contain 30,000 square feet (2,800 m2) of employee amenities which will include an 18,000 square feet (1,700 m2) sky terrace that have outdoor meeting space and a casual lounge. The second part of the employee amenities space will be a 12,000 square feet (1,100 m2) indoor lounge which will include a fitness center, locker rooms, wellness programming, and on-site conference and boardroom spaces.[255] |
2915 Griffith | 265 / 79.2 | 20 | 2024 | Approved | Office | Charlotte | 325,000 square feet (30,200 m2) building on a 1.7 acre lot located directly next to Suffolk Punch and the Lynx Blue Line's New Bern Station in South End, construction will start in the second quarter of 2022 and finish in 2024.[259][260] |
526 S. Church St | 345 / 105.1 | 26[261] | Approved | Mixed Use | Charlotte | Former Duke Energy headquarters that sits on a 3.86-acre lot. MRP Realty purchased the building in May 2022. The plan is to add 50,000 square feet (4,600 m2) of retail space, 550 apartments, and 100,000 square feet (9,300 m2) of office space. The apartments will be built in a 14-story addition sitting on top of the existing building.[262][263] | |
Phillips Place Office Tower | 250 / 76.2[264] | 10 | Approved | Mixed Use | Charlotte | Mixed used building with 250,000 square feet of office space and 20,000 square feet of ground retail that will be developed by Lincoln Harris. It will be built on the 3.65 acre site that the Regal Phillips Place currently occupies.[265] The movie theater's lease runs until the end of 2025. Therefore, construction of the new tower will not begin until after the theater's lease expires.[266][267] If built it will be the tallest building in South Park.[268] The Regal Phillips Place closed on October 16, 2022. However, Lincoln Harris has not released any information about how this will affect the timeline for the start of construction.[269] | |
205 E Bland St | 265 / 80.7 | 20[270] | 2026 | Approved | Mixed Use | Charlotte | Cousins Properties is planning a 200,000 square feet (19,000 m2) office building on a .9 acre parking lot. The building will also include ground-floor retail and onsite parking.[270] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lot 1401 S. Tryon St. and 200 E. Bland St.[270][271] |
1427 South Blvd | 411 / 125.2 | 31[272] | 2026 | Approved | Multifamily | Charlotte | Washington, D.C. developer Akridge and Virginia-based property management company Kettler are developing a 31-story 450 unit apartment building on a .9 acre lot. The building will also include ground level retail, a resort style pool, fitness center, and co-working space. The companies purchased the lot on December 20, 2022 for $13.5 million. It is currently occupied by businesses Modern Man, Savvy Seconds Consignment, Fresh Nails, Lucky Fish and Destined To Make It.[272] |
South End Station Building 1 | 212 / 76.5 | 16 | Approved | Mixed Use | Charlotte | Cousins Properties is planning a two building 700,000 square feet (65,000 m2) mixed use complex at 200 E Bland; where All American Pub, Hot Taco and Slate are currently located. The complex will include multifamily, retail and office space.[271][273] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lots 1401 S. Tryon St. and 205 E. Bland St.[270][271] | |
South End Station Building 2 | 212 / 76.5 | 16 | Approved | Mixed Use | Charlotte | Cousins Properties is planning a two building 700,000 square feet (65,000 m2) mixed use complex at 200 E Bland; where All American Pub, Hot Taco and Slate are currently located. The complex will include multifamily, retail and office space.[271][273] The lot was purchased in November 2020 as part of a larger $28.1 million deal that also gave Cousins nearby parking lots 1401 S. Tryon St. and 205 E. Bland St.[270][271] | |
Tremont Alley Office Building | 251 / 76.5 | 19 | Approved | Office | Charlotte | Cousins is building a 350,000 square feet (33,000 m2) office tower on West Tremont across from the Common Market. The building will also contain 18,000 square feet (1,700 m2) of ground floor retail. It will occupy a 2.4 acre lot that was purchased in 2021 for $18.7 million. The lot is currently vacant, the previous industrial building have been demolished.[274] | |
Tremont Alley Apartment Building | 251 / 76.5 | 19 | Approved | Multifamily | Charlotte | Cousins is building a 305 unit residential tower on West Tremont across from the Common Market. The building will also contain 18,000 square feet (1,700 m2) of ground floor retail.It will occupy a 2.4 acre lot that was purchased in 2021 for $18.7 million. The lot is currently vacant, the previous industrial building have been demolished.[274] | |
Intercontinental Hotel at Belk Place | 451 / 137.4 | 34[275] | 2026 | Approved | Hotel | Charlotte | 244 room luxury hotel,[275] construction started in February 2018, on hold due to the COVID-19 pandemic's effect on the Charlotte hotel business[276] Will become the tallest hotel in the Southern United States outside of Atlanta upon completion.[277][278] The hotel developer, Salter Brothers, announced in June 2023 the project is back on track. Construction will start in summer 2024 and complete in mid-2026.[275] |
506 Capital Blvd | 40 | Approved | Office/Residential | Raleigh | [279] | ||
Smoky Hollow Phase III | 500 / 150 | 40 | Approved | Office/Residential | Raleigh | [280] | |
The Nash (Tower 1) | 40 | Approved | Mixed-Use | Raleigh | Multi-use building planned for downtown Raleigh located near Nash Square.[281] | ||
The Nash (Tower 2) | 40 | Approved | Mixed-Use | Raleigh | Multi-use building planned for downtown Raleigh located near Nash Square.[281] | ||
Raleigh Convention Hotel and Downtown Development Project (Tower 1) | 530 / 161.5 | 40 | 2026 | Approved | Hospitality | Raleigh | Planned to be constructed near Raleigh's convention center and performing arts center. Expected to have at least 500 rooms. Originally expected to be completed in 2028, the project completion deadline can be moved to 2026 if desired.[282] |
Raleigh Convention Hotel and Downtown Development Project (Tower 2) | 530 / 161.5 | 40 | 2026 | Approved | Office/Mixed-Use | Raleigh | Planned to be constructed near Raleigh's convention center and performing arts center. Originally expected to be completed in 2028, the project completion deadline can be moved to 2026 if desired.[282] |
Downtown South (Tower 1) | 40 | Approved | Office | Raleigh | Part of Kane Realty's Downtown South Soccer Stadium project.[283] | ||
Downtown South (Tower 2) | 40 | Approved | Hospitality | Raleigh | Part of Kane Realty's Downtown South Soccer Stadium project.[283] | ||
110 South McDowell Street | 20 | 2025 | Approved | Mixed-Use | Raleigh | To begin construction in 2023.[284] | |
1727 S Saunders St. | 292 / 89 | 24 | 2025 | Approved | Residential | Raleigh | Approximately 14,000 feet of retail. To begin construction in early 2023.[285] |
Downtown South (Office) | 27 | 2025 | Approved | Office | Raleigh | To begin construction in early 2023.[285] | |
Holiday Inn Redevelopment | 231 / 70 | 21 | 2025 | Approved | Mixed-Use | Raleigh | To begin construction in early 2023. Will replace Raleigh's infamous circular-shaped Holiday Inn. To become a Kimpton Hotel, and Raleigh's first ever Boutique hotel.[286] |
316 Edenton St. | 40 | Approved | Mixed-Use | Raleigh | [287] | ||
Vela LongView | 336 / 102 | 30 | 2025 | Approved | Mixed-Use | Raleigh | Will have 524,568 Sq Ft for residential units and retail spaces. To begin construction in mid-2023.[288] |
327 W. Morgan St. | 40 | Approved | Mixed-Use | Raleigh | [289] | ||
401 Hillsborough St. | 40 | Approved | Mixed-Use | Raleigh | [289] | ||
330 W Hargett St. | 362 / 110.3 | 30 | Approved | Mixed-Use | Raleigh | Will have 372 residential units, up 247,000 square feet of office and up to 12,000 square feet of retail space.[290] | |
Highline Glenwood | 432 / 131.6 | 36 | Approved | Mixed-Use | Raleigh | Initially planned to rise to 32 stories, but modified in 2022. Expected to Include 299 residential units and will start construction in 2024. [291] | |
404 Glenwood | 295 / 89.9 | 21 | Approved | Mixed-Use | Raleigh | Initially planned to rise to 20 stories, but modified in 2022. Primarily office space, expected to start in 2024.[291] | |
521 S Wilmington St. | 245 / 74.7 | 20 | Approved | Mixed-Use | Raleigh | [292] | |
Nash Square Apartments | 429 / 130.8 | 36 | Approved | Mixed-Use | Raleigh | Primarily residential. Would become Raleigh’s tallest residential building. [293] | |
4006 Market at North Hills St. (Phase 1) | 266 / 81 | 23 | Approved | Residential | Raleigh | Will include 354 units, 542 parking spaces, and roughly 5,600 square feet of retail.[294] | |
4006 Market at North Hills St. (Phase 2) | 317 / 81 | 40 | Approved | Residential | Raleigh | Will include 258 units, 319 parking spaces, and roughly 4,400 square feet of retail.[294] | |
Park City Residences (Tower 1) | 237 / 72.2 | 20 | 2025 | Approved | Residential | Raleigh | [295] |
Park City Residences (Tower 2) | 237 / 72.2 | 20 | 2025 | Approved | Residential | Raleigh | [295] |
333 S Dawson St. | 40 | Approved | Mixed-Use | Raleigh | [296] | ||
227 W. Davie St. | 40 | Approved | Mixed-Use | Raleigh | To be developed by NCR Hospitality Corporation.[297] | ||
Nexus Phase 1 | 15 | Proposed | Office/Residential | Raleigh | [298] | ||
Raleigh Civic Campus Phase 1 | 20 | Proposed | Government | Raleigh | Phase 1 of 3. Referred to as "New City Hall, East Building" in City of Raleigh materials.[299][300] | ||
Raleigh Civic Campus Phase 2 | 20 | Proposed | Government | Raleigh | Phase 2 of 3. Referred to as "New City Hall, West Building" in City of Raleigh materials. Master plan refers to this building as a "twin" to phase 1.[300] | ||
Raleigh Civic Campus Phase 3 | 20 | Proposed | Government | Raleigh | Phase 3 of 3. Third-party development of up to 20 stories with parking deck.[300] | ||
301 Hillsborough Phase 2 | 19 | Proposed | Office/Residential | Raleigh | Phase 2 of the Raleigh Crossing development. Mixed-use tower with 135 residential units, 165 room hotel, and 8,000 SF of retail.[301] | ||
320 W Cabarrus St. | 20 | Proposed | Office | Raleigh | Would replace Raleigh's famous Videri Chocolate Factory.[302] | ||
327 W Davie St. | 20 | Proposed | Residential | Raleigh | Would replace Raleigh's famous Videri Chocolate Factory.[302] | ||
North Hills Redevelopment (Tower 2) | Proposed | Raleigh | One of multiple towers planned for North Hills.[303] | ||||
North Hills Redevelopment (Tower 3) | Proposed | Raleigh | One of multiple towers planned for North Hills.[303] | ||||
North Hills Redevelopment (Tower 4) | Proposed | Raleigh | One of multiple towers planned for North Hills.[303] | ||||
Lassiter at North Hills | 40 | Proposed | Residential | Raleigh | [304] | ||
118 E South St. | 30 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
121 E South St. | 30 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
125 E South St. | 30 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
130 MLK Jr Blvd. | 30 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
600 S Blount St. | 30 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
212 E South St. | 40 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
213 E South St. | 40 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
214/218 E South St. | 40 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
219 E South St. | 40 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
226 E South St. | 40 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
757 S Blount St. | 40 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
760 S Blount St. | 40 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
800 S Wilmington St. | 40 | 2030 | Proposed | Mixed-Use | Raleigh | Part of the Shaw U Development.[305] | |
Downtown Durham YMCA | TBA | 27 | Proposed | Mixed-Use | Durham | Will include a multi-story YMCA and roughly 300 residential units.[306] | |
113 W Davie St | 40 | Proposed | TBD | Raleigh | [307] | ||
Bloc83 Tower 3 | 259 / 79 | 18 | Approved | Mixed-Use | Raleigh | [308] |
See also
Notes
- Height estimated by the CTBUH.
- Height estimated by Emporis.
References
- "Bank of America Corporate Center". The Skyscraper Center. CTBUH. Retrieved July 13, 2017.
- "Bank of America Corporate Center". Emporis. Archived from the original on April 3, 2015. Retrieved 16 April 2015.
- "Duke Energy Center". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- "Duke Energy Center". Emporis. Archived from the original on April 8, 2015. Retrieved July 14, 2017.
- "Duke Energy Center". Skyscraper Source Media. Retrieved July 14, 2017.
- Shapiro, Amy (9 October 2020). "Charlotte's largest office buildings Ranked by Leasable square feet". Charlotte Business Journal. Retrieved 30 May 2021.
- "Hearst Tower". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- "Hearst Tower". Skyscraper Source Media. Retrieved July 14, 2017.
- "Hearst Tower". Emporis. Archived from the original on April 8, 2015. Retrieved July 14, 2017.
- "Bank of America Tower". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "Charlotte Metro Tower". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- Ashley, Fahey (17 May 2021). "Duke Energy to exit current HQ building in uptown after company's new tower delivers". Charlotte Business Journal. Retrieved 16 November 2022.
- Downey, John (2 May 2022). "Duke Energy building sales to bring apartments, hotel and shops to uptown sites". Charlotte Business Journal. Retrieved 3 May 2022.
- Wilson, Jen (20 August 2021). "CBJ Morning Buzz: Duke Energy's uptown tower tops out; Charlotte makes jobs ranking". Charlotte Business Journal. Retrieved 25 August 2021.
- "One Wells Fargo Center". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- "One Wells Fargo Center". Emporis. Archived from the original on April 8, 2015. Retrieved July 14, 2017.
- "The Vue". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "The Vue, Charlotte". Emporis. Archived from the original on April 8, 2015. Retrieved 17 April 2015.
- "PNC Plaza". Council on Tall Buildings and Urban Habitat. Retrieved 17 October 2023.
- "Bank of America Plaza". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "1 Bank of America Center". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- "1 Bank of America Center". Emporis. Archived from the original on April 16, 2015. Retrieved July 14, 2017.
- "1 Bank of America Center". Skyscraper Source Media. Retrieved July 14, 2017.
- "1 Bank of America Center". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "1 Bank of America Center". Emporis. Archived from the original on April 16, 2015. Retrieved July 14, 2017.
- "1 Bank of America Center". Skyscraper Source Media. Retrieved July 14, 2017.
- Sharpiro, Amy (8 October 2022). "Charlotte's largest office buildings". Charlotte Business Journal. Retrieved 9 October 2021.
- Boye, Will (31 May 2010). "BofA grabs bigger piece of tower". Charlotte Business Journal. Retrieved 7 November 2022.
- O'Daniel, Adam; Boye, Will (28 May 2010). "A sneak peek inside BofA's new tower". Charlotte Business Journal. Retrieved 7 November 2022.
- "300 S Tryon". Council on Tall Buildings and Urban Habitat. Retrieved September 24, 2021.
- "300 South Tryon". Emporis. Archived from the original on December 1, 2017. Retrieved November 20, 2017.
- "300 South Tryon". Skyscraper Source Media. Retrieved November 20, 2017.
- "121 West Trade". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "121 West Trade". Emporis.com. Archived from the original on February 21, 2007. Retrieved 2007-12-27.
- "Interstate Tower". SkyscraperPage.com. Retrieved 2007-12-31.
- "100 North Main Street". Council on Tall Buildings and Urban Habitat. Retrieved 17 October 2023.
- Covington, Owen (23 February 2012). "For sale: Wells Fargo Center in downtown Winston-Salem". Triad Business Journal. Retrieved 28 November 2022.
- Craver, Richard (October 16, 2018). "Wells Fargo Center downtown sells for $62 million to Oklahoma developer". Winston-Salem Journal.
- "Three Wells Fargo Center". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "Three Wachovia Center". Emporis.com. Archived from the original on February 11, 2007. Retrieved 2007-12-27.
- "Three Wachovia Center". SkyscraperPage.com. Retrieved 2007-12-31.
- "Fifth Third Center". Council on Tall Buildings and Urban Habitat. Retrieved 29 November 2022.
- "201 North Tryon". Emporis.com. Archived from the original on February 16, 2007. Retrieved 2007-12-27.
- "IJL Financial Center". SkyscraperPage.com. Retrieved 2007-12-31.
- "Mint Museum Apartments Tower". Skyscraper Source Media. Retrieved November 29, 2022.
- "Two Wells Fargo Center". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "Two Wachovia Center". Emporis.com. Archived from the original on February 20, 2007. Retrieved 2007-12-27.
- "Two Wachovia Center". SkyscraperPage.com. Retrieved 2007-12-31.
- "Two Hanover Square". Council on Tall Buildings and Urban Habitat. Retrieved 17 October 2023.
- "Two Hanover Square". Emporis. Archived from the original on April 17, 2015. Retrieved 17 April 2015.
- Fahey, Ashley (10 July 2019). "Uptown office tower tops out, on track to deliver in 2021". Charlotte Business Journal. Retrieved 7 October 2021.
- Chemtob, Danielle (May 3, 2021). "Construction on the latest bank tower in the Charlotte skyline is now complete". Charlotte Observer. Retrieved 2021-05-05.
- "Uptown will be getting a new bank tower — Ally Charlotte Center". Agenda. Charlotte Agenda. 21 September 2017. Retrieved December 12, 2017.
- "Busy uptown intersection is closing for December to make way for a new office tower". Charlotte Observer. Ely Portillio. Retrieved December 12, 2017.
- "Uptown office tower tops out, on track to deliver in 2021". Charlotte Business Journal. bizjournals. Retrieved February 23, 2020.
- "Ascent Uptown". Emporis. Archived from the original on October 10, 2017. Retrieved October 7, 2021.
- "Avenue". Emporis. Archived from the original on May 13, 2015. Retrieved September 24, 2021.
- "Avenue". Emporis.com. Archived from the original on February 20, 2007. Retrieved 2007-12-27.
- "Avenue". SkyscraperPage.com. Retrieved 2007-12-31.
- "400 South Tryon". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "400 South Tryon". Emporis.com. Archived from the original on October 20, 2012. Retrieved 2007-12-27.
- "400 South Tryon". SkyscraperPage.com. Retrieved 2007-12-31.
- "400 South Tryon". SkyscraperCity.com. Archived from the original on 2006-05-16. Retrieved 2007-03-29.
- "Winston Tower". Council on Tall Buildings and Urban Habitat. Retrieved October 18, 2023.
- "Wells Fargo Capitol Center". Council on Tall Buildings and Urban Habitat. Retrieved October 18, 2023.
- "Carillon Tower". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "Charlotte Plaza". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "Charlotte Plaza". Emporis.com. Archived from the original on February 12, 2007. Retrieved 2007-12-27.
- "The Ellis". Council on Tall Buildings and Urban Habitat. Retrieved October 18, 2023.
- Sealey, Clayton (23 June 2021). "Charlotte's newest residential tower is complete, with hundreds of ready-to-lease units". Charlotte Observer. Retrieved 24 June 2021.
- "Hoar Construction Completes 33-Story Ellis Apartment High-Rise in Uptown Charlotte". ReBusiness Online. 2021-06-28. Retrieved 2021-06-28.
- "FNB Tower-Charlotte". Emporis. Archived from the original on July 21, 2021. Retrieved July 21, 2021.
- Cope, Cassie (26 December 2018). "Construction begins on 29-story uptown bank tower. It will have more than offices". Charlotte Observer. Retrieved 11 June 2021.
- Kuznitz, Allison (21 July 2021). "The newest addition to the Charlotte skyline just opened near Bank of America Stadium". Charlotte Observer. Retrieved 22 July 2021.
- "Lincoln Financial Building". Council on Tall Buildings and Urban Habitat. Retrieved October 18, 2023.
- "Design Center Tower". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- Crane, Brianna (27 June 2019). "View Renderings: Lowe's choose South End for new tech hub, moving into stunning 23-story tower". Charlotte Axios. Retrieved 19 March 2021.
- Soloff, Katie Peralta (7 October 2021). "6 biggest developments underway shaping South End". Axios Charlotte. Retrieved 7 October 2021.
- "University Tower". Council on Tall Buildings and Urban Habitat. Retrieved October 18, 2023.
- https://amp.newsobserver.com/news/business/real-estate-news/article261116307.html
- "Catalyst". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "500 West Fifth Street". Council on Tall Buildings and Urban Habitat. Retrieved October 18, 2023.
- "525 North Tryon". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "Wells Fargo Tower". Skyscraper Source Media. Retrieved 18 October 2023.
- "333 West Trade Street". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "First Citizens Plaza". Council on Tall Buildings and Urban Habitat. Retrieved 28 November 2022.
- "First Citizens Plaza". Emporis. Archived from the original on May 8, 2016. Retrieved July 15, 2017.
- "First Citizens Building". Skyscraper Source Media. Retrieved July 15, 2017.
- "AC Hotel/Residence Inn Charlotte City Center". Emporis. Archived from the original on September 24, 2021. Retrieved September 24, 2021.
- "SkyHouse Uptown I". Emporis. Archived from the original on October 7, 2021. Retrieved October 7, 2021.
- "SkyHouse Uptown North Tower". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
- "SkyHouse Uptown II". Emporis. Archived from the original on October 7, 2021. Retrieved October 7, 2021.
- "SkyHouse Uptown South Tower". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
- "First National Bank Tower officially joins Fayetteville Street and Raleigh's skyline". News & Oberver. 2019-12-05. Retrieved 2019-12-19.
- "Reynolds Building". Council on Tall Buildings and Urban Habitat. Retrieved October 18, 2023.
- "The Arlington". Council on Tall Buildings and Urban Habitat. Retrieved 1 December 2022.
- "Skye Building". Council on Tall Buildings and Urban Habitat. Retrieved 21 December 2022.
- "SKYE Condominiums". Emporis. Archived from the original on August 3, 2020. Retrieved August 4, 2017.
- "SKYE Condominiums". Skyscraper Source Media. Retrieved July 15, 2017.
- "Honeywell Tower". Emporis. Archived from the original on July 21, 2021. Retrieved July 21, 2021.
- Ashley, Fahey (5 June 2019). "Honeywell HQ to anchor latest office tower at Legacy Union in uptown". Charlotte Business Journal. Retrieved 16 November 2022.
- "JW Marriott Charlotte". Emporis. Archived from the original on September 24, 2021. Retrieved September 24, 2021.
- Shapiro, Amy (8 January 2021). "Charlotte's largest hotels Ranked by No. of units or suites". Charlotte Business Journal. Retrieved 30 May 2021.
- Thomas, Jennifer (26 July 2021). "Luxury hotel JW Marriott set to open in uptown Charlotte". Charlotte Business Journal. Retrieved 27 July 2021.
- "101 Independence Center". Council on Tall Buildings and Urban Habitat. Retrieved 29 November 2022.
- "101 Independence Center". Emporis. Archived from the original on March 14, 2016. Retrieved July 15, 2017.
- "101 Independence Center". Skyscraper Source Media. Retrieved July 15, 2017.
- "BB&T Center". Council on Tall Buildings and Urban Habitat. Retrieved 29 November 2022.
- "BB&T Center". Emporis. Archived from the original on August 3, 2020. Retrieved July 15, 2017.
- "BB&T Building". Skyscraper Source Media. Retrieved July 15, 2017.
- "One City Center". Emporis. Archived from the original on August 5, 2019. Retrieved January 13, 2022.
- "200 South Tryon". Emporis. Archived from the original on March 13, 2016. Retrieved September 24, 2021.
- "200 South Tryon Street". The Skyscraper Center. CTBUH. Retrieved July 15, 2017.
- "200 South Tryon". Emporis. Archived from the original on March 13, 2016. Retrieved July 15, 2017.
- "200 South Tryon". Skyscraper Source Media. Retrieved July 15, 2017.
- "The Westin Charlotte". Emporis. Archived from the original on October 17, 2015. Retrieved September 24, 2021.
- "NASCAR Plaza". Emporis. Archived from the original on May 14, 2015. Retrieved September 24, 2021.
- "NASCAR Plaza". The Skyscraper Center. CTBUH. Retrieved July 15, 2017.
- "NASCAR Plaza". Emporis. Archived from the original on May 14, 2015. Retrieved July 15, 2017.
- "NASCAR Plaza". Skyscraper Source Media. Retrieved July 15, 2017.
- "Hilton Charlotte Center City". Emporis. Archived from the original on June 30, 2021. Retrieved October 7, 2021.
- "Hilton Charlotte & Towers". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.
- "The Hilton Charlotte Center City". Skyscraper Source Media. Retrieved July 16, 2017.
- "Uptown 550 on Stonewall". Emporis. Archived from the original on October 7, 2021. Retrieved October 7, 2021.
- "Finalist: Apartment or Condominium Development". Charlotte Business Journal. Retrieved 16 October 2022.
- "Novel Stonewall Station". Emporis. Archived from the original on October 7, 2021. Retrieved October 7, 2021.
- Thomas, Jennifer (25 October 2019). "Novel project put Stonewall in play — with more to come". Charlotte Business Journal. Retrieved 16 October 2022.
- "Two Legacy Union". Council on Tall Buildings and Urban Habitat. Retrieved September 24, 2021.
- Fahey, Ashley (10 December 2020). "Developers, contractors get creative on Covid-19 challenges for construction". Charlotte Business Journal. Retrieved 27 May 2021.
- "112 Tryon Plaza". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.
- "112 Tryon Plaza". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
- "112 Tryon Plaza". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.
- "112 Tryon Plaza". Skyscraper Source Media. Retrieved July 16, 2017.
- "Element Uptown". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.
- Huguley, Collin (29 June 2022). "Uptown Charlotte apartment complex fetches $165M in recent sale". Charlotte Business Journal. Retrieved 16 October 2022.
- "Element Uptown". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.
- "One Progress Plaza". Emporis.com. Archived from the original on October 26, 2012. Retrieved 2013-01-05.
- "Durham Centre, Durham | 127806 | EMPORIS". Archived from the original on April 9, 2016.
- "BB&T Financial Center – The Skyscraper Center". www.skyscrapercenter.com. Retrieved 2022-07-19.
- "Sheraton Greensboro Hotel at Four Seasons". Emporis. Archived from the original on June 4, 2019. Retrieved January 13, 2022.
- "Harrah's Cherokee Casino & Hotel-Creek Tower". Emporis. Archived from the original on April 20, 2022. Retrieved April 19, 2022.
- "615 South College". Council on Tall Buildings and Urban Habitat. Retrieved October 7, 2021.
- "Captrust Tower". Emporis.com. Archived from the original on March 13, 2014. Retrieved 2013-01-05.
- "North Hills Tower Two". Archived from the original on September 24, 2015.
- "Renaissance Plaza". Emporis. Archived from the original on June 4, 2019. Retrieved January 13, 2022.
- "Charlotte Marriott City Center". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.
- "Working in The Round", The Charlotte Observer, March 3, 1982.
- M.S. Van Hecke, "Developer Delays Plans For Old Hotel", The Charlotte Observer, April 12, 1982.
- "Charlotte Marriott City Center". Emporis. Archived from the original on July 17, 2018. Retrieved July 16, 2017.
- "The Tower at Mutual Plaza". Emporis. Archived from the original on January 13, 2022. Retrieved January 13, 2022.
- "Nissen Building – The Skyscraper Center". www.skyscrapercenter.com. Retrieved 2022-07-19.
- "Two Progress Plaza". Emporis.com. Archived from the original on October 26, 2012. Retrieved 2013-01-05.
- http://gsa.raleighnc.gov/
- "Clarion Hotel State Capital". Emporis.com. Archived from the original on April 9, 2013. Retrieved 2013-01-05.
- "Le Meridien Charlotte". Emporis. Archived from the original on October 20, 2017. Retrieved October 7, 2021.
- Sharpiro, Amy (8 October 2022). "Charlotte's largest hotels". Charlotte Business Journal. Retrieved 7 January 2022.
- Thomas, Jennifer (10 November 2022). "Behind the scenes of Le Méridien's multimillion-dollar transformation (PHOTOS)". Charlotte Business Journal. Retrieved 5 January 2015.
- Boye, Will (10 November 2022). "Charlotte's Blake Hotel to undergo $20M renovation, conversion". Charlotte Business Journal. Retrieved 17 July 2013.
- "Le Méridien Charlotte". Emporis. Archived from the original on October 20, 2017. Retrieved July 17, 2017.
- "The Blake Hotel". Skyscraper Source Media. Retrieved July 14, 2017.
- "Kimpton Tryon Park". Emporis. Archived from the original on July 17, 2018. Retrieved September 24, 2021.
- "Klimpton Hotel". The Skyscraper Center. CTBUH. Retrieved November 20, 2017.
- "Kimpton Tryon Park". Emporis. Archived from the original on August 10, 2017. Retrieved November 20, 2017.
- Portillo, Ely (June 13, 2017). "Charlotte's newest luxury hotel opens soon, with a new name". The Charlotte Observer. Retrieved November 20, 2017.
- "Crowne Plaza Executive Park". Emporis. Archived from the original on February 27, 2021. Retrieved May 5, 2022.
- Fahey, Ashley (September 20, 2017). "Crowne Plaza Charlotte sells for $44M". Charlotte Business Journal. Retrieved May 5, 2022.
- Thomas, Jennifer (November 11, 2014). "Here's a look at Crowne Plaza Charlotte's $10M renovation (PHOTOS)". Charlotte Business Journal.
- "Hospitality Properties Trust Purchases 300-Room Hotel in Charlotte for $44M". Rebusiness Online. September 21, 2014.
- "Marriott Winston Plaza Hotel – The Skyscraper Center". www.skyscrapercenter.com. Retrieved 2022-07-19.
- "Jefferson Standard Building". Emporis. Archived from the original on February 15, 2016. Retrieved January 13, 2022.
- "Center Pointe". Emporis. Archived from the original on February 15, 2016. Retrieved January 13, 2022.
- "The Arras". Emporis. Archived from the original on October 31, 2020. Retrieved January 4, 2018.
- "129 West Trade". Emporis. Archived from the original on May 14, 2015. Retrieved February 23, 2022.
- "The Ritz Carloton Charlotte". Emporis. Archived from the original on May 14, 2015. Retrieved February 23, 2022.
- Rothacker, Rick (June 1, 2010). "Reflections of Grandeur". The Charlotte Observer.
- Rothacker, Rick (June 21, 2007). "Ritz deal leaves hotel bill to BofA". The Charlotte Observer.
- Rothacker, Rick (June 22, 2007). "BofA to pay hotel bill". The Charlotte Observer.
- "Buncombe County Courthouse". Emporis. Archived from the original on June 22, 2021. Retrieved January 4, 2018.
- "Charter Square". Chartersquare.com. Archived from the original on February 7, 2015. Retrieved 2015-02-06.
- "Wake County Public Safety Center". Emporis.com. Archived from the original on April 9, 2013. Retrieved 2013-01-05.
- "One Bank of America Plaza". Emporis.com. Archived from the original on October 26, 2012. Retrieved 2013-01-05.
- "Sheraton Capital Center". Emporis.com. Archived from the original on February 15, 2013. Retrieved 2013-01-05.
- "Ally Center Charlotte". Emporis. Archived from the original on July 17, 2018. Retrieved February 23, 2022.
- "Towerview at Ballantyne". Emporis. Archived from the original on November 21, 2021. Retrieved February 23, 2022.
- Fahey, Ashley (1 October 2019). "FIRST LOOK: Northwood Ravin's first Ballantyne Corporate Park apartments to include 16-story tower". Charlotte Business Journal. Retrieved 15 October 2022.
- "The Line". Emporis. Archived from the original on July 20, 2021. Retrieved March 9, 2022.
- "Guide: The Growing Skyline in Charlotte's South End". Charlotte Magazine. 26 November 2019. Retrieved February 23, 2020.
- PORTILLO, Ely (6 March 2018). "Creative office building near prominent South End brewery goes on sale". Charlotte Observer. Retrieved 8 December 2020.
- Peralta, Katie (3 December 2020). "The 16-story South End tower that'll house Sycamore Brewing has a new name: The Line". Charlotte Agenda. Retrieved 8 December 2020.
- Franco, Elise (22 April 2022). "Foundry Commercial relocating its Charlotte office from uptown to new South End tower". Charlotte Business Journal. Retrieved 26 April 2022.
- Hoyle, Amanda (10 February 2016). "Kane brings on JV partner for $100M Park Central at North Hills". Triangle Business Journal. Retrieved 23 November 2022.
- "One West Fourth Street – The Skyscraper Center". www.skyscrapercenter.com. Retrieved 2022-07-19.
- "Duke Chapel". Emporis. Archived from the original on February 3, 2016. Retrieved January 13, 2022.
- "Marriott City Center". Emporis.com. Archived from the original on February 20, 2013. Retrieved 2013-01-05.
- "Hill Building". Council of Tall Building and Urban Habitats. Retrieved January 13, 2022.
- "Capitol Towers North". Emporis. Archived from the original on December 15, 2021. Retrieved May 5, 2022.
- Boye, Will (December 19, 2014). "Lincoln Harris expects Capitol Towers building to deliver in July". Charlotte Business Journal.
- Eric Frazier, "Construction starts on SouthPark office towers", The Charlotte Observer, May 30, 2014.
- "Capitol Towers South". Emporis. Archived from the original on December 15, 2021. Retrieved May 5, 2022.
- "Quorum Center". Emporis.com. Archived from the original on March 13, 2014. Retrieved 2013-01-05.
- WTVD (2017-03-17). "Monstrous fire destroys apartment building in downtown Raleigh". ABC11 Raleigh-Durham. Retrieved 2020-09-07.
- Huguley, Colin (10 March 2022). "RENDERINGS: Developer reveals new details about massive project on edge of uptown and South End". Charlotte Business Journal. Retrieved 13 September 2022.
- Peralta Soloff, Katie (21 December 2022). "The most anticipated Charlotte developments set to break ground in 2023". Axios Charlotte. Retrieved 21 December 2022.
- Franco, Elise (25 May 2023). "Riverside's Queensbridge Collective to be 'another jewel' in Charlotte's crown (PHOTOS)". Charlotte Business Journal. Retrieved 25 May 2023.
- "Radius Dilworth". Emporis. Archived from the original on May 17, 2022. Retrieved April 25, 2022.
- "26-story tower with skyline views breaks ground soon in Dilworth". Axios Charlotte. Axios Charlotte. Retrieved September 24, 2021.
- "A 26-story apartment tower is planned near Dilworth. Here's what it will include". Charlotte Business Journal. bizjournals. Retrieved May 18, 2021.
- Franco, Elise (17 May 2022). "Spandrel Development breaks ground on $235M Radius Dilworth project with apartments, retail". Charlotte Business Journal. Retrieved 18 May 2022.
- Rago, Gordon (18 May 2022). "See renderings of the Bowl at Ballantyne, a 20-acre project bringing a 'main street' feel". Charlotte Observer. Retrieved 19 May 2022.
- "Construction Timeline". Ballantyne Reimagined. Retrieved 7 August 2023.
- Huguley, Collin (17 May 2022). "RENDERINGS: Northwood Investors gives new peek at OMB-anchored The Bowl at Ballantyne". Charlotte Business Journal. Retrieved 7 August 2023.
- "1714 South Boulevard". Emporis. Archived from the original on October 7, 2021. Retrieved October 7, 2021.
- Huguley, Collin (29 June 2021). "White Point Partners, Greystar reveal new details on high-rise project in South End". Charlotte Business Journal. Retrieved 29 June 2021.
- "Greystar, White Point Break Ground on Ascent South End". Cision PR Wire. 3 March 2022. Retrieved 9 March 2022.
- "2161 Hawkins Street". Emporis. Archived from the original on May 11, 2022. Retrieved May 11, 2022.
- Fahey, Ashley (18 May 2021). "Portman Residential planning high-rise apartment tower at South End site near the Rail Trail". Charlotte Business Journal. Retrieved 18 May 2021.
- Greene, Shannon (28 September 2022). "Sycamore Brewing's moving party postponed ahead of Hurricane Ian". Charlotte Observer. Retrieved 20 October 2022.
- Franco, Elise (8 September 2022). "Portman to start construction next month on South End apartment tower". Charlotte Business Journal. Retrieved 8 September 2022.
- "600 South Tryon". Emporis. Archived from the original on July 13, 2022. Retrieved July 13, 2022.
- "New uptown office tower signs law firm as first tenant". 10 May 2022.
- Franco, Elise (12 October 2022). "Brooklyn Village mixed-use project is on track to break ground in early 2023". Charlotte Business Journal. Retrieved 19 October 2022.
- Franco, Elise (31 July 2023). "BK Partners to start construction on Brooklyn Village redevelopment this fall". Charlotte Business Journal. Retrieved 1 August 2023.
- Bergeron, Josh (6 September 2023). "Brooklyn Village project will demolish first-of-its-kind Black-developed building". Charlotte Observer. Retrieved 6 September 2023.
- "110 East". Emporis. Archived from the original on May 28, 2022. Retrieved April 26, 2022.
- O'Connell, Liz (27 January 2022). "PHOTOS: South End's latest office development breaks ground off East Boulevard". Charlotte Business Journal. Retrieved 25 November 2022.
- "RENDERINGS: Here's what South End's next office tower will look like". Charlotte Business Journal. Retrieved March 3, 2020.
- Hudson, Caroline; O'Connell, Liz (24 August 2021). "Atrium Health, development firm outline plans for future innovation district at med school site". Charlotte Business Journal. Retrieved 16 October 2022.
- Wilson, Jen (14 December 2021). "Howard Levine Foundation donates $25M to support Atrium's innovation district building". Charlotte Business Journal. Retrieved 16 October 2022.
- "Mint & Morehead". Emporis. Archived from the original on May 23, 2022. Retrieved May 17, 2022.
- Franco, Elise (21 April 2022). "UPDATE: Texas developer bringing multifamily tower to high-profile site near Bank of America Stadium (RENDERINGS)". Charlotte Business Journal. Retrieved 3 May 2022.
- "400H". www.emporis.com. Archived from the original on August 17, 2021.
- "400 Hillsborough Street | Projects". Gensler. Retrieved 2019-02-27.
- "400H". Barnhill Contracting Company. Retrieved 2020-09-07.
- Graham, Ben (2 November 2018). "North Hills tower plans increase height to 18 stories". Triangle Business Journal. Retrieved 18 November 2022.
- Harshberger, Caleb (25 January 2021). "Kane's next big project in North Hills is $1B innovation district with food hall". Triangle Business Journal. Retrieved 18 November 2022.
- "North Hills Tower 5". Kan Realty Corporation. Retrieved 18 November 2022.
- "GoTriangle's 40-story tower in downtown Raleigh could get more affordable housing". Raleigh News & Observer.
- Harshberger, Caleb (3 June 2021). "Downtown Raleigh development calls for 20-story building with hundreds of apartments". Triangle Business Journal. Retrieved 18 November 2022.
- Harshberger, Caleb (14 March 2022). "2-tower development in downtown Raleigh will be HQ for local bank. Here's when construction starts". Triangle Business Journal. Retrieved 18 November 2022.
- Braiser, John (1 May 2019). "(PHOTOS) Carroll plans $140 million development south of ballpark". Triad Business Journal. Retrieved 25 November 2022.
- Braiser, John (21 April 2020). "Carroll Cos. owns the resources to motor ahead during pandemic". Triad Business Journal. Retrieved 25 November 2022.
- "Durham to see several 27-story skyscrapers: 300 ft. height limit explains the size | North Carolina Construction News". www.ncconstructionnews.com. June 2022. Retrieved 2022-11-13.
- "Durham Center II". Building Bull City. 17 December 2021. Retrieved 25 November 2022.
- "Durham Center II". Craig Davis Properties. Retrieved 25 November 2022.
- "Queens Bridge Collective Office Tower". Emporis. Archived from the original on May 23, 2022. Retrieved April 25, 2022.
- Huguley, Colin (10 March 2022). "RENDERINGS: Developer reveals new details about massive project on edge of uptown and South End". Charlotte Business Journal. Retrieved 13 September 2022.
- Franco, Elise (13 September 2022). "Riverside reveals changes to Queensbridge Collective project near uptown Charlotte, South End (RENDERINGS)". Charlotte Business Journal. Retrieved 13 September 2022.
- "Joint venture plans South End office tower to start construction in 2023". Charlotte Business Journal. bizjournals. Retrieved February 3, 2022.
- "High-rise planned at prime South End site, with Tyber Creek Pub slated for revamp". Charlotte Business Journal. bizjournals. Retrieved November 11, 2021.
- Franco, Elise (19 October 2022). "VeLa Development Partners lays out plans for $170M apartment tower uptown". Charlotte Business Journal. bizjournals. Retrieved 19 October 2022.
- "Price's Chicken Coop land sold for close to $4M. Here's what's next for the site". Charlotte Observer. McClatchy. Retrieved September 2, 2022.
- "Development". Catalyst Capital Partners. Retrieved 15 October 2022.
- "Carson South End". Emporis. Archived from the original on May 14, 2022. Retrieved April 26, 2022.
- "Charlotte skyline to change again with a 31-story, $600 million tower in South End". Charlotte Observer. McClatchy. Retrieved February 23, 2022.
- Franco, Elise (28 November 2022). "Crescent Communities, Nuveen Real Estate release new details on Carson & Tryon project in South End". Charlotte Business Journal. Retrieved 28 November 2022.
- "Carson & Tryon". Crescent Communities. Retrieved 4 November 2022.
- "Enterprise site development aims to connect South End with Uptown". Axios Charlotte. Axios. 26 February 2022. Retrieved February 28, 2022.
- Franco, Elise (22 June 2022). "The Spectrum Cos. to manage leasing of planned South End development". Charlotte Business Journal. Retrieved 1 November 2022.
- Lu, Yiwen (16 June 2021). "New mixed-use tower planned next to popular South End brewery. Here's what we know". Charlotte Observer. Retrieved 16 June 2021.
- "Development Report Center City Charlotte" (PDF). Center City Partners. 1 August 2022. Retrieved 21 October 2022.
- "Development Report Center City Charlotte" (PDF). Center City Partners. 1 August 2022. Retrieved 21 October 2022.
- "Duke Energy building sales to bring apartments, hotel and shops to uptown sites". Charlotte Business Journal. 2 May 2022. Retrieved 21 October 2022.
- "Development Report Center City Charlotte" (PDF). Center City Partners. 1 August 2022. Retrieved 21 October 2022.
- "Phillips Place Office Tower". Emporis. Archived from the original on May 11, 2022. Retrieved May 11, 2022.
- "Charlotte City Council approves rezoning for 10-story office tower at Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 19, 2022.
- "Lincoln Harris files plans for new office tower at Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 21, 2022.
- "Site plan filed for new office tower at SouthPark's Phillips Place". Charlotte Business Journal. bizjournals. Retrieved April 21, 2022.
- "CBJ Morning Buzz: Developer's vision includes tallest building in SouthPark; Construction academy to launch here amid national expansion". Charlotte Business Journal. bizjournals. Retrieved April 19, 2022.
- Muccigrosso, Catherine (15 October 2022). "Regal closing south Charlotte movie theater as parent company confronts bankruptcy". Charlotte Observer. Retrieved 19 October 2022.
- Franco, Elise (26 January 2023). "Atlanta-based Cousins Properties to develop South End office tower at site of parking lot". Charlotte Business Journal. Retrieved 26 January 2023.
- Fahey, Ashley (2 December 2020). "RailYard acquisition shatters office market record in $201M buy". Charlotte Business Journal. Retrieved 26 January 2023.
- Franco, Elise (30 January 2023). "Akridge, Kettler to add 865 apartments in South End". Charlotte Business Journal. Retrieved 30 January 2023.
- Sealey, Clayton (9 February 2022). "Special report: South End's booming skyline". Charlotte Ledger. Retrieved 2 January 2023.
- Rago, Gordon (26 May 2023). "First look at latest towers coming to South End, planned for near Common Market". Charlotte Observer. Retrieved 26 May 2023.
- Spanberg, Erik (8 June 2023). "Australian developer Salter Brothers puts stalled InterContinental Hotel plan back in motion, eyes mid-2026 opening". Charlotte Business Journal. Retrieved 8 June 2023.
- Thomas, Jason (December 7, 2017). "2 new luxury hotels set to begin construction". Agenda. Charlotte Agenda. Retrieved December 12, 2017.
- Spanberg, Erik. "Construction of InterContinental Hotel atop historic theater in uptown on hold". Charlotte Business Journal. bizjournals. Retrieved April 25, 2021.
- Soloff, Katie Peralta (2021-03-13). "Charlotte hotels could be in trouble". Axios Charlotte. Retrieved 2021-07-06.
- Eanes, Zachery. “Another Peace Street Rezoning Request Asks for the Ability to Build up to 40 Stories.” Newsobserver, Raleigh News & Observer, 15 May 2019, www.newsobserver.com/news/business/article230436969.html.
- Eanes, Zachery (April 25, 2019). "Kane Realty's 40-story tower gets positive recommendation from planning commission". The News & Observer. Retrieved August 8, 2019.
- "Home - the Nash the Nash | Downtown Raleigh Condominium". Archived from the original on June 22, 2021. Retrieved June 16, 2021.
- "Civic Campus Master Plan". Raleigh Convention Hotel and Downtown Development Project. Retrieved 18 November 2022.
- "Home". Downtown South.
- "MCDowell Street Is Growing". Instagram. Retrieved 2022-02-09.
- Purtell, David (19 May 2022). "First high-rise buildings unveiled for Downtown South in Raleigh". Triangle Business Journal. Retrieved 18 November 2022.
- "Kimpton to Open Hotel in Downtown Raleigh, North Carolina in 2025". Hotel News Resource Mobile Edition. 25 May 2022. Retrieved 18 November 2022.
- Purtell, David (11 May 2022). "TBJ Plus: 40-story request in Raleigh nears decision; Durham restaurant on the move; RDU's big day". Triangle Business Journal. Retrieved 18 November 2022.
- Thompson, Kayli (13 October 2022). "First high-rise buildings unveiled for Downtown South in Raleigh". Triangle Business Journal. Retrieved 18 November 2022.
- Harshberger, Caleb (14 February 2022). "Owners seek 40-story option next to new downtown Raleigh tower". Triangle Business Journal. Retrieved 18 November 2022.
- Barnes, Cliff (2 August 2022). "Trammell Crow pitches 30-story tower to replace downtown Raleigh nightclub". Triangle Business Journal. Retrieved 19 November 2022.
- Sanchez-Guerra, Aaron (12 October 2021). "32- and 20-story towers are in the works on Glenwood South. Here are the details". The News & Observer. Retrieved 18 November 2022.
- "Administrative Site Review Application" (PDF). City of Raleigh. Retrieved 18 November 2022.
- "Rezoning Z-12-22" (PDF). City of Raleigh. Retrieved 18 November 2022.
- "Administrative Site Review Application" (PDF). City of Raleigh. Retrieved 18 November 2022.
- "Administrative Site Review Application" (PDF). City of Raleigh. Retrieved 18 November 2022.
- Thompson, Kayli (24 October 2022). "New Raleigh tower to feature luxury condos, apartments as NY developer charts 'trophy asset'". Triangle Business Journal. Retrieved 18 November 2022.
- Harshberg, Caleb. "Another hotelier eyes 40-story option in downtown Raleigh". Retrieved 2022-02-09.
- "Administrative Site Plan Review Plans For: NEXUS MXU – PHASE 1" (PDF). cityofraleigh. Retrieved 2020-09-07.
- "Envisioning the New Civic Tower | raleighnc.gov". www.raleighnc.gov. Retrieved 2019-02-27.
- "Civic Campus Master Plan" (PDF). City of Raleigh. Retrieved 18 November 2022.
- "Raleigh Crossing, Raleigh, NC • The Fallon Company". The Fallon Company. Retrieved 2020-09-07.
- "20 stories could rise around Videri". RAL Today. Retrieved 18 November 2022.
- "North Hills Rezoning". North Hills. Retrieved 2022-02-09.
- Johnson, Anna (27 August 2022). "Kane Realty pitches 'micro-units' in exchange for up to 40 stories in North Hills". MSN. Retrieved 18 November 2022.
- "Rezoning Application and Checklist" (PDF). City of Raleigh. Retrieved 18 November 2022.
- Harshberger, Caleb (9 February 2022). "Durham to get 27-story apartment tower, office building on YMCA site". Triangle Business Journal. Retrieved 25 November 2022.
- https://www.bizjournals.com/triangle/news/2022/11/28/downtown-raleigh-development-height-city-council.amp.html
- https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR15/ASR-0090-2021.pdf