MV Alfred

MV Alfred is a catamaran ferry owned by Pentland Ferries, currently chartered to Caledonian MacBrayne for nine months for their west coast service.[4][5]

The Alfred approaches St Margaret's Hope
History
NameMV Alfred
NamesakeAndrew Banks' (owner of Pentland Ferries) father
OwnerPentland Ferries
OperatorCaledonian MacBrayne
RouteArdrossan - Brodick
BuilderStrategic Marine Shipyard, Vũng Tàu, Vietnam[1]
Cost£14.5 million[2]
Laid downApril 2017[2]
Launched22 February 2019[1]
In service1 November 2019[3]
HomeportKirkwall, Orkney, Scotland
General characteristics
TypeRo-Pax Catamaran
Tonnage2995 GRT
Length84.5 m (277 ft)
Beam22 m (72 ft)
Draft2.7 m (9 ft)
Depth5.3 m (17 ft)
Installed power
  • Main Engines: 4 x Yanmar 6EY17W @ 749KW
  • Generators: 2 x Volvo Penta D9-MG
  • Bow Thrusters: 4 x VETH VT-240 FP, each 300KW
Propulsion4x Fixed Pitch Propellors
Speed16 knots
Capacity
  • 430 passengers
  • 98 cars, or
  • 54 cars and 12 trucks
  • 550t deadweight
Crew12/13
Notes
  • Crew cabins:12
  • Fuel: 50,000 L
  • Fresh Water: 20,000 L
  • Black Water: 12,000 L

Background

MV Alfred was built in Vũng Tàu, Vietnam by Strategic Marine Vietnam at a cost of £14 million, and launched on 22 February 2019.[1][2] Designed with a capacity of 430 passengers and 98 cars, Alfred is described by their owner as the most environmentally friendly ferry in Scotland, claiming the diesel-powered ship is "more than 60 per cent more efficient in terms of fuel consumption and emission levels than other comparable ferries operating in Scotland".[6][7] In 2020, Pentland Ferries became the first ferry operator in the UK to win a Green Tourism Award for the Alfred.[7]

Upon completing sea trials, Alfred departed Vũng Tàu, Vietnam on 29 August 2019 and arrived in St Margaret's Hope, Orkney, Scotland on 9 October 2019,[2] entering service on the Caithness and Orkney route on 1 November 2019.[3]

Isle of Swona Grounding

At about 14:00 on 5 July 2022, Alfred grounded on the uninhabited island of Swona while enroute from Gills Bay to St Margaret's Hope. It resulted in damage to the port bulbous bow and no reported water ingress. There were 84 passengers and 13 crew onboard at the time of grounding. Some passengers sustained injuries, such as fractures, sprains and soft tissue damage, one passenger was hospitalised.[8][9]

Alfred was refloated within one and a half hours, and taken to Orkney under her own power under escort of two lifeboats and two tugs.[10]

Alfred was taken off service until 18 July 2022.[11]

CalMac Ferries Charter

In March 2023, the Scottish Government announced that it had chartered Alfred for nine months to supplement the Caledonian MacBrayne fleet, at a cost of £9 million.[12] The charter was due to start on 18 April 2023, but was delayed for a week due to MV Pentalina being unable to get her Passenger Ship Safety Certificate in time; she received a temporary one and resumed service on 26 April 2023, allowing Alfred to be released to her charter.

After completing berthing trials across the CalMac network, Alfred was laid up at Ayr in order to carry out repairs to her hydraulics system and make adjustments to her stern ramp. During this time, she was off hire from her charter.[13]

On 11 May 2023, CalMac confirmed that she had completed berthing trials at Lochmaddy, Ullapool, Port Askaig, Brodick, Ardrossan (only the Irish Berth), Troon and Campbeltown. However, she couldn't operate out of Port Askaig at the time due to a technical issue with her starboard thruster. As a result, CalMac initially deployed her on the Ardrossan to Brodick route from 12 May 2023, carrying out two return sailings to Arran per day for the first two weeks.[14][15] After which, she began the schedule of three return sailings to Arran Friday to Monday, and two Tuesday to Thursday. From 10 August, there was an additional return on Thursdays.

During September 2023, it was announced that Alfred would undergo further berthing trials in Stornoway at the end of the month, after finishing the peak summer season second vessel duties at Arran.[16] If successful, she would have carried out the freight sailings there whilst MV Arrow was unavailable and Loch Seaforth was at annual overhaul. The berthing trial was postponed as Alfred was broken down in Ayr with a gearbox problems.[17] On 27 October 2023, CalMac assigned Alfred back to the Arran route for her next period of resilience operations beginning on 4 November 2023, releasing MV Caledonian Isles for berthing trials at Oban and Craignure.[18]

References

  1. "Alfred takes to the water in Vietnam". The Orcadian. 25 February 2019. Retrieved 2023-04-30.
  2. "Pentland Ferries' new £14m MV Alfred arrives after 9000-mile trip". John O'Groat Journal and Caithness Courier. 10 October 2019. Retrieved 2023-04-30.
  3. "Pentland Ferries' new catamaran set to make inaugural voyage across firth". John O'Groat Journal and Caithness Courier. 1 November 2019. Retrieved 2023-04-30.
  4. "Chartered CalMac catamaran to begin sea trials". BBC News. 27 Apr 2023. Retrieved 2023-04-30.
  5. "85m ROPAX FERRY". Strategic Marine. Retrieved 2023-05-11.
  6. "Welcome to Orkney for MV Alfred". Orkney.com. 9 October 2019. Retrieved 2023-04-30.
  7. "Pentland Ferries wins Green Tourism Award". Press & Journal. 14 February 2020. Retrieved 2023-04-30.
  8. "Orkney ferry passengers launch injuries legal bid over grounding". BBC News. 2022-09-23. Retrieved 2023-05-11.
  9. Bouma, James Delaney, Haley (2022-07-05). "One in hospital as passengers evacuated after ferry runs aground". STV News. Retrieved 2023-05-11.{{cite web}}: CS1 maint: multiple names: authors list (link)
  10. "Passengers evacuated from grounded ferry in Pentland Firth". BBC News. 2022-07-05. Retrieved 2023-05-11.
  11. "Pentland Ferries - MV ALFRED INCIDENT". 2022-07-07. Retrieved 2023-05-11.
  12. "Extra ferry to join CalMac fleet on west coast network". BBC News. 20 March 2023. Retrieved 2023-04-30.
  13. "Further delay to Orkney's Alfred joining CalMac fleet". BBC News. 5 May 2023. Retrieved 2023-05-11.
  14. "Customer Update - MV Alfred chartered as relief vessel for 9 months". CalMac Ferries. Retrieved 2023-05-11.
  15. "Delayed CalMac catamaran begins sailings on Arran route". BBC News. 12 May 2023. Retrieved 2023-05-12.
  16. "CalMac chartered catamaran ferry, MV Alfred, earmarked for Stornoway relief stint". www.hebrides-news.com. 14 September 2023. Retrieved 2023-09-18.
  17. "CalMac's relief ferry, MV Alfred, postpones Stornoway trials". www.hebrides-news.com. 27 September 2023. Retrieved 2023-10-01.
  18. "MV Alfred leaving Western Isles area for repairs and latest deployment". www.hebrides-news.com. 27 October 2023. Retrieved 2023-10-27.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.