Madhukunda railway station
Madhukunda railway station serves Madhukunda, Tiluri village and surrounding areas in Purulia and Bankura districts in the Indian state of West Bengal. It is located on the southern bank of the Damodar and a railway bridge connects it to Damodar railway station.
Madhukunda | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Indian Railways station | |||||||||||
General information | |||||||||||
Location | Mdhukunda, Purulia district, West Bengal India | ||||||||||
Coordinates | 23.6269°N 86.8695°E | ||||||||||
Elevation | 128 metres (420 ft) | ||||||||||
Owned by | Indian Railways | ||||||||||
Operated by | South Eastern Railway | ||||||||||
Line(s) | Asansol–Adra line | ||||||||||
Platforms | 2 | ||||||||||
Construction | |||||||||||
Structure type | At Ground | ||||||||||
Parking | No | ||||||||||
Bicycle facilities | No | ||||||||||
Other information | |||||||||||
Station code | MDKD | ||||||||||
Division(s) | Adra | ||||||||||
History | |||||||||||
Opened | 1891 | ||||||||||
Electrified | 1957–62 | ||||||||||
Previous names | Bengal Nagpur Railway | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Madhukunda Location in West Bengal Madhukunda Location in India |
Adra–Asansol line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
History
The Bengal Nagpur Railway main line from Nagpur to Asansol, on the Howrah–Delhi main line, was opened for goods traffic on 1 February 1891.[1]
Electrification
The Tatanagar–Adra–Asansol section was electrified in the 1957–1962 period.[2] The Asansol–Purulia sector was electrified in 1961–62.[3]
References
- "Major Events in the Formation of S.E. Railway". South Eastern Railway. Archived from the original on 1 April 2013. Retrieved 6 May 2013.
- Ghose, Arabinda. "Platinum Jubilee of Railway Electrification in India". Press Information Bureau. Retrieved 6 May 2013.
- "History of Electrification". IRFCA. Retrieved 6 May 2013.
- "ACC Limited, formerly Associated Cement Companies Ltd". ACC Limited. Retrieved 6 May 2013.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.