Miyafuku Line

The Miyafuku Line (宮福線, Miyafuku-sen) is a railway line of Kyoto Tango Railway in Kyoto Prefecture, Japan. Trains on the line are operated by Willer Trains Inc. as part of its Kyoto Tango Railway system.

Miyafuku Line
Overview
Native name宮福線
OwnerKyoto Tango Railway
LocaleKyoto
Termini
Stations14
Service
TypeCommuter rail line
Operator(s)Willer Trains
History
Opened1988
Technical
Line length30.4 km (18.9 mi)
Track gauge1,067 mm (3 ft 6 in)
Electrification1500 V DC Overhead catenary
Operating speed130 km/h (81 mph)

History

Building of the line was approved in 1953, with construction commencing in 1966, but being suspended in 1980 due to the financial constraints being experienced by JNR at the time.

In 1982 the Miyafuku Railway Co. was established to recommence construction, which resumed the following year.

The line opened in 1988, featuring 10 tunnels, including the 3215-meter Fukō Tunnel, the 2175-meter Shimoamazu Tunnel and the 2103-meter Tochiba Tunnel. The following year the company renamed itself the Kitakinki Tango Railway.

The line was electrified in 1996 to enable through services with the JR Fukuchiyama Line.

On April 1, 2015, the train operation business of Kitakinki Tango Railway was transferred to Willer Trains, Inc., which named the railway system the Kyoto Tango Railway.[1] At this time, the name of Atsunakatonya Station was changed to Fukuchiyama-shimin-byōin-guchi Station.[2] Unlike the Miyazu Line, the name of this line was not changed.

Station list

  • All stations located within Kyoto Prefecture.
  • Legend: S - all trains stop; s - some trains stop; s - "Tango Aomatsu" 2 stops; | - all trains pass
No. Station Japanese Distance (km) Rapid "Oeyama" Rapid "Tango Aomatsu" Limited Express Transfers Location
Between
Stations
Total
Miyafuku Line
F1 Fukuchiyama 福知山 - 0.0 S S S JR West: San'in Main Line, Fukuchiyama Line Fukuchiyama
F2 Fukuchiyama-shimin-byōin-guchi 福知山市民病院口 1.5 1.5 s | |  
F3 Aragakashinokidai 荒河かしの木台 1.4 2.9 S s |  
F4 Maki 2.2 5.1 S s |  
F5 Shimo-Amazu 下天津 2.5 7.6 s | |  
F6 Gujō 公庄 2.4 10.0 s | |  
F7 Ōe 大江 2.5 12.5 S S S  
F8 Ōe-Kōkōmae 大江高校前 0.9 13.4 s | |  
F9 Futamata 二俣 2.0 15.4 | | |  
F10 Ōeyamaguchi-Naiku 大江山口内宮 2.2 17.6 S s |  
F11 Karakawa 辛皮 3.7 21.3 s | |   Miyazu
F12 Kita 喜多 6.0 27.3 s | |  
F13 Miyamura 宮村 1.6 28.9 S s |  
14 Miyazu 宮津 1.5 30.4 S S S Miyazu Line
Miyazu Line
T15 Amanohashidate 天橋立 4.4 34.8 S S   Miyazu

See also

References

  1. 小佐野カゲトシ (April 1, 2015). "ウィラー初の鉄道路線「京都丹後鉄道」スタート…北近畿タンゴ鉄道の運行引き継ぐ". Response (in Japanese). Retrieved April 5, 2015.
  2. JRP Group. "Japan Rail pass". Retrieved April 4, 2015.

This article incorporates material from the corresponding article in the Japanese Wikipedia

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.