Green Line (VTA)

The Green Line is a light rail line in Santa Clara County, California, and part of the Santa Clara Valley Transportation Authority (VTA) light rail system. It serves 26 stations in the cities of Santa Clara, San Jose, and Campbell, traveling between Old Ironsides and Winchester stations. The line connects Levi's Stadium, San Jose International Airport (via a bus connection), Downtown San Jose, San Jose State University, SAP Center, Diridon station, and Downtown Campbell. It runs for 20 hours per day on weekdays, with headways of 15 minutes for most of the day. On weekends, train run at 20 minute headways for most of the day. After around 8pm on weekdays and weekends trains run at 30 minute headways.

Green Line (VTA) Green Line
A Green Line train bound for Winchester station stops at Paseo de San Antonio station along Downtown San Jose's transit mall.
Overview
LocaleSanta Clara County, California
Cities: Santa Clara, San Jose, and Campbell
Termini
Stations26
Service
TypeLight rail
SystemSanta Clara VTA Light Rail
Operator(s)Santa Clara Valley Transportation Authority
Rolling stockKinki Sharyo light rail vehicles (low floor)
History
Opened1987
Technical
Line length22.3 mi (35.89 km)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead lines, 750 V DC
Highest elevationat grade, elevated, underground
Route map
Orange Line (VTA)
Orange Line
to Mountain View
Old Ironsides
Orange Line (VTA)
Great America
Orange Line (VTA)
Lick Mill
Amtrak Altamont Corridor Express Orange Line (VTA)
Santa Clara
San Jose
Champion
Orange Line (VTA)
Tasman
Blue Line (VTA)
River Oaks
Parking Blue Line (VTA)
Orchard
Blue Line (VTA)
Bonaventura
Blue Line (VTA)
Component
Blue Line (VTA)
Karina
Blue Line (VTA)
Metro/Airport
San Jose International Airport (via List of Santa Clara VTA bus routes#60) Blue Line (VTA)
Gish
Blue Line (VTA)
Guadalupe Division
Civic Center
Blue Line (VTA)
Japantown/Ayer
Blue Line (VTA)
Saint James
Blue Line (VTA)
Santa Clara
Blue Line (VTA)
Paseo de San Antonio
Blue Line (VTA)
Convention Center
Blue Line (VTA)
San Fernando
San Jose Diridon enlarge…
AmtrakCaltrainAltamont Corridor ExpressParking
West San Carlos
planned
Race
Fruitdale
Bascom
Parking
San Jose
Campbell
Hamilton
Downtown Campbell
Winchester
Parking

Handicapped/disabled access All stations are accessible

Route description

From north to south, the Green Line starts from Old Ironsides station in Santa Clara, where it shares service with the Orange Line. Traveling eastwards on Tasman Drive, the Green Line passes Levi's Stadium and the future Related Santa Clara mega-development. At First Street, it turns south and shares tracks with the Blue Line to Downtown San Jose. After Convention Center station, it separates from the shared tracks with the Blue Line, makes a stop at San Fernando and San Jose Diridon stations, then heads southwest towards Winchester station in Campbell. The whole route takes approximately one hour.

Owl service

From February 2000 to April 14, 2003, VTA operated all night train service with light rail vehicles (commonly known as "owl service") on a 70-minute frequency between Mountain View and Baypointe. At the time, VTA light rail was the only light rail service in the United States to operate 24 hours a day. The owl service was curtailed in 2003 as a result of mounting deficits.

Construction history

The route that the Mountain View–Winchester line now runs on is constructed in three different expansion projects: the original Guadalupe line, the Tasman West extension, and the Vasona extension.

Guadalupe line

The trackway between Woz Way in Downtown San Jose and Old Ironsides station is part of the Guadalupe line, the first light rail line constructed in Santa Clara county. The Guadalupe line opened for revenue service on December 11, 1987 originally running from Old Ironsides station to Civic Center station in San Jose. Champion station was not part of the original line; it was added as intermediate stop as part of the Tasman West project.[1][2]

UTDC-built LRV in 1993 arriving at Old Ironsides station, which was the northern terminus of the system's first section of light rail line, opened in 1987

Service on this line was gradually expanded south from Civic Center station as follows:

  • Service through the downtown mall and onward to the Convention Center station began on July 17, 1988.[3]
  • Service between Convention Center and Tamien stations began on August 17, 1990.[4]
  • Service between Tamien and Santa Teresa stations began on April 25, 1991.[5]

Tasman West extension

The Tasman West extension project added the following features to the line as follows:

  • Champion station added as an infill stop along the existing Guadalupe line trackway (Station opened March 24, 1997).[6]
  • 7.6 miles (12.2 km) of trackway and 12 new light rail stations added between the existing Old Ironsides station and the new Downtown Mountain View station. (Opened December 17, 1999.)
  • Baypointe station added just east of the intersection of 1st and Tasman. (Opened December 17, 1999.)
Baypointe station is no longer served by this line due to a line reconfiguration implemented in August 2005.
  • After the completion of Tasman West extension and before the completion of Tasman East/Capitol and Vasona extensions, VTA split the light rail system into two main lines: one line running between Baypointe and Downtown Mountain View, the other between Baypointe and Santa Teresa. Passengers transferred between the two lines at the new Baypointe station.[7] Tasman is now the transfer station.

Tasman West extension was constructed with funds from 1996 Measure B sales tax measure.

Vasona extension

Mountain View–Winchester contains the entire Vasona extension from San Fernando station to the southern line terminal, Winchester station, 5.3 miles (8.5 km).[8] Vasona extension opened for revenue service on October 1, 2005. It was originally scheduled to open two months earlier on August 1 but was delayed due to a dispute between Federal Railroad Administration and VTA. At issue was whether a waiver was needed from FRA, since the Union Pacific branchline that parallels most of Vasona extension is still actively used on a tri-weekly basis to serve the Permanente Quarry cement plant in the Cupertino Foothills and a lumber yard in Campbell. A waiver was finally obtained on the condition that all light rail vehicles sound their horns at crossings until "Quiet Zone" improvements are implemented. Freight trains are still required to sound their horns. The Vasona extension was also constructed with funds from 1996 Measure B sales tax measure.

Light Rail Efficiency Project

In 2014, a new storage track and crossover was constructed between Old Ironsides and Reamwood as part of improvements to support events at Levi's Stadium and the future Silicon Valley BART extension.[9]

To provide better headways and service reliability, a second track was constructed between Whisman and Downtown Mountain View. Work began in summer 2014 and was completed in late 2015. Evelyn Station was permanently closed in mid-March 2015 as part of track construction.[10]

2019 reconfiguration

Upon the opening of the Silicon Valley BART extension to Berryessa / North San Jose, Line 902 will be split into the Green Line (Old IronsidesWinchester) and the Orange Line (Mountain ViewAlum Rock). As of early 2019, station signage has begun to reflect the future configuration, displaying line colors rather than terminus icons.[11]

Station stops

Station Transfer to
Old Ironsides
Great America
Lick Mill
Champion
Tasman
River Oaks
Orchard
Bonaventura
Component
Karina
Metro/Airport
Gish
Civic Center
Japantown/Ayer
Saint James
Santa Clara
Paseo de San Antonio
  • Blue Line
  • VTA Bus: 23, 66, 68, Rapid 523, Rapid 568
Convention Center
San Fernando
San Jose Diridon
Race
Fruitdale
  • VTA Bus: 25, 103
Bascom
  • VTA Bus: 61
  • Park and ride
Hamilton
  • VTA Bus: 56
Downtown Campbell
  • VTA Bus: 26
Winchester
  • VTA Bus: 27, 37, 60, 101
  • Park and ride

Station facilities

Many stations along this line have park-and-ride lots (labeled as ), as well as bike stations (labeled as ), including:

  • Lick Mill (at Great America Station: )
  • River Oaks — also the stop for VTA headquarters
  • San Fernando
  • San Jose Diridon
  • Bascom
  • Winchester

References

  1. Robinson, Bert (December 11, 1987). "All Aboard - It's Off and Rolling". San Jose Mercury News. et al. Sec A:1.
  2. Grant, Joanne (November 6, 1987). "Mishap Won't Delay Light Rail". San Jose Mercury News. Sec B:3.
  3. Sweeney, Frank (July 13, 1988). "Downtown S.J. Trollys Start Friday". San Jose Mercury News. Sec B:1.
  4. "Light Rail to Willow Glen Opening Friday". San Jose Mercury News. August 16, 1990. Sec B:3.
  5. Guido, Michelle (April 25, 1991). "The Trolly Finally Makes its Way South in Debut Today". San Jose Mercury News. Sec A:1.
  6. Barnacle, Betty (March 24, 1997). "Light Rail Opens New Stop; First Station on Tasman Line to Serve North S.J. High-Tech Firms". San Jose Mercury News. Sec B:1.
  7. Diaz, Sam (December 18, 1999). "Ready for a Rail Good Time: Major Link for Transit Takes its First Step". San Jose Mercury News. Sec B:1.
  8. "Vasona Light Rail Extension Project". Santa Clara Valley Transportation Authority. Retrieved 28 February 2019.
  9. "Light Rail Efficiency". Light Rail Efficiency. Santa Clara Valley Transportation Authority. Retrieved May 13, 2015.
  10. "Mountain View Double Track". Mountain View Double Track. Santa Clara Valley Transportation Authority. Retrieved May 13, 2015.
  11. "Downtown Mountain View station". Mapillary. February 27, 2019. Retrieved March 4, 2019.
Template:Attached KML/Green Line (VTA)
KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.