Mumbai Central–Gandhinagar Capital Vande Bharat Express

The 20901/20902 Mumbai Central - Gandhinagar Capital Vande Bharat Express is India's 3rd Vande Bharat Express train, connecting the states of Maharashtra and Gujarat.

Mumbai Central - Gandhinagar Capital
Vande Bharat Express
3rd VB Express train standing at Gandhinagar Central with Hotel Leela in the background and waiting for departure towards Mumbai Central
Overview
Service typeVande Bharat Express
LocaleMaharashtra and Gujarat
First service30 Sept 2022 (Inaugural run)
1 October 2022 (2022-10-01) (Commercial run)
Current operator(s)Western Railways (WR)
Route
TerminiMumbai Central (MMCT)
Gandhinagar Capital (GNC)
Stops5
Distance travelled522 km (324 mi)
Average journey time06 hrs 15 mins
Service frequencySix days a week [lower-alpha 1]
Train number(s)20901 / 20902
Line(s) usedAhmedabad–Mumbai main line
Ahmedabad - Gandhinagar Capital line
On-board services
Class(es)AC Chair Car, AC Executive Chair Car
Seating arrangements
  • Airline style
  • Rotatable seats
Sleeping arrangementsNo
Catering facilitiesOn-board catering
Observation facilitiesLarge windows in all coaches
Entertainment facilities
Baggage facilitiesOverhead racks
Other facilitiesKavach
Technical
Rolling stockVande Bharat 2.0
Track gaugeIndian gauge
1,676 mm (5 ft 6 in) broad gauge
Electrification25 kV 50 Hz AC Overhead line
Operating speed83 km/h (52 mph) to 85 km/h (53 mph) (Avg.)
Average length384 metres (1,260 ft) (16 coaches)
Track owner(s)Indian Railways
Rake maintenanceMumbai Central (MMCT)

Overview

This train is operated by Indian Railways, connecting Mumbai Central, Borivali, Vapi, Surat, Vadodara Jn, Ahmedabad Jn and Gandhinagar Capital. It is currently operated with train numbers 20901/20902 on 6 days a week basis.[1][2][3][4]

Rakes

It is the first 2nd Generation Vande Bharat Express train and was designed and manufactured by the Integral Coach Factory (ICF) under the leadership of Sudhanshu Mani at Perambur, Chennai under the Make in India initiative.

Coach Composition

The 20901/20902 Mumbai Central - Gandhinagar Capital Vande Bharat Express currently has 14 AC Chair Car and 2 Executive Chair Cars coaches.

The coaches in Aqua color indicate AC Chair Cars and the coaches in Pink color indicate AC Executive Chair Cars.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
20901 | C1 C2 C3 C4 C5 C6 C7 E1 E2 C8 C9 C10 C11 C12 C13 C14 |
20902 | C14 C13 C12 C11 C10 C9 C8 E2 E1 C7 C6 C5 C4 C3 C2 C1 |

Service

The 20901/20902 Mumbai Central - Gandhinagar Capital Vande Bharat Express currently operates 6 days a week, covering a distance of 522 km (324 mi) in a travel time of 6 hrs 15 mins with average speeds of 83 km/h to 85km/h. The Maximum Permissible Speed (MPS) given is 130 km/h.

  1. Except Wednesdays

Schedule

The schedule of this 20901/20902 Mumbai Central - Gandhinagar Capital Vande Bharat Express is given below:-

MMCT - GNC - MMCT Vande Bharat Express
20901 Stations 20902
Arrival Departure Arrival Departure
---- 06:10 Mumbai Central 20:15 ----
06:23 06:25 Borivali 19:32 19:34
08:00 08:02 Vapi 18:13 18:15
08:55 08:58 Surat 17:10 17:13
10:13 10:16 Vadodara Junction 15:53 15:56
11:25 11:30 Ahmedabad Junction 14:45 15:00
12:25 ---- Gandhinagar Capital ---- 14:05

Incidents

A week after the inauguration of the 3rd Vande Bharat Express train, this train rammed into cattle near Atul station in Gujarat, on October 29 morning, causing 15-20 delay in reaching its destination. No casualties were involved in this incident.[5]

See also

References

  1. telang, Kamlesh. "20901/Mumbai Central - Gandhinagar Capital Vande Bharat Express - Mumbai to Gandhinagar Capital WR/Western Zone - Railway Enquiry". indiarailinfo.com. Retrieved 15 December 2022.
  2. telang, Kamlesh. "20902/Gandhinagar Capital - Mumbai Central Vande Bharat Express - Gandhinagar Capital to Mumbai WR/Western Zone - Railway Enquiry". indiarailinfo.com. Retrieved 15 December 2022.
  3. "Mumbai-Gandhinagar Vande Bharat earns Rs 9.2 crore in ticketing fares in November". The Indian Express. 16 December 2022. Retrieved 16 December 2022.
  4. "Vande Bharat Express 2.0: PM flags off new train between Gandhinagar and Mumbai, here's all to know". Business Today. 30 September 2022. Retrieved 19 December 2022.
  5. Sharma, Sheenu; News, India TV (29 October 2022). "Mumbai-Ahmedabad 'Vande Bharat Express' rams into cattle in 3rd such incident; front panel damaged". www.indiatvnews.com. Retrieved 17 December 2022. {{cite web}}: |last2= has generic name (help)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.