Noida Sector 51 metro station
The Noida Sector 51 is the elevated northern terminal metro station on the North-South corridor of the Aqua Line of Noida Metro in the city of Noida, Uttar Pradesh.[1][2] It was opened to the public on 25 January 2019.[3]
Noida Sector 51 | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Noida Metro station | ||||||||||||||||||||||||||
General information | ||||||||||||||||||||||||||
Location | Block E, Sector 51, Noida, Uttar Pradesh 201301 | |||||||||||||||||||||||||
Coordinates | 28.5857°N 77.3753°E | |||||||||||||||||||||||||
Owned by | Noida Metro | |||||||||||||||||||||||||
Operated by | Noida Metro Rail Corporation (NMRC) | |||||||||||||||||||||||||
Line(s) | Aqua Line | |||||||||||||||||||||||||
Platforms | Side Platform Platform-1 → Train terminates Platform-2 → Depot | |||||||||||||||||||||||||
Tracks | 2 | |||||||||||||||||||||||||
Connections | Noida Sector 52 Blue Line (Delhi Metro) | |||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||
Structure type | Elevated, Double-track | |||||||||||||||||||||||||
Platform levels | 2 | |||||||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||
Website | http://nmrcnoida.com | |||||||||||||||||||||||||
History | ||||||||||||||||||||||||||
Opened | 25 January 2019 | |||||||||||||||||||||||||
Electrified | 25 kV 50 Hz AC through overhead catenary | |||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
Location | ||||||||||||||||||||||||||
Noida Sector 51 Location in Delhi Noida Sector 51 Location in Uttar Pradesh |
The station is connected to the Noida Sector 52 metro station on the Delhi Metro's Blue Line by a 300-metre-long pedestrian walkway.[4] An overhead walkway connecting the two stations will be built by IKEA as part of an agreement signed between the company and the Noida Authority in February 2021.[5] However, IKEA later stated that it would require at least 6 years to open its new showroom in Noida and the adjoining skywalk.[6] In March 2022, the Noida Authority stated that it had floated tenders to construct a 420 metre long and five metre wide, L-shaped, foot overbridge connecting the two stations.[7][8]
Station layout
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Depot next station is Noida Sector 50 | |
Platform 1 Northbound |
Towards ← Train Terminates Here | |
Side platform | Doors will open on the left | ||
L2 | ||
References
- "Noida Metro Project". Noida Metro. Archived from the original on 22 January 2019. Retrieved 28 January 2019.
- "Noida Metro Rail". Greater Noida.
- "Metro's Aqua line linking Noida and Gr Noida opens for public". The Economic Times. 25 January 2019.
- "Switching between Noida Metro Aqua Line and Delhi Metro Blue Line gets hassle-free with dedicated pathway!". The Financial Express. 11 March 2019. Retrieved 11 March 2019.
- Shalabh (20 February 2021). "IKEA to open its first India mall in Noida, pays Rs 850 crore for land". The Times of India. Retrieved 21 February 2021.
- "Noida Authority to soon connect Aqua and Blue line metros with footover bridge". Zee News. 14 March 2022. Retrieved 6 April 2022.
- "In 6 Months, Noida Plans Fob To Link Sec 51-52 Stns | Noida News - Times of India". The Times of India. TNN. 13 March 2022. Retrieved 6 April 2022.
- "Noida: Footover bridge to connect Sector 51, 52 metro stations on Blue, Aqua lines | Details". India Today. 16 March 2022. Retrieved 6 April 2022.