O 21-class submarine
The O 21 class was a class of seven submarines, built for the Royal Netherlands Navy. The boats were still incomplete at the start of the German invasion of the Netherlands O 21, O 22, O 23 and O 24 were hastily launched and escaped to the United Kingdom. O 25, O 26 and O 27 were not able to escape and were captured by the German forces. The Kriegsmarine ordered the completion of the boats and they entered German service as UD-3, UD-4 and UD-5. The submarines' diving depth was 100 meters (330 ft).
HNLMS O 21 | |
Class overview | |
---|---|
Name | O 21 class |
Builders | |
Operators | |
Preceded by | O 19 class |
Succeeded by | Dolfijn class |
Built | 1937–1940 |
Completed | 7 |
Lost | 2 |
Scrapped | 5 |
General characteristics | |
Type | Submarine |
Displacement |
|
Length | 77.7 m (255 ft) |
Beam | 6.8 m (22 ft) |
Draught | 3.95 m (13 ft) |
Propulsion |
|
Speed |
|
Range | |
Complement | 39 |
Armament | 8 × 21 in (530 mm) torpedo tubes (4 bow, 2 stern, 2 traversing amidships ) |
Design
One of the requirements the Royal Netherlands Navy set for the O 21-class was that it had to be able to dive 20 m (66 ft) deeper than the previous class, which was the O 19-class submarine.[1]
Construction
The ships were built by three different shipyards. O 21 and O 22 were built by the Koninklijke Maatschappij. O 23, O 24, O 26 and O 27 by R.D.M, Rotterdam and O 25 also in Rotterdam at Fijenoord shipyard.
Name | Laid down | Launched | Commissioned | Decommissioned |
---|---|---|---|---|
O 21 | 20 November 1937 | 21 October 1939 | 10 May 1940 (uncompleted) | 2 November 1957 |
O 22 | 20 November 1937 | 20 January 1940 | 10 May 1940 (uncompleted) | 8 November 1940 |
O 23 | 12 October 1937 | 5 December 1939 | 13 May 1940 (uncompleted) | 1 December 1948 |
O 24 | 12 November 1937 | 18 March 1940 | 13 May 1940 (uncompleted) | 22 February 1954 |
O 25 Commissioned as: UD-3 |
10 April 1939 | 1 May 1940 | 8 June 1941 | 13 October 1944 3 May 1945 (scuttled) |
O 26 Commissioned as: UD-4 |
20 April 1939 | 23 November 1940 | 28 January 1941 | 3 May 1945 (scuttled) |
O 27 Commissioned as: UD-5 |
3 August 1939 | 26 September 1941 | 30 January 1942 13 July 1945 (Dutch navy) |
14 November 1959 |
References
- Gerretse and Wijn, p. 9
Bibliography
- Jalhay, P.C.; Wijn, J.J.A. (1997). Ik nader ongezien! De onderzeeboten van de Koninklijke Marine. Amsterdam: De Bataafsche Leeuw. ISBN 9067074624.
- Gerretse, K.H.L.; Wijn, J.J.A. (1993). Drie-cylinders duiken dieper: de onderzeeboten van de dolfijn-klasse van de Koninklijke Marine. Amsterdam: Van Soeren. ISBN 9068810278.