Panyu Square station

Panyu Square station (Chinese: 番禺广场站) is a station of Line 3, Line 18 and Line 22 of the Guangzhou Metro. Line 3 started operation on 30 December 2006, Line 18 started operation on 28 September 2021 and Line 22 started operation on 31 March 2022.

Panyu Square

番禺广场
Guangzhou Metro
Platform 4 (Line 18 southbound platform)

Platform 2 (Line 3 northbound platform)
Chinese name
Simplified Chinese番禺广场站
Traditional Chinese番禺廣場站
Transcriptions
Standard Mandarin
Hanyu PinyinPānyú Guǎngchǎng Zhàn
Yue: Cantonese
Jyutpingpun1jyu4 gwong2coeng4 zaam6
General information
LocationPanyu District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 3
     Line 18
     Line 22
Platforms6 (3 island platforms)
Tracks6
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code3 01 (Line 3)
18 03 (Line 18)
22 01 (Line 22)
History
Opened30 December 2006 (Line 3)
28 September 2021 (Line 18)
31 March 2022 (Line 22)
Services
Preceding station Guangzhou Metro Following station
Terminus Line 3 Shiqiao
towards Airport North (Terminal 2) or Tianhe Coach Terminal
Nancun Wanbo
towards Xiancun
Line 18 Hengli
towards Wanqingsha
Modiesha
towards Xiancun
Line 18
Express
Shiguanglu
towards Chentougang
Line 22 Terminus

The station is located under the junction of Donghuan Road (东环路) and East Qinghe Road (清河东路) in the Shiqiao Subdistrict, in Panyu District, Guangzhou.[1] Panyu Square is a newly developed area to the south of Shiqiao, surrounded by the new Panyu District Government Building (新番禺区政府大楼), hotel and high-rise buildings.[2][3]

Between 16 April 2022 and 19 August 2022, to provide easier access for passengers going from Line 22 in the direction of Xiancun on Line 18, all Line 22 trains only used platform 5, and platform 6 has been taken out of use as a reserved platform. Passengers for Wanqingsha on Line 18 had to pass through the transfer concourse to reach platform 4. This arrangement has been cancelled since 20 August 2022.

Station layout

G Street level Exits C-F, G1, H
L1
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
L2
Equipment Area
- Station equipment
L3
Platforms
Platform 1  3  termination platform
Island platform, doors will open on the left
Platform 2  3  towards Tianhe Coach Terminal or Airport North (Shiqiao)
L4
Concourse
Transfer Lobby Transfer lobby between Lines 3 & 18
L5
Platforms
Platform 4  18  towards Wanqingsha (Hengli)
Island platform, doors open on the left
Platform 6  22  termination platform
Platform 5  22  towards Chentougang (Shiguanglu)
Island platform, doors open on the left
Platform 3  18  towards Xiancun (Nancun Wanbo / express: Modiesha)

Exits

Exit number Exit location
Exit A Qinghe Donglu
Exit C Qinghe Donglu
Exit D Qinghe Donglu

References

  1. Panyu Square
  2. "Introduction of Metro Line 3". Archived from the original on 2008-10-04. Retrieved 2008-12-16.
  3. Panyu Metro Stop

22.9357°N 113.3854°E / 22.9357; 113.3854

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.