Puerta de Arganda (Madrid Metro)
Puerta de Arganda [ˈpweɾta ðe aɾˈɣanda] is a station of the Metro Madrid. It is located in fare Zone A of the CRTM.[1]
Puerta de Arganda | ||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Madrid Metro station | ||||||||||||||||||||||||||||||||||||
General information | ||||||||||||||||||||||||||||||||||||
Location | Vicálvaro, Madrid Spain | |||||||||||||||||||||||||||||||||||
Coordinates | 40.4013157°N 3.5959768°W | |||||||||||||||||||||||||||||||||||
Owned by | CRTM | |||||||||||||||||||||||||||||||||||
Operated by | CRTM | |||||||||||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||
Fare zone | A | |||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||
Opened | 1 December 1998 | |||||||||||||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||
Location | ||||||||||||||||||||||||||||||||||||
Puerta de Arganda Location within Madrid |
Due to it being the southern endpoint of Line 9A, it serves as an interchange station to both Line 9B towards Rivas-Vaciamadrid and Arganda del Rey and via Vicálvaro railway station to the Cercanías service (lines C-2, C-7 and C-8. Connecting bus lines include 4, 71, 100, E3, T23 and the night line N7.[2]
The name of the above-ground Cercanías station is Vicálvaro instead of Puerta de Arganda, although there also is a distinct Metro Vicálvaro.
History
The underground metro station was opened to the public on 1 December 1998,[3] when line 9 was extended to the south, with the remaining section toward Arganda del Rey being inaugurated on 7 April 1999.[4]
During the first few years of operation, one out of every three or four trains from the old terminus Herrera Oria passed through Puerta de Arganda in the direction of Arganda del Rey, with the rest reversing their course, until the CRTM separated the line into two sections, the latter operated under concession by TFM.
The station has two platforms and two tracks with one platform located in the middle to ensure a smooth passage between trains of the two sections.
References
- "Línea 9". Metro de Madrid. Archived from the original on 2019-09-24. Retrieved 1 August 2019.
- "NAVEGAxMADRID". navegapormadrid.emtmadrid.es. Retrieved 1 August 2019.
- "ABC (Madrid) - 02/12/1998, p. 64 - ABC.es Hemeroteca". hemeroteca.abc.es. Retrieved 2 August 2019.
- Neira, Fernando; Zafra, Ángel (8 April 1999). "Arganda y Rivas toman la calle para recibir al primer metro interurbano" (in Spanish). El País. ISSN 1134-6582. Archived from the original on 31 August 2014. Retrieved 2 August 2019.
External links
Official page of Metro Madrid (in English) Map of the Metro network (in English)