Royd Moor Wind Farm

The Royd Moor Wind Farm is located at Penistone, Barnsley, South Yorkshire, England, and consists of thirteen 450 kW turbines. The site is located approximately 6 kilometres (3.7 mi) north west of Penistone, above the A628 trunk road between Barnsley and Manchester. The turbines are set in two parallel, staggered rows of six and seven,[1] on a ridge in hilly fell land lying 320 metres (1,050 ft) above sea level.

Royd Moor Wind Farm
CountryEngland
Location6 km west of Penistone, Barnsley South Yorkshire
Coordinates53°32′15″N 1°41′18″W
Commission date1993
Owner(s)E.ON
Power generation
Units operational13 AN Bonus 450/37 turbines
Nameplate capacity6 MW
External links
CommonsRelated media on Commons

These turbines were completed in 1993 and are 35 metres (115 ft) in height to the hub and have a rotor diameter of 37 metres (121 ft). The maximum output is 6 mW, equivalent to the annual energy required to power 3,300 homes.[2]

The original planning application was for a 25-year operation but an extension until the end of 2027 was granted in 2021.[3]

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.