Rublyovo-Arkhangelskaya line

Rublyovo-Arkhangelskaya line (Russian: Рублёво-Архангельская линия) or Line 17 of the Moscow Metro is currently under construction. It began in 2021 and will end after 2028, opening in two phases.[1][2] Phase 1 is scheduled to be completed by 2026-2027 completing the section from Delevoy Tsentr to Lipovaya Roscha station and phase two is scheduled to open after 2028 expanding the line from Lipovaya Roscha to Ilyinskaya station. In the future it will be connected with Biryulyovskaya line.[3]

Line 17 colored light brown in future Moscow Metro map
Rublyovo-Arkhangelskaya line
Overview
Native nameРублёво-Архангельская линия
LocaleMoscow
Stations10
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Technical
Line length18.7 kilometres (11.6 mi)
CharacterUnderground
Track gauge1,520 mm (4 ft 11+2732 in)
ElectrificationThird rail

Stations

English Russian Transfer Situation Opening
Ilyinskaya Ильинская Under Construction 2028+
Rublyovo-Arkhangelskoe Рыблево - Архангельское Under Construction 2028+
Lipovaya Roscha Липовая Роща Under Construction 2026-2027
Strogino Строгино Transfer for #3 Arbatsko-Pokrovskaya line at Strogino Strogino Under Construction 2026-2027
Zhivopisnaya Живописная Under Construction 2026-2027
Bulvar Karbysheva Бульвар Карбышева Under Construction 2026-2027
Karamyshevskaya Карамышевская Transfer for #11 Bolshaya Koltsevaya line at Narodnoye Opolcheniye Narodnoye Opolcheniye Under Construction 2026-2027
Zvenigorodskaya Звенигородская Under Construction 2026-2027
Shelepikha Шелепиха Transfer for #11 Bolshaya Koltsevaya line at Shelepikha Shelepikha Opened 2018
Delovoy Tsentr Деловой Центр Transfer for #11 Bolshaya Koltsevaya line at Delovoy Tsentr Delovoy Tsentr Opened 2018