Segamat railway station
The Segamat railway station is a Malaysian train station located at and named after the town of Segamat, Segamat District, Johor.
Segamat | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Inter-city rail station | ||||||||||||||||
General information | ||||||||||||||||
Location | Segamat, Segamat District Johor Malaysia | |||||||||||||||
Coordinates | 2.50698°N 102.81412°E | |||||||||||||||
Owned by | Railway Assets Corporation | |||||||||||||||
Operated by | Keretapi Tanah Melayu | |||||||||||||||
Line(s) | West Coast Line | |||||||||||||||
Platforms | 1 side platform (future: 2 side platforms) | |||||||||||||||
Tracks | 2 | |||||||||||||||
Connections | Local transportation | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated(Formerly at grade) | |||||||||||||||
Parking | Available, free. | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Status | Under renovation as part of double tracking and electrification project. The new station is already completed, but is not yet opened due to technical reasons. | |||||||||||||||
History | ||||||||||||||||
Opened | 1909 | |||||||||||||||
Opening | November 2023 (expected) | |||||||||||||||
Closed | 28 April 2021 (old station) | |||||||||||||||
Rebuilt | 1 June 2023 (completed, not yet opened) | |||||||||||||||
Electrified | Yes (partially; down line) | |||||||||||||||
Services | ||||||||||||||||
|
This station provides KTM Intercity train services. Adjacent to the railway station is the bus & taxi terminal.
History
The station was originally established in 1909. In 1924, the station building was reconstructed with a bigger building on the same place. This station ceased operations on 28 April 2021 and was temporarily replaced by the Segamat Temporary Railway Station located 3.7 km (2.3 mi) away. The old station will be demolished to make way for a new station to be constructed as part of the Gemas-Johor Bahru Double Tracking and Electrification Project.[1] As of October 2023, the new station is already completed, with KTMB currently testing the station's internal and external lighting, passenger announcement and information systems, as well as the station's signalling. However due to the relatively slow progress of the electrified double-tracking project at the moment, the new station's launching is expected to be delayed until 2024.However trains now can pass through the station.
Around the station
- Pejabat Penerangan Daerah Segamat
- Kilometre Zero (KM0) Monument of Segamat
- Segamat Roundabout
- Segamat Bus and Taxi Terminal and Bazaar
- Segamat Central Mall(Formerly UO)
References
- Zain, Nabilah (3 May 2021). "Operasi Stesen Keretapi Segamat Ditamatkan" [Segamat Railway Station Operation Ended]. Sintok News (in Malay). Retrieved 20 October 2021.