Shaktinagar Terminal–Tanakpur Express
Triveni Express is an Express train belonging to North Eastern Railway zone that runs between Shaktinagar Terminal and Tanakpur in India. It is currently being operated with 15075/15076 train numbers on four days in week basis.[1][2]
Overview | |
---|---|
Service type | Express |
Current operator(s) | North Eastern Railway zone |
Route | |
Termini | Shaktinagar Terminal (SKTN) Tanakpur (TPU) |
Stops | 39 |
Distance travelled | 860 km (534 mi) |
Average journey time | 24h 50m |
Service frequency | Four days [lower-alpha 1] |
Train number(s) | 15075/15076 |
On-board services | |
Class(es) | AC 2 tier, AC 3 tier, Sleeper class, General Unreserved |
Seating arrangements | No |
Sleeping arrangements | Yes |
Catering facilities | On-board catering E-catering |
Observation facilities | ICF coach |
Entertainment facilities | No |
Baggage facilities | No |
Technical | |
Rolling stock | 2 |
Track gauge | 1,676 mm (5 ft 6 in) |
Operating speed | 36 km/h (22 mph), including halts |
The name Triveni signifies the Triveni Sangam or the meeting pointing of three rivers of the Ganges, the Yamuna and the Saraswati at Prayag in Prayagraj which is a station on the train's route.
Service
The 24369/Triveni Express has an average speed of 36 km/h and covers 741 km in 20h 50m. The 24370/Triveni Express has an average speed of 37 km/h and covers 741 km in 19h 55m.
Route and halts
The important halts of the train are:
Coach composition
The train has standard ICF rakes with max speed of 110 kmph. The train consists of 15 coaches:
- 1 AC II Tier
- 1 AC III Tier
- 4 Sleeper Coaches
- 7 General
- 2 Seating cum Luggage Rake
Traction
Both trains are hauled by a Lucknow Loco Shed-based WDM-3A or WDP-4 diesel locomotive from Shaktinagar to Bareilly and vice versa.
Rake sharing
The train shares its rake with 14369/14370 Triveni Express
See also
Notes
- Runs four days in a week for every direction. Departs @ 15:25 SKTN/Shaktinagar Platform# 1 SUNDAY, MONDAY, WEDNESDAY, FRIDAY Arrives @ 16:15 +1 night TPU/Tanakpur Platform# 1 MONDAY, TUESDAY, THURSDAY, SATURDAY
References
- "Pushpak Express delayed by 23 hours". The Times of India. 24 June 2015. Retrieved 27 September 2018.
- Triveni will now run two hours ago