Sherborne railway station

Sherborne railway station serves the town of Sherborne in Dorset, England. It is situated on the West of England Main Line, 118 miles 4 chains (190.0 km) down the line from London Waterloo and is currently operated by South Western Railway.

Sherborne
National Rail
General information
LocationSherborne, Dorset
England
Coordinates50.944°N 2.513°W / 50.944; -2.513
Grid referenceST640161
Managed bySouth Western Railway
Platforms2
Other information
Station codeSHE
ClassificationDfT category D
History
Original companySalisbury and Yeovil Railway
Pre-groupingLondon and South Western Railway
Post-groupingSouthern Railway
Key dates
1860Opened
Passengers
2017/18Decrease 0.222 million
2018/19Decrease 0.210 million
2019/20Decrease 0.195 million
2020/21Decrease 36,452
2021/22Increase 0.131 million
Notes
Passenger statistics from the Office of Rail and Road

History

The station was opened by the Salisbury and Yeovil Railway (S&YR) on 7 May 1860, when the company extended its line from Gillingham to Sherborne. A level crossing across the line was at the east end of the platforms, and the goods yard with a goods shed at the west end; this and the main buildings were on the north side of the line to be nearer the town. Another siding on the other side of the line served the town’s gas works which had been established in 1836. A signal box was erected on the east side of the level crossing and to the south of the line in 1875.[1]

The level crossing with the disused signal box beyond.

The S&YR never operated any trains, instead they were provided by the London and South Western Railway, which bought out the S&YR in 1878. In 1923 this became part of the Southern Railway, which in turn was nationalised in 1948 to become the Southern Region of British Railways.

In 1960 the signal box was replaced by a new one on the opposite side of the line, but after this a decline set in. From 1963 the line was transferred to the Western Region, and in that year the Reshaping of British Railways report was published. The smaller stations were soon closed, and most trains beyond Exeter St Davids were diverted to other routes. The gas works had stopped receiving coal in 1957 and all goods traffic was stopped from 18 April 1966. On 7 May 1967[1] the 21 miles (34 km)[2] to Chard Junction was reduced to single track, but this proved a mistake and the double track was restored as far as Yeovil Junction on 1 October. The signal box was closed on 4 January 1970 when the level crossing was converted to lifting barriers which were for many years controlled by a member of staff from a panel at the end of the eastbound platform.[1] In March 2012 a modern signalling system for the Salisbury-Exeter line was commissioned and the line, including crossings, is now controlled remotely by the Basingstoke Rail Operating Centre.[3] Remote control of the crossing eliminated the need for constant staff presence at the station during train operating hours, allowing South West Trains to reduce the hours of ticket office staffing.[4]

Preceding station Historical railways Following station
Milborne Port   London and South Western Railway
London Waterloo to Devon and Cornwall
  Yeovil Junction
  London and South Western Railway
Salisbury to Yeovil
  Yeovil Town

Platform layout

The entrance and offices are on the northern platform which is served by trains going towards London. A large canopy covers much of the other platform. This is normally reached by crossing a footbridge, but people who find this difficult to use can cross the track under the supervision of the signaller who operates the level crossing. The old signal box still stands on the other side of this, and at the other end of the station can be seen the old goods shed.[1]

The station buffet appeared in a list of "highly commended" station cafes published in The Guardian in 2009.[5]

Services

An Exeter to London train

South Western Railway operate hourly throughout most of the week between Exeter St Davids, Sherborne, Salisbury and London Waterloo station. Services are timetabled to pass at Sherborne but the double track provides some flexibility should one of them be running late.[6]

Preceding station National Rail National Rail Following station
Templecombe   South Western Railway
West of England Main Line
  Yeovil Junction

See also

References

  1. Phillips, Derek; Pryer, George (1997). The Salisbury to Exeter Line. Sparkford: Oxford Publishing Company. ISBN 0-86093-525-6.
  2. Jacobs, Gerald (2005). Railway Track Diagrams Book 3: Western. Bradford-on-Avon: Trackmaps. ISBN 0-9549866-1-X.
  3. "Invensys Rail Awarded Salisbury to Exeter Signalling Recontrol Contract". 25 May 2011. Archived from the original on 26 January 2013. Retrieved 27 April 2012.
  4. "Sherborne railway station ticket office cuts 'could compromise passenger safety' | This is Dorset". www.thisisdorset.co.uk. Archived from the original on 5 May 2013. Retrieved 6 June 2022.
  5. Wills, Dixe (12 May 2009). "Ten of the best railway cafes". Guardian. Archived from the original on 15 May 2009. Retrieved 30 June 2009.
  6. "Table 160: London to Salisbury and Exeter" (PDF). Electronic National Rail Timetable. Network Rail. December 2009. Retrieved 14 December 2009.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.