Soekarno–Hatta Airport Skytrain
The Soekarno–Hatta Airport Skytrain (Indonesian: Kalayang Bandara Soekarno–Hatta) is a semi-driverless 3.05 kilometre Automated People Mover System (APMS) which connects Soekarno-Hatta Airport Terminals 1, 2, 3 and SHIA railway station, free of charge.[1] Trains are spaced 5 minutes apart, with 7 minutes needed to get from Terminal 1 to Terminal 3.[2][3]
Soekarno–Hatta Airport Skytrain | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | Kalayang Bandara Internasional Soekarno-Hatta | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Angkasa Pura II | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Soekarno–Hatta International Airport serving Jakarta | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Automated people mover (APM) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Angkasa Pura II | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Woojin Automated People Mover System | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 17 September 2017[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 3.05 km (1.90 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Third rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Rolling stock
The system uses Airport Automated People Mover System rubber-tyred metro manufactured by state-owned enterprise PT LEN Industri in cooperation with South Korean Woojin Industries.[4] Three train units operate with each train unit consisting of two cars. They are capable to transport 176 passengers in one trip. The train travels at a speed of 60 kilometers per hour. Each trainset is equipped with automated guide-way transit (AGT) technology. The system is capable for automated operations, but its implementation have been delayed pending trials conducted by LEN Industri.
Stations
There are 4 stations served by Airport Skytrain; Terminal 1, 2 and 3 each has one station. The airport shuttle Skytrain is integrated to SHIA railway station, from where passengers can conveniently travel to–and from–Jakarta city center by Soekarno–Hatta Airport Rail Link.
Skytrain operating schedule is accessible online and through the Indonesia Airport website and smartphone application, the time was variable . All Skytrain stations are equipped with platform screen doors and have information screens displaying real-time arrival time of the next train. Skytrain has been operational since 17 September 2017.[5]
Station | Transfer/Notes |
---|---|
Terminal 3 | Terminal station
Terminal 3 Airport Bus Terminal |
Terminal 2 | Soekarno-Hatta Terminal 2
Terminal 2 Airport Bus Terminal |
Integrated Building | SHIA |
Terminal 1 | Terminal Station |
Future expansion
The Skytrain will be extended to planned new Terminal 4 and Sky Hub (commercial area) in Phase 2. Then it will be connected to Integrated Building Terminal, Terminal 1, 2 and 3.[6]
References
- "Soekarno–Hatta International Airport Skytrain is officially launched". The Jakarta Post. Retrieved 2018-05-04.
- "Skytrain Trials at Soekarno Hatta Airport to Begin in Mid August". Tempo. Retrieved 30 August 2017.
- "Skytrain to connect terminals at Soekarno–Hatta Airport". The Jakarta Post. Retrieved 30 August 2017.
- "Airport skytrain to be operated by crew for first six months". The Jakarta Post. Retrieved 2018-05-04.
- "Skytrain to link with Dukuh Atas in December". The Jakarta Post. Retrieved 18 September 2017.
- "Soekarno-Hatta Airport Airport Train officially operated for public". angkasapura2.co.id. Retrieved 29 December 2017.