Spain-Morocco interconnection
Spain-Morocco interconnection is a submarine power cable between Tarifa terminal in Spain and Fardioua terminal in Morocco. The purpose of the cable is to connect energy infrastructure between Europe and Africa.[1][2]
Spain-Morocco interconnection | |
---|---|
Location | |
Country | Spain, Morocco |
General direction | north–south |
From | Tarifa |
Passes through | Strait of Gibraltar |
To | Fardioua |
Ownership information | |
Partners | Morocco’s National Office of Electricity, Red Eléctrica de España |
Construction information | |
Commissioned | 1997 |
Technical information | |
Type | subsea cable |
Type of current | AC |
Total length | 59 km (37 mi) |
Power rating | 800 MW |
AC voltage | 400 kV |
The Spain-Morocco interconnection includes two 400 kV lines, commissioned in 1997 and 2006 that have a combined power of 800 MW and consisting of seven cables: three for each circuit, plus one for reserve.[3]
Expansion
The two countries are planning to extend the network building a third 400-kV link with a 700 MW capacity. The cost of the project is expected to be $169 million, shared equally between Spain and Morocco.[1][4]