USS Gemini (PHM-6)
USS Gemini (PHM-6) was the final ship of her class of hydrofoils operated by the U.S. Navy. She was named for the constellation.
USS Gemini during exercise UNITAS 85 | |
History | |
---|---|
United States | |
Name | USS Gemini |
Namesake | Gemini |
Awarded | 20 October 1977 |
Builder | Boeing Marine Systems, Renton, Washington |
Laid down | 13 May 1980 |
Launched | 17 February 1982 |
Commissioned | 13 November 1982 |
Decommissioned | 30 July 1993 |
Motto | Done Swiftly, Done Well |
Fate | Sold for scrapping, 19 August 1996. Later converted into a yacht but was scrapped. |
General characteristics | |
Class and type | Pegasus-class hydrofoil |
Displacement | 255 long tons (259 t) full |
Length | 133 ft (41 m) |
Beam | 28 ft (8.5 m) |
Propulsion |
|
Speed |
|
Complement | 4 officers, 17 enlisted |
Sensors and processing systems |
|
Armament |
|
Pegasus class vessels were designed for high speed and mobility, and carried an armament powerful for its size, consisting of Harpoon anti-ship missiles and a 76 mm cannon.
USS Gemini was converted into a yacht after decommissioning, but was later sold for scrap.[1]
References
- "USS Gemini, yacht on Cape Fear, sold for scrap metal". StarNews Online. Retrieved 1 July 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.