Uwada Dam
Uwada Dam is a gravity dam on the Tadami River 500 m (1,640 ft) downstream of Kaneyama in the Fukushima Prefecture of Japan. It was constructed between 1952 and 1954 for the purpose of hydroelectric power generation. It supplies a 63.9 MW power station with water.[1]
Uwada Dam | |
---|---|
Location of Uwada Dam in Japan | |
Country | Japan |
Location | Kaneyama |
Coordinates | 37°28′59″N 139°32′14″E |
Construction began | 1952 |
Opening date | 1954 |
Owner(s) | Tohoku Electric Power |
Dam and spillways | |
Impounds | Tadami River |
Height | 34 m (112 ft) |
Length | 283 m (928 ft) |
Dam volume | 23,000 m3 (30,083 cu yd) |
Spillway type | 5 x roller gates |
Reservoir | |
Total capacity | 20,500,000 m3 (16,620 acre⋅ft) |
Active capacity | 4,426,000 m3 (3,588 acre⋅ft) |
Catchment area | 2,402 km2 (927 sq mi) |
Surface area | 1.52 km2 (376 acres) |
Power Station | |
Commission date | March 1954 |
Hydraulic head | 26.3 m (86 ft) |
Turbines | 3 x 21.3 MW Kaplan-type |
Installed capacity | 63.9 MW |
References
- "Tohoku Electric Power Plant Uwada" (in Japanese). Suiryoku. Retrieved 27 August 2011.
Wikimedia Commons has media related to Dams in Fukushima prefecture.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.