Vojany Power Station

Vojany Power Station is a thermal power station at Vojany, Slovakia. It consists of 12 units, with 110 MW generation capacity each. Planning of the first plant began in 1959, the project was approved in 1960, and construction began in 1961. It was commissioned in 1966. The second plant was approved in 1966, construction started in 1968, and it was commissioned in 1973–1974.[1][2]

Vojany Power Station
Location of the Vojany Power Station
Official nameElektráreň Vojany
CountrySlovakia
LocationVojany
Coordinates48°33′13″N 21°58′41″E
StatusOperational
Construction began1961
Commission date1966
Owner(s)Slovenské elektrárne
Operator(s)
Thermal power station
Primary fuelCoal
Secondary fuelNatural gas
Tertiary fuelFuel oil
Power generation
Units operational12 x 110 MW
Make and modelŠkoda
Nameplate capacity1,320 MW
External links
CommonsRelated media on Commons

The first plant was designed to use semi-anthracite coal imported from Ukraine by a purpose-built wide-gauge rail line. Cooling water is supplied from the Zemplínska Šírava reservoir.[1][2] Its flue gas stack is 200 metres (656 ft) tall.

The second plant uses heavy fuel oil. Between 1979 and 1985 it was modernized to use also natural gas.[2] Its flue gas stack, which was completed in 1974, was originally 300 metres (984 ft) tall. In 1998, its height was reduced to 175 metres (574 ft).[3]

References