Airbus A220

The Airbus A220 is a family of five-abreast narrow-body airliners by Airbus Canada Limited Partnership. It was originally designed by Bombardier and had two years in service as the Bombardier CSeries. The program was launched on 13 July 2008, the smaller A220-100 (formerly CS100) made its maiden flight on 16 September 2013, was awarded an initial type certification by Transport Canada on 18 December 2015, and entered service on 15 July 2016 with launch operator Swiss Global Air Lines. The longer A220-300 (formerly CS300) first flew on 27 February 2015, received an initial type certification on 11 July 2016, and entered service with airBaltic on 14 December 2016.

A220
CSeries CS100 and CS300
An A220-300, the most common variant, of AirBaltic, its launch operator
Role Narrow-body airliner
National origin Multinational
Manufacturer Airbus Canada Limited Partnership
Designer Bombardier Aviation
First flight 16 September 2013[1]
Introduction 15 July 2016 with Swiss International Air Lines[2]
Status In service
Primary users Delta Air Lines
airBaltic
Air Canada
Swiss International Air Lines
Produced 2012–present
Number built 227 as of 30 September 2022[3]

Powered by Pratt & Whitney PW1500G geared turbofan engines under its wings, the twinjet features fly-by-wire flight controls, a carbon composite wing, an aluminium-lithium fuselage and optimised aerodynamics for better fuel efficiency. The aircraft family offers maximum take-off weights from 63.1 to 70.9 t (139,000 to 156,000 lb), and cover a 6,390–6,670 km (3,450–3,600 nmi) range. Both launch operators recorded better-than-expected fuel burn and dispatch reliability, as well as positive feedback from passengers and crew. As of August 2022, the global A220 fleet had completed more than 650,000 flights over one million block hours without accidents.

The 35 m (115 ft) long A220-100 seats 108 to 133, while the 38.7 m (127 ft) long A220-300 seats 130 to 160. The ACJ TwoTwenty is the business jet version of the A220-100, launched in late 2020. As of September 2022, a total of 773 A220s had been ordered of which 227 had been delivered and were all in commercial service with 15 operators. Delta Air Lines is the largest operator with 57 aircraft in its fleet.

The A220 family complements the A319neo in the Airbus range and competes with the largest variants of the Embraer E-Jet E2 family and the smaller Boeing 737 MAX-7 variant. In July 2018, the aircraft was rebranded as the A220 after Airbus acquired a 50.01% stake in the program through a joint venture established in 2016. In August 2019, a second final assembly line opened at Airbus Mobile in Alabama, supplementing the main facility in Mirabel, Quebec. In February 2020, Airbus increased its share to 75% as Bombardier exited the program, while the Quebec government's Investissement Québec held the 25% balance.

Development

BRJ-X forerunner concept

BRJ-X concept

Fokker was the manufacturer of the 100-seat Fokker 100 short-haul aircraft.[4] On 5 February 1996, Bombardier began discussions with Fokker about acquiring that company's assets, but after evaluating the potential purchase, Bombardier announced an end to the talks on 27 February.[5] On 15 March, Fokker was declared bankrupt.[6]

On 8 September 1998, Bombardier then launched the BRJ-X, or "Bombardier Regional Jet eXpansion", a larger regional jet than the Canadair Regional Jet due to enter service in 2003. Instead of 2–2 seating, the BRJ-X was to have a wider fuselage with 2–3 seating for 85 to 110 passengers, and underwing engine pods.[7] It was abutting the smallest narrow-body jetliners, like the 2–3 DC-9/MD-80/Boeing 717 or the 3–3 Airbus A318 and Boeing 737-500/737-600. At the end of 2000, the project was shelved by Bombardier in favour of stretching the CRJ700 into the CRJ900.[8]

Meanwhile, Embraer launched its four-abreast, under-wing powered E-jets for 70 to 122 passengers at the Paris Air Show in June 1999, which made its maiden flight in February 2002 and was introduced in 2004. Airbus launched its 107–117 passengers A318 shrink on 21 April 1999,[7] which made its first flight in January 2002, as Boeing had the 737-600 first delivered in September 1998.

CSeries feasibility study

CSeries feasibility study was launched at 2004 Farnborough Airshow; the 3 view shows lateral comparison of C110 (CS100) to C130 (CS300).

Bombardier appointed Gary Scott on 8 March 2004 to evaluate the creation of a New Commercial Aircraft Program.[9] Bombardier launched a feasibility study for a five-seat abreast CSeries at Farnborough Airshow in July 2004 to investigate development of an aircraft to replace rival manufacturers' aging DC-9/MD-80, Fokker 100, Boeing 737 Classic and BAe-146 with 20% lower operating costs, and 15% lower than aircraft produced at the time. The smaller version should carry 110 to 115 passengers and the larger 130 to 135 passengers over 3,200 nautical miles.[10]

Bombardier's Board of Directors authorized marketing the CSeries on 15 March 2005, seeking firm commitments from potential customers, suppliers and government partners prior to program launch. The C110 was planned to weigh 60,420 kg (133,200 lb) at MTOW and have a length of 35.0 m (114.7 ft), while the C130 should be 38.2 m (125.3 ft) long and have a 66,000 kg (146,000 lb) MTOW. The aircraft would have 3-by-2 standard seating and 4-abreast business class, 2.1 m (7 ft) stand-up headroom, fly-by-wire and side stick controls. 20 percent of the airframe weight would be in composite materials for the centre and rear fuselages, tail cone, empennage and wings. The first flight was planned for 2008 and entry into service for 2010.[11]

In May 2005, the CSeries development was evaluated at US$2.1 billion, shared with suppliers and partner governments for one-third each. The Government of Canada would invest US$262.5 million, the Government of Quebec US$87.5 million and the Government of the United Kingdom US$340 million (£180 million), repayable on a royalty basis per aircraft.[12] The UK contribution is part of an investment partnership for the location of the development of the wings, engine nacelles and composite empennage structures at the Belfast plant,[13] where Bombardier bought Short Brothers in 1989.

On 31 January 2006, Bombardier announced that market conditions could not justify the launch of the program, and that the company would reorient CSeries project efforts, team and resources to regional jet and turboprop aircraft. A small team of employees were kept to develop the CSeries business plan and were further tasked to include other risk-sharing partners in the program.[14]

On 31 January 2007, Bombardier announced that work on the aircraft would continue, with entry into service planned for 2013.[15] In November 2007, Bombardier selected the Pratt & Whitney Geared Turbofan, now the PW1500G, already selected to power the Mitsubishi Regional Jet, to be the exclusive powerplant for the CSeries, rated at 100 kN (23,000 lbf).[16]

Program launch

CSeries display model, presented during the 2008 Farnborough Airshow

On 22 February 2008, Bombardier's Board of Directors authorized offering formal sales proposals of the CSeries to airline customers, on the strength of its 20% better fuel burn and up to 15% better cash operating costs compared to similarly sized aircraft produced at the time. This interested Lufthansa, Qatar Airways and ILFC.[17]

On 13 July 2008, in a press conference on the eve of the opening of the Farnborough Airshow, Bombardier Aerospace formally launched the CSeries, with a letter of interest from Lufthansa for 60 aircraft, including 30 options, at a US$46.7 million list price. The aircraft fuel efficiency would be 2 litres per 100 kilometres (120 mpgUS) per passenger in a dense seating. The final assembly of the aircraft would be done in Mirabel, wings would be developed and manufactured in Belfast and the aft fuselage and cockpit would be manufactured in Saint-Laurent, Quebec.[18] The center fuselage was to be built by China Aviation Industry Corporation (AVIC)'s affiliate Shenyang Aircraft Corporation.[19][20] Bombardier estimated the market for the 100- to 149-seat market segment of the CSeries to be 6,300 units over 20 years, representing more than $250 billion revenue over the next 20 years; the company expects to capture up to half of this market.[19]

Prototype manufacturing

CSeries' first Flight Test Vehicle (FTV1), a CS100, out of the factory in Mirabel in June 2013

In March 2009, Bombardier redesignated the C110 and C130 as CS100 and CS300, respectively. The models were offered in standard- and extended-range (ER) variants; and additionally, an extra thrust (XT) variant of the CS300 was also offered.[21] Bombardier subsequently settled on a single variant, with extended range becoming the new standard.[22] By November, the first wing had been assembled at the Bombardier Aerostructures and Engineering Services (BAES) site in Belfast, Northern Ireland, while the program grew to about $3.5 billion, shared with suppliers and governments.[23] In the same month, construction of a composite wing manufacturing facility at the Belfast site started[24] and the first flight of the CSeries was expected by 2012.[25]

In March 2009, Bombardier confirmed major suppliers: Alenia Aeronautica for the composite horizontal and vertical stabilisers, Fokker Elmo for the wiring and interconnection systems and Goodrich Corporation Actuation Systems: design and production of the flap and slat actuation systems.[26] By June 2009, 96% of billable materials had been allocated, with the company settling on various companies for remaining components and systems: Shenyang Aircraft Corporation for the centre fuselage; Zodiac Aerospace for the interiors, and United Technologies Corporation for the engine nacelles,[27] Liebherr for the landing gear and pneumatics; UTC Aerospace for the electrical system and lighting; Goodrich for the nacelle; Meggitt for the wheels and brakes; Michelin for the tires; Spirit for the pylons; Honeywell for the APU; and PPG supplies the windows.[28] In 2010, Ghafari Associates was retained to develop the Montreal manufacturing site to accommodate the aircraft production.[29]

The CSeries competed with the smaller variants of the A320 family aircraft. Airbus opted to compete aggressively against the CSeries rather than ignoring it, as Boeing had done with Airbus.[30] Airbus dropped the A320's price in head-to-head competition, successfully blocking Bombardier from several deals.[30] The 2010 order for 40 CS300s and 40 options from Republic Airways Holdings  then owner of exclusive A319/320 operator Frontier Airlines  also pushed Airbus into the A320neo re-engine.[30]

In January 2010, Bombardier was about to reach the design freeze for the CSeries and announced that CS100 deliveries were planned to start in 2013, and CS300 deliveries would follow a year later.[31] In November 2011, Bombardier expected a second-half 2012 first flight as it was to receive the first fuselage package until mid-2012 at the earliest and Pratt & Whitney still had "a little bit more work to do" to meet the requirement.[32] In June 2012, Bombardier reaffirmed the first flight should happen before the year's end with subsequent entry into service remaining 2013.[33] In November, Bombardier said that some areas of the program were late due to unspecified supplier issues, and announced a delay of six months to both the first flight to June 2013 and entry into service of the CS100 one year later.[34]

An extensive program update was presented on 7 March 2013; the first "flight test vehicle" (FTV) was displayed in a near-complete state, along with three other FTVs in various states of assembly: one such FTV confirmed the 160 seat "Extra Capacity" version of the CS300, featuring two sets of over-wing emergency exits.[35] The first FTV's electrical system was powered up in March, while tests on the static airframe proceeded satisfactorily and on schedule.[36] In June, Bombardier again delayed the first flight into July on account of software upgrades and final ground testing.[37] On 24 July, after a protracted system integration process, the first flight was delayed into "the coming weeks".[38] On 30 August, Bombardier received the flight test permit from Transport Canada, granting permission to perform high speed taxi testing and flight testing.[1]

Flight testing

The first CS100 takeoff on 16 September 2013

On 16 September 2013, the CS100 made its maiden flight from Mirabel Airport.[39][40] Over 14,000 data points were gathered on this flight; after reconfiguration and software upgrades, FTV1 flew for the second time on 1 October.[41] On 16 January 2014, the planned entry-into-service date was delayed into the second half of 2015 due to certification testing issues; the CS300 remained set to follow approximately six months after the CS100.[42]

On 29 May 2014, one of the four FTVs suffered an uncontained engine failure. Consequently, flight testing was suspended until an investigation could be completed.[43] The incident kept Bombardier from displaying the CSeries at one of the most important aerospace events in that year, the biennial Farnborough Airshow.[44] In August, Bombardier changed the program's management and slashed its workforce.[45] On 7 September, flight testing was resumed after the engine problem had been isolated to a fault in the lubrication system.[46] Bombardier chairman Laurent Beaudoin stated that the CSeries was then expected to be in service in 2016.[47] Delays resulted in order cancellations, including from the Swedish lessor.[48]

The CS300 first flight on 27 February 2015

By 20 February 2015, the FTVs had accumulated over 1,000 flight hours.[49] Seven days later, the CS300 prototype took off for its maiden flight from Bombardier's facility at Montreal Mirabel International airport in Quebec.[50] Test flight results surpassed the company's guarantees for noise, economics and performance, meaning a longer range than advertised could be possible.[51] The fifth CS100 first flew on 18 March.[52] On 27 March, Bombardier confirmed that Canadian certification for the CS100 should come in late 2015 with entry into service in 2016.[53]

At the 2015 Paris Air Show, Bombardier released updated performance data, showing improvements over the initial specifications.[54] On 20 August, Bombardier disclosed that the CS100 had completed over 80% of the required certification tests.[55] On 14 October, the company had completed over 90% of required tests for the CS100. Accordingly, Bombardier announced that the first production CS100 would soon commence function and reliability tests.[56] The CS100 completed its certification testing program in mid-November.[57] On 25 November, Bombardier completed the first phase of its route proving capabilities, with a 100% dispatch reliability.[58] The final prototype, FTV8, the second CS300 with a complete interior, made its first flight on 3 March 2016.[59]

Government support

In 2015 Bombardier offered to sell a majority stake in the CSeries programme to Airbus. In October 2015, Airbus confirmed that it had turned down Bombardier's offer. Bombardier said it would explore alternatives. Just days prior, the Government of Quebec reiterated its willingness to provide Bombardier with financial aid, if it were requested.[60][61][62] Bombardier stated its commitment to the CSeries and that it had the financial resources to support it.[63] On 29 October, Bombardier took a CA$3.2 billion write-down on the CSeries. The Trudeau government indicated that it would reply to Bombardier's request for $350 million in assistance after it took power in early November.[64] On the same day, the Quebec government invested CA$1 billion in the company to save the struggling programme.[65] In early November, a Scotiabank report indicated that the company and the programme would probably need a second bailout, and that even then the CSeries would probably not make money.[66]

In April 2016, Bombardier reportedly requested a CA$1 billion aid package from the Canadian Government.[67] The Government then offered an aid package without divulging the amount or conditions imposed, though some media reported that the company initially rejected the offer.[68] In February 2017, the Government finally announced a package of CA$372.5 million in interest-free loans for the company, with the programme to receive one-third.[69] By July 2016, Bombardier Aerospace set up the C Series Aircraft Limited Partnership (CSALP) together with Investissement Québec.[70]

Certification

The smallest model in the series, the 110- to 125-seat CS100, received type certification from Transport Canada on 18 December 2015,[71] and simultaneously from US Federal Aviation Administration (FAA) and European Aviation Safety Agency (EASA) in June 2016, clearing the way for delivery to the launch operator, Swiss International Air Lines, by the end of the month.[72] At the time of CS100 certification by Transport Canada in December 2015, the CSeries had 250 firm orders and letters of intent, plus commitments for another 360; most of these were for the CS300 model, which was expected to be certified by the summer of 2016.[73][74] The largest model, the 130- to 145-seat CS300, obtained its type certificate from Transport Canada on 11 July 2016,[75] from the EASA on 7 October that cleared the delivery to its launch customer airBaltic by November 2016,[76] and from the FAA on 14 December 2016.[77] Both models were awarded a common type rating on 23 November 2016 simultaneously from Transport Canada and EASA, allowing pilots to qualify on both types interchangeably.[78]

In March 2017, Bombardier conducted steep 5.5˚ approach landings tests at London City Airport (LCY),[79] and announced one month later, April 2017, that the CS100 received Transport Canada and EASA steep approach certification.[80]

In July 2018, after the acquisition by Airbus, the aircraft was rebranded A220. In December 2018, the EASA approved Category IIIa/IIIb instrument approaches for autoland with no decision height but runway visibility minimum requirements.[81]

In January 2019, A220 powered with PW1500G gained ETOPS 180 approval from Transport Canada, allowing direct routes over water or remote regions.[82][83] The A220 was the first commercial airliner to obtain domestic ETOPS certification from Transport Canada.[84]

In July 2021, the EASA had officially approved an increase in the A220-300's maximum seating to 149 passengers, subject to a modification on an overwing exit slide.[85] In September 2021, Airbus entered into talks with the Civil Aviation Administration (CAA) of China over the certification of the A220 in order to enter the large Chinese aviation market, particularly in the western part of the country.[86]

Production

In 2016, Bombardier achieved its goal of delivering seven CSeries aircraft to both launch operators, Swiss and airBaltic.[87][88] Production was then set to ramp to 30–35 aircraft deliveries in 2017 after PW1500G engine supply and start issues were resolved.[89] However, the CSeries delivery goal for 2017 had to be revised to 20–22 aircraft only, due to persistent engine delivery delays,[90] and finally, only 17 deliveries were completed in the year.[91] At the programme launch, Bombardier had forecast 315 annual deliveries from 2008 to 2027 for 100- to 150-seat airliners, but in the first 10.5 years, the six models available (B737-700, A318/A319, CS100/CS300 and E195) averaged fewer than 80 per year.[92] A total of 37 CSeries had been delivered before the Airbus partnership took effect on 1 July 2018 and the aircraft was rebranded A220.[88]

It was intended that the programme team would be formed by leaders from both Bombardier and Airbus and headed by Philippe Balducchi, then Head of Performance Management at Airbus Commercial Aircraft.[93] Ten days after programme control was transferred to Airbus, the aircraft was rebranded as the A220-100/300.[94] Later, on 1 June 2019, the CSALP joint venture was renamed to Airbus Canada Limited Partnership and adopted the Airbus logo as its sole visual identity.[95]

Airbus targeted over 100 orders of A220 in 2018 and 3,000 over 20 years, half of the 100- to 150-seat market, and needed a supply chain cost reduction over 10%.[96] Airbus then sought to reduce costs from all suppliers, including Bombardier, wing builder Short Brothers and engine manufacturer Pratt & Whitney. It has reportedly pushed its suppliers to lower their prices by 20% for more volume, or to switch them, towards 150 yearly deliveries.[97] Supplier costs could be cut by 30–40% by Airbus's market power, as a 10% procurement costs decrease would add six gross margin points to the programme.[98] Airbus waited to win several new orders before increasing pressure on suppliers and catching their attention in 2019 with the sale of 135 A220s to U.S. airlines, including a follow-up order from Delta.[99]

Deliveries from Airbus in Mobile, Alabama started in 2020.

In mid-2018, Airbus CFO predicted a production potential of more than 100 A220 per year.[100] Delivery rates continued to climb with the new brand, reaching a total output of 33 in 2018, and then rising to 48 A220 in 2019.[101] The market share was split between 80% A220-300 (former CS300) and 20% A220-100 (former CS100).[102]

The groundbreaking ceremony for the $300 million final assembly line in Mobile, Alabama was held on 16 January 2019;[103] on this occasion Airbus confirmed its confidence that there is enough demand to justify two assembly sites and that the airliner can be profitable.[104] On 5 August 2019, production started at Mobile facility,[105] which was not due to be finished until 2020, but work started early to ensure that the first delivery schedule can be met.[106][107]

The removal of Bombardier's financial constraints in February 2020 gave Airbus greater latitude for further investment in the programme,[108] which will be needed to ramp up production rates, though this will push back the break-even point of the programme to the mid-2020s.[109] The program cost was US$ 7 billion.[110] On 2 June 2020, the first A220 produced in Alabama completed its first flight. By that date, production of the first aircraft for JetBlue Airways had also started.[111] The first US-assembled A220 aircraft, an A220-300, was delivered to Delta on 22 October 2020.[112]

In January 2021, as Airbus reviewed its production rates following a shift in demand away from wide-bodies affected by the COVID-19 pandemic, the A220 was expected to reach a production rate of 5 aircraft per month by the end of the first quarter as previously foreseen.[113][114] In May 2021, Airbus targeted a production rate of six per month from early 2022, and intends to reach 14 (10 in Mirabel and 4 in Alabama) per month by the middle of the decade to be profitable.[99][115]

Boeing dumping petition

The CSeries CS100 demonstrated for Delta Air Lines in Atlanta

On 28 April 2016, Bombardier Aerospace recorded a firm order from Delta Air Lines for 75 CSeries CS100s plus 50 options. On 27 April 2017, Boeing filed a petition for dumping them at $19.6m each, below their $33.2m production cost.

On 9 June 2017, the US International Trade Commission (USITC) found that the US industry could be threatened. On 26 September, the US Department of Commerce (DoC) observed subsidies of 220% and intended to collect deposits accordingly, plus a preliminary 80% anti-dumping duty, resulting in a duty of 300%. The DoC announced its final ruling, a total duty of 292%, on 20 December. On 10 January 2018, the Canadian government filed a complaint at the World Trade Organization against the US.

On 26 January 2018, the four USITC commissioners unanimously determined that US industry is not threatened and no duty orders will be issued, overturning the imposed duties. The Commission public report was made available by February 2018. On March 22, Boeing declined to appeal the ruling. While the USITC had determined there was no threat, the ruling came too late for Bombardier, as the dumping petition by Boeing had already paved the way for Bombardier to relinquish a controlling interest in the CSeries to Airbus in October 2017.

Airbus partnership

The stiff competition, slow business and ultimately the dumping petition by Boeing paved the way for Bombardier to close a partnership with Airbus in October 2017.[30] Bombardier CEO predicted that the partnership would significantly accelerate sales as it would bring certainty to the CSeries programme and increase the level of confidence through the Airbus's global scale, which would take the programme to new heights.[116]

On 16 October 2017, Airbus and Bombardier announced that Airbus would acquire a 50.01% majority stake in the CSALP partnership, with Bombardier keeping 31% and Investissement Québec 19%, to expand in an estimated market of more than 6,000 new 100- to 150-seat aircraft over 20 years.[117] Airbus did not pay for its share in the programme, nor did it assume any debt.[118][119] Its supply chain expertise should save production costs but headquarters and assembly remain in Québec while U.S. customers would benefit from a second assembly line in Mobile, Alabama.[117] This transaction was subject to regulatory approvals then expected to be completed in 2018.[117] While assembling the aircraft in U.S. could circumvent the 292% duties proposed in the dumping petition by Boeing, Airbus CEO Tom Enders and Bombardier CEO Alain Bellemare assured that this factor did not drive the partnership, but negotiations began in August 2017 after the April filing and the June decision to proceed and, as a result, Boeing was suspicious.[119] Leahy considered that Boeing indirectly forced the CSeries programme into Airbus hands by pressing the U.S. administration for massive tariffs on the aircraft.[30]

Airbus insisted that it had no plan to buy out Bombardier's stake in the program and that Bombardier would remain a strategic partner after 2025, however clauses allowed it to buy out Investissement Quebec's share in 2023 and Bombardier's 7 years after the deal closes, though production is required to remain in Quebec until at least 2041.[120] AirInsight anticipated that the CSeries market share of the 100- to 149-seat market over 20 years will increase from 40% of 5,636 aircraft (2254 sales) to 55–60%, around 3,010 aircraft, through Airbus' corporate strength.[121] It was later planned to rebrand the CSeries as an Airbus model, with A200 suggested as a family name and A210/A230 for the CS100 and CS300.[122]

In November 2017, Embraer assured at the Dubai Airshow that it would monitor Airbus involvement until antitrust immunity was granted, for dumping pricing after, and that Brazil would sue Canada for its subsidies to Bombardier through the World Trade Organization.[123] Embraer also believed supply chain costs could not be reduced enough to make the CSeries profitable, viewing it as heavy, expensive and adapted to long, thin routes exceeding the range of E-jet E2, a close rival for market share.[123]

In October 2017, Boeing was reportedly concerned over its ability to match fleet package deals enabled by the partnership.[98] In December 2017, The Wall Street Journal reported Boeing was planning to offer Embraer more than the company's $3.7 billion market value in order to establish a joint venture.[124] Aviation industry analysts saw that deal as a reaction to the partnership.[125] The Boeing–Embraer joint venture was announced in February 2019, with the deal expected to close in June 2020 following antitrust investigations, but Boeing terminated the agreement in April 2020 due to impact of the 2019–20 coronavirus pandemic on aviation.[126]

The A220-300 with the Airbus livery after its July 2018 takeover

During competition investigation, Airbus and Bombardier were to operate separately and clean teams with privileged access to competitively sensitive data but separated from their management planned the integration, evaluating synergies and preparing communications to regulators.[127] Antitrust approval aimed at finalisation by summer 2018 Farnborough Air Show to allow a marketing push.[128]

On 8 June 2018, after regulatory approval, the partners announced that Airbus would take a majority stake on 1 July 2018.[129] The head office, leadership team and primary final assembly line (FAL) would stay in Mirabel, Quebec, with its workforce of 2,200.[129] The secondary FAL in Mobile would start deliveries in 2020 with a monthly production rate of four, rising to six for a capacity of eight while the main Mirabel FAL could go to ten.[130] Bombardier would fund the cash shortfalls if required, up to US$610 million from the second half of 2018 to 2021.[129]

Stretched version

In January 2010, JP Morgan reported that Bombardier was considering a 150-seat version of the CSeries; Bombardier described the report as speculative.[131] At the Farnborough Airshow in July 2012, Bombardier started discussions with AirAsia about a proposed 160-seat configuration for the CS300.[132] Consequently, by November 2012, this configuration was included in the CS300 project, although AirAsia rejected the proposal.[133] In May 2015, The Wall Street Journal reported that Bombardier was considering marketing a CS500, a further stretch of the CS300, to compete with the 160- to 180-seat versions of the Boeing 737 and A320 airliners, but was uncommitted.[134] The existing wing would be capable of supporting a stretched version.[135] After the Airbus partnership in 2018, the stretched variant (renamed A220-500 accordingly) would allow Airbus to enlarge its A320-family replacement to better compete with the proposed Boeing New Midsize Airplane.[98] In January 2019, Airbus hinted that a larger A220 variant could be developed, owing to ramped-up production and market demand for the current production models.[136] However, in June 2019, Airbus indicated that it would not consider launching an A220-500 until it has solved its A220 production issues, and definitely not in the following year.[137] Speculation about a stretched variant continued in November 2019, with Air France mentioning an A220-500 during an investor briefing on its modernisation strategy.[138] In December 2020, Air France said it would consider the Boeing 737 MAX and the A321 as alternatives if the A220-500 is not developed in time.[139]

Performance improvements

After beating performance promises by 3%, performance improvement packages shaving operating costs were previously studied by Bombardier before the Airbus partnership; these could include putting doors on the exposed main wheels, reducing drag but adding weight and complexity.[140] Two to three more seats could be added by moving the aft lavatory, without reducing the seat pitch.[141]

On 21 May 2019, Airbus announced a 2,268 kg (5,000 lb) MTOW increase from the second half of 2020, from 60.8 to 63.1 t (134,000 to 139,000 lb) for the A220-100 and 67.6 to 69.9 t (149,000 to 154,000 lb) for the A220-300, expanding the range by 830 km (450 nmi): the A220-300 to 6,200 and 6,300 km (3,350 and 3,400 nmi) for the A220-100.[142] With the Airbus ruleset (90 kg (200 lb) passengers with bags, 3% enroute reserve, 370 km (200 nmi) alternate and 30 minutes hold), the 108-seat A220-100 could reach 7,000 km (3,800 nmi) and the 130-seat A220-300 would achieve a range of 6,500 km (3,500 nmi) while being limited by its fuel capacity. With a denser economy seating at a 30-inch pitch down from 32, a 116-seat A220-100 would still reach 6,900 km (3,700 nmi) and a 141-seat A220-300 would exceed 6,200 km (3,350 nmi).[143]

In February 2020, Airbus announced an increase in payload capacity, achieved through a 1.8 t (4,000 lb) increase in the maximum zero-fuel weight and maximum landing weight of both the -100 and the -300, to be introduced as an option from 2022.[144] From 2021, David Neeleman's Breeze Airways project should receive A220-300s with extra fuel tanks for 7,400 km (4,000 nmi) of range, allowing transatlantic flights or long routes like OrlandoCuritiba, Brazil, more range than the A321LR with 70% lower trip costs than A330s.[145]

In March 2021, Airbus offered a further 1 t (2,200 lb) increase to the MTOW of the A220-300, to 70.9 t (156,000 lb), available from mid-2021 and providing another 200 nmi (370 km) of additional range to 6,570 km (3,550 nmi). On long routes the payload will be increased by about 900 kg (2,000 lb).[146]

Business jet (ACJ TwoTwenty)

In October 2020, Airbus announced an Airbus Corporate Jets (ACJ) variant of the A220-100, to be known as the ACJ TwoTwenty, with a range of 10,460 km (5,650 nmi) and cabin space of 73 m2 (790 sq ft) for 18 passengers.[147] On 17 May 2021, the first section of the ACJ TwoTwenty, the mid-fuselage section, had arrived at the A220 Final Assembly Line in Mirabel within the programme time frame and marked the start of the first Airbus corporate jet ever assembled in Canada.[148] The business jet made its first flight on 14 December 2021, before delivery to Comlux to be outfitted with a VIP cabin in Indianapolis.[149]

Bombardier exit

After reassessing its participation in January 2020, Bombardier exited the A220 programme in February 2020, selling its share to Airbus for $591 million. Airbus thus owned 75% of the programme; the remaining 25% of shares were held by Investissement Québec. Under the acquisition terms Airbus acquired Bombardier's option to buy out Investissement Québec's share from 2023, with a revised option date of 2026. Airbus also agreed to acquire A220 and A330 work package production capabilities from Bombardier in Saint-Laurent, to be taken through the Airbus subsidiary, Stelia Aerospace.[150]

Airbus and the government of Quebec agreed in February 2022 to invest a further $1.2b in Airbus Canada, to support the acceleration of the A220 production rate to 14 A220s per month.[99][115] Accordingly, Airbus would invest $900m into the aircraft programme and Investissement Québec $300m, allowing the partnership to continue until the programme becomes profitable in the middle of the decade. To protect Quebec's investment until it matured, the new earliest date Airbus could acquire the remainder of the shares thus became 2030.[151]

Design

The Airbus A220 family of narrow-body aircraft was originally designed by Bombardier under the CSeries programme.[152] The highly efficient engines and extensive use of composite materials,[20] like the wide-body Boeing 787 Dreamliner and Airbus A350 XWB, contribute together up to 14% lower cash operating costs. The geared turbofan engine and the optimised aerodynamics can save up to 25% fuel per seat, a 25% reduction in maintenance costs and a noise footprint area up to 50% smaller than previous generation aircraft with a 18 EPNdB margin to chapter 4.[153] The larger A220-300 (former CS300), is 6 tonnes (13,000 lb) lighter than the A319neo and nearly 8 tonnes (18,000 lb) lighter than the Boeing 737 MAX 7, helping it to achieve up to 12% operating costs savings and 15% with the current models.[154]

Systems

Cockpit with side-stick controller

The cockpit features the Rockwell Collins Pro Line Fusion avionics suite, which incorporates 15 in (380 mm) displays along with comprehensive navigation, communications, surveillance, engine-indicating and crew-alerting system (EICAS), and aircraft maintenance systems.[155] Other elements of the avionics and other subsystems include Parker Hannifin's flight control, fuel and hydraulics systems; Liebherr Aerospace's air management system; and United Technologies Corporation's air data system, flap and slat actuation systems.[27]

Cabin

Five-abreast, 2–3 seating, 3.28 m (10.8 ft) wide cabin

The five-abreast cabin cross section of the aircraft family was designed to give enhanced seating comfort for passengers, with features like broader seats and armrests for the middle passenger and larger windows at every seat to give every passenger the physical and psychological advantages of ample natural light.[152] The cabin featured large, rotating overhead storage bins, allowing each passenger to stow a sizeable carry-on bag overhead.[156] The manufacturer claims that compared to the cabins of current in-service narrowbody aircraft, the aircraft family would provide airlines with the highest overhead bin volume per passenger, a wider aisle that allows for faster boarding and disembarkation of passengers, and widest economy seats, greater than 18 in (46 cm) wide.[156][153]

Airframe

The centre fuselage of the A220-300 is 3.4 metres (11 ft) longer than the -100 and structurally reinforced for higher loads.[157] Extensive use of aluminium–lithium in the fuselage, and carbon composite in wings, empennage and rear fuselage reduces weight and increases corrosion resistance, resulting in better maintainability.[22] The overall airframe consists of 70% advanced lightweight materials, comprising 46% composite materials and 24% aluminium–lithium. Airbus claims the A220 can achieve an overall 25% lower seat-mile cost, 25% lower fuel burn and CO2 emissions advantage.[153] The aircraft features a low drag nose and tailcone design, minimum fuselage wetted area and optimised wing aerodynamics.[153]

Engine

PW1500G geared turbofan mounted under the wing

The new Pratt & Whitney PW1500G engine was expected to yield 12% better fuel economy than existing jets while being quieter, with further efficiency stemming from enhanced aerodynamics and advanced lightweight materials.[158]

Operational history

The all-new aircraft entered service as CSeries in the first two years, and was then rebranded as A220 following the Airbus partnership in 2018.

CSeries

Swiss International Air Lines introduced CSeries with the first CS100 in July 2016.
airBaltic became the second operator of the CSeries with the first CS300 in December 2016.

The first CSeries, a CS100, was delivered to Swiss Global Air Lines on 29 June 2016 at Montréal–Mirabel International Airport,[159][160] and began commercial service on 15 July with a flight between Zürich and Paris.[2][161] The launch operator stated in August, that "the customer feedback is very positive with the expected remarks concerning the bright cabin, reduced noise, enough leg room and space for hand luggage as well as the comfortable seats. Also, the feedback from our pilots is gratifying. They especially like the intuitive flying experience."[162] The first CS300 was delivered to AirBaltic on 28 November,[163][164] and began revenue service on 14 December with a flight from Riga to Amsterdam in a 145-seat two-class configuration.[77] The type launch operator lauded lower noise levels for passengers and more space for luggage than its Boeing 737-300s.[165]

Upon introduction, both variants were performing above their original specifications and the CS300 range was 2% better than the brochure, as were its per seat and per trip cost.[89] airBaltic reported a 2600 L/h fuel consumption against 3000 L/h for its Boeing 737-300 with similar capacity,[166] and claimed 21% better fuel efficiency.[165] Fuel burn was more than 1% lower than the marketing claims and Bombardier would update its performance specifications later in 2017.[167] The CSeries was 25% cheaper to fly than the replaced aircraft at Swiss, the Avro RJ100.[168] On long missions, the CS100 was up to 1% more fuel efficient than the brochure and the CS300 up to 3%.[169] The CS300 burned 20% less fuel than the Airbus A319, 21% less than the 737 Classic while the CS100 18 to 27% less per seat than the Avro RJ.[170]

2017

After 28,000 engine hours in 14 in-service aircraft with a powerplant dispatch reliability of 99.9%, Swiss replaced an engine pair in May 2017 after 2,400 hours, while AirBaltic replaced another one in June.[167] Swiss initially flew six sectors a day and by July 2017 up to nine a day with an average time of 1 hours 15 minutes.[167] Air Baltic's flight length averaged 3 hours, and the average fleet daily usage was 14 hours.[167] In September 2017, over 1.5 million passengers had 16,000 revenue flights in the 18 aircraft in service, making up to 100 revenue flights per day on 100 routes: most used were up to 17 hours per day and up to 10 legs per day.[169] Thirty-five minute turnarounds allowed 11 legs per day.[170]

On 8 August 2017, following the steep approach certification by EASA, Swiss completed its first revenue flight to London City from Zurich, replacing the Avro RJ.[171] As of September 2017, the CSeries fleet had undergone 20 A Checks with no significant maintenance issues.[169]

Korean Air received its first CS300 on 22 December 2017.

On 22 December 2017, after months of engine delivery delays, Korean Air became the third airline to take delivery of a CSeries.[172][173] On 20 January 2018, Korean Air made their first revenue flight with the CS300, from Seoul to Ulsan.[174] Korean Air received its second in early January 2018 and the remaining eight aircraft were to be delivered later in 2018.[175][88] As of June 2018, Air Baltic reached a maximum utilisation of 18.5 hours a day.[176]

A220

First delivery of A220-100 to Delta, the first North American operator in October 2018
Air Canada became the second North American operator of A220 in December 2019.
2018

On 1 July 2018, the partnership came into effect and the first aircraft with Airbus branding, an A220-300 (former CS300), was delivered to airBaltic on 20 July 2018.[177] On 26 October 2018, Delta Air Lines received its first A220-100 (former CS100) of its order for 75, which was previously disputed by Boeing.[178] On 7 February 2019, Delta operated its maiden A220-100 flight with service from New York–LaGuardia Airport to Dallas–Fort Worth.[179] On 21 December 2018, Air Tanzania received its first A220, a -300, to be based in Dar es Salaam.[180]

2019

As of June 2019, the launch operator, Swiss Air Lines successfully completed C checks on its A220 fleet, performed by SAMCO Aircraft Maintenance in its MRO facilities at Maastricht Airport.[181] On 6 September 2019, Egyptair received its first A220 of its order for 12, a -300 with 140 seats: 15 premium and 125 economy seats.[182] Its final A220-300 was delivered on 5 October 2020.[183] On 29 November 2019, the 100th A220, an A220-300, was delivered to the type launch operator, airBaltic. At that time the airline operated the longest flight by an A220 – a 6.5-hour flight from Riga to Abu Dhabi.[184] That year, airBaltic became the first airline capable of providing a full scope of maintenance for the A220-300.[185] On 20 December 2019, Air Canada received its first A220-300 of its order for 45.[186] Air Canada began A220 flights on 16 January 2020 between Calgary and Montreal.[187] Air Canada expected A220-300s to be 15% cheaper to operate per seat than the Embraer 190s they will replace.[188]

2020

During the height of the COVID-19 pandemic, the number of flights on many routes was reduced by more than 80% over the same period in 2019. The A220's features made it popular with airlines, as they preferred smaller aircraft with similar range and economic performance as larger ones, in order to keep the load factor high enough. Delta grounded their 62 A320s, for example, but continued to sell flights on their 31 A220-100 models and Swiss only operated 30% of their A320s but maintained flights on 45% of their 29 A220s.[189] Between May and December 2020, airBaltic operated all its flights with its A220-300s to minimize complexity.[190] On 31 December 2020, JetBlue Airways took delivery of its first A220-300 from a total order of 70 aircraft to replace its Embraer 190 fleet.[191]

2021

By January 2021, airBaltic's A220 fleet had completed close to 60,000 flights over 141,000 block hours, carrying over 5.6 million passengers as it completed C checks on the first seven aircraft of its fleet.[185] On 22 April 2021, Air Manas received its first A220-300 of planned three aircraft to be based in Bishkek, Kyrgyzstan and became the first operator in the CIS states to introduce the A220.[192] On 26 May 2021, Swiss took delivery of its thirtieth and last A220 at Zurich Airport.[193] On 27 July 2021, Réunion Island-based Air Austral became the first French A220 operator after receiving its first A220-300 of three planned to replace its ATR 72-500 and Boeing 737-800 aircraft, to be operated to Mauritius, Mayotte, Seychelles, South Africa, Madagascar and India.[194] On 29 September 2021, Air France, the largest A220 customer in Europe, received its first A220-300 from an order for 60 aircraft, to be operated on the airline's medium-haul network with a 148 passengers single-class cabin.[195]

From August 2020 to July 2021, the A220 average on-time performance (OTP) was 99%, led by Korean Air with 99.63%, giving the airline the "Airbus A220 Best Operational Excellence 2021" award on 4 October 2021, during IATA's Annual General Meeting.[196] On 17 December 2021, Breeze Airways, took delivery of its first A220-300, which was ferried from Airbus Mobile to Tampa International Airport.[197] On 29 December 2021, Air Senegal, the flag carrier of the Republic of Senegal. became the fourth A220 operator in Africa after receiving its first A220-300, which was delivered from Montreal via Paris to the carrier's home base in Dakar.[198]

2022

On 7 January 2022, Iraqi Airways, the national carrier of Iraq, took delivery of its first out of five A220-300 aircraft from the Mirabel site. Upon entry into service, it became the second airline after Egyptair to operate the A220 in the MENA region.[199] On 6 May, Air Austral resumed its route between Réunion and Chennai that had been suspended at the height of the COVID-19 pandemic. At 2,870 nm, the flight is the world's longest A220 route, a record previously held by airBaltic's Riga–Dubai flight of 2,684 nm.[200] On 12 July, approximately six years after the type entered service, Airbus delivered the 220th A220 to JetBlue Airways, the type's largest customer.[201] By September, the global A220 fleet had completed more than 650,000 flights over one million block hours on more than 800 routes to 325 destinations with 98.8% operational reliability.[153]

Dispatch reliability

The clean sheet airliner was targeted to have a 99.0% dispatch reliability at entry into service.[202] In August 2016, Swiss reported "much higher" reliability than other all-new airliners, citing Airbus's A320, A380 and Boeing's 787.[162] After four months of service with Swiss, this goal seemed to have been met based on only three aircraft and 1,500 hours flown; "nuisance messages" from the integrated avionics suite and engine start-up delays had been the main griefs.[203] Dispatch reliability rates of 99.0% were met in April 2017.[204] A year after introduction, in July 2017, launch operators had fewer issues than expected for an all-new aircraft program.[167] At this time point, airBaltic had already a 99.3–99.4% dispatch reliability, similar to the established Q400 but less than the relatively ubiquitous Boeing 737 Classic's 99.8%.[167] The dispatch reliability improved further to 99.85% in October 2017.[170]

Engine reliability

Since the PW1500G mount generates less strain on the turbine rotor assembly than the A320neo's PW1100G, it does not suffer from start-up and bearing problems but still from premature combustor degradation.[167] An updated combustor liner with a 6,000–8,000 hour limit has been developed and a third generation for 2018 will raise it to 20,000 hours in benign environments.[167]

After three inflight engine failures in 2019, Transport Canada issued an emergency airworthiness directive (EAD) limiting the power to 94% of N1 (Low Pressure Spool rotational speed) above 29,000 ft (8,800 m), disengaging the autothrottle for the climb over this altitude before engaging it again in cruise.[205]

Maintenance

The A check is scheduled after 850 flight hours: the check originally took 5 hours and has since been reduced to less than 3 hours, within an 8-hour shift.[167] The C check is scheduled after 8,500 hours – translating to about 3.5 years of operation.[167] Based on experience since product launch, A checks intervals could increase to 1,000 hours and C checks to 10,000 hours toward the end of 2019.[167]

Variants

There are two main variants: the shorter A220-100 including the ACJ TwoTwenty business jet version, and the 3.7 metres longer A220-300. Their commonality over 99% allows a common spare part inventory, reducing investment and maintenance costs.[206]

A220-100

The A220-100 is the shortest variant of the A220, seating typically between 100 and 130 passengers.[207] Originally marketed by Bombardier as the CS100, it competes with the Embraer E190 and E195.

Marketing designation of the BD-500-1A10 for aircraft from serial number 50011.[208]

A220-300

The A220-300 is the larger of the two A220, being 3.7 m (12.1 ft) longer than the -100, and carrying between 120 and 160 passengers.[209]

Since the acquisition of the program by Airbus, the A220-300 has been accused of cannibalizing sales from the A319neo. Given the two aircraft's striking similarities in size and range, and the lower operating costs of the A220 over the A319, it is likely that part of the low sales numbers of the latter jet can be attributed to the availability of the A220.[210]

Marketing designation of the BD-500-1A11 for aircraft from serial number 55003.[208]

ACJ TwoTwenty

The corporate jet version of the A220-100 has a range of 10,460 km (5,650 nmi) and a cabin area of 73 m2 (790 sq ft) for 18 passengers.[211] The first delivery is expected in 2023.[212]

Operators

Delta Air Lines is the largest customer & operator of the A220 family.

As of September 2022, there were 227 A220 family aircraft in commercial service with 15 operators.[153] The five largest operators were Delta Air Lines (57), airBaltic (36), Air Canada (31), Swiss International Air Lines (30) and JetBlue Airways (12).[3]

Orders and deliveries

JetBlue Airways is the second largest customer of the A220 family, with 100 aircraft ordered.

The A220 family had firm orders from 26 customers with Delta Air Lines as largest one and total aircraft deliveries as following:

Orders and deliveries by type (summary)[3]
Type Orders Deliveries Backlog
A220-10096[lower-alpha 1]55[lower-alpha 2]41
A220-300677[lower-alpha 3]172[lower-alpha 4]505
A220 family773227546
  1. 62 orders as CS100[88]
  2. 8 deliveries as CS100[88]
  3. 214 orders as CS300[88]
  4. 29 deliveries as CS300[88]
A220 family orders and deliveries by year (distributive)[3]
20092010201120122013201420152016201720182019202020212022 Total
Orders 50 40 43 15 34 65 117 12 165 63 30 38 105 773
Deliveries 7 17 33 48 38 50 34 227
A220 family orders and deliveries by year (cumulative)
Orders
Deliveries
Data as of September 2022[3]

Accidents and incidents

Accidents (zero data)

The A220 family has zero accidents to date.[213][214]

Incidents (engine related)

After three inflight shutdowns in July, September, and October 2019, Swiss International Air Lines temporarily withdrew its fleet for inspection.[215][216]

Specifications

Airbus A220 specifications[22]
Variant A220-100 (BD-500-1A10)[217] A220-300 (BD-500-1A11)[217]
Cockpit crew 2 pilots
Passengers 100–120 (max 135)[218] 120–150 (max 160)[218]
Seat pitch 28–36 in (71–91 cm) in Y/J 28–38 in (71–97 cm) in Y/J
Seat width 18.5 to 20 in (47 to 51 cm)
Cargo volume 23.7 m3 (840 cu ft) 31.6 m3 (1,120 cu ft)
Length 35.00 m (114.83 ft) 38.71 m (127.0 ft)
Wing 35.10 m (115.2 ft) span, 112.3 m2 (1,209 sq ft) area (10.97 AR)
Height 11.50 m (37.7 ft)
Fuselage diameter 3.5 m (11 ft)
Cabin 3.28 m (10.8 ft) width, 2.11 m (6.9 ft) height
Cabin length 23.7 m (78 ft)[219] 27.5 m (90 ft)[220]
MTOW[218] 63.10 t (139,100 lb) 70.90 t (156,300 lb)[146]
Maximum payload 15.1 t (33,300 lb) 18.7 t (41,200 lb)
OEW 35.22 t (77,650 lb)[221] 37.08 t (81,750 lb)[222]
Fuel capacity[218] 21,805 l (5,760 US gal) 21,508 l (5,682 US gal)
Range[218] 6,390 km (3,450 nmi) 6,667 km (3,600 nmi)[146]
Cruise speed Mach .82 (470 kn; 871 km/h) max, Mach .78 (447 kn; 829 km/h) typical
Takeoff distance (@ MTOW) 1,500 m (4,800 ft)[219] 1,900 m (6,200 ft)[220]
Landing distance (@ MLW) 1,390 m (4,550 ft)[219] 1,510 m (4,950 ft)[220]
Ceiling 12,000 m (41,000 ft)[217]
Engines 2× Pratt & Whitney PW1500G
Unit thrust 84 to 104 kN (18,900 to 23,300 lbf) 93 to 104 kN (21,000 to 23,300 lbf)
ICAO type BCS1[223] BCS3[223]

    See also

    Current and future generation regional jets and small narrowbodies, based on CAPA and Bombardier

    Related development

    • Bombardier CRJ700/900/1000
    • Comac C919 (agreement between Comac and Bombardier for program commonalities)[224]
    • Irkut MC-21 (agreement between Irkut and Bombardier for joint customer support)[225]

    Aircraft of comparable role, configuration, and era

    Related lists

    • List of civil aircraft
    • List of jet airliners

    References

    1. "Bombardier CSeries Aircraft Awarded Transport Canada Flight Test Permit" (Press release). Montreal: Bombardier Aerospace. 30 August 2013. Archived from the original on 14 December 2018. Retrieved 29 June 2016.
    2. "SWISS Launches Revenue Service with State-of-the-Art Bombardier C Series Aircraft" (Press release). Montreal: Bombardier Aerospace. 15 July 2016. Archived from the original on 29 November 2019. Retrieved 15 July 2016.
    3. "Airbus aircraft Orders and Deliveries (updated monthly)". Airbus S.A.S. 30 September 2022. Retrieved 10 October 2022.
    4. "Fokker 100 Leaflet" (PDF). Fokker Services. Archived from the original (PDF) on 27 November 2009.
    5. "Bombardier Ends Talks With Fokker" (Press release). Bombardier. 27 February 1996. Archived from the original on 3 April 2019. Retrieved 29 June 2016.
    6. Kevin O'Toole (20 March 1996). "Fokker bankrupt". Flightglobal. Retrieved 18 February 2022.
    7. "The CSeries: a timeline". Montreal Gazette. Archived from the original on 17 October 2018. Retrieved 27 January 2019.
    8. Lewis, Paul (19 September 2000). "Bombardier puts BRJ-X on hold". Washington DC: Flightglobal. Archived from the original on 17 August 2016. Retrieved 29 June 2016.
    9. "Bombardier Aerospace appoints head of new commercial aircraft program" (Press release). Bombardier. 26 February 2004. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    10. "Bombardier announces new commercial aircraft family name at Farnborough Airshow 2004" (Press release). 19 July 2004. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    11. "Bombardier Aerospace Granted Authority to Offer CSeries Aircraft to Customers" (Press release). Bombardier. 15 March 2005. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    12. "Bombardier Announces Location of Final Assembly Site and Work Packages for the CSeries" (Press release). Bombardier. 13 May 2005. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    13. "Bombardier and U.K. Government Sign Letter of Intent on CSeries". Bombardier. 13 May 2005. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    14. "Bombardier Announces CSeries Decision" (Press release). Bombardier. 31 January 2006. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    15. "Bombardier Updates Market on Status of its CSeries Commercial Aircraft Program" (Press release). Bombardier. 31 January 2007. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    16. Warwick, Graham (13 November 2007). "Bombardier chooses geared turbofan to power CSeries". Washington DC: Flightglobal. Archived from the original on 22 September 2018. Retrieved 29 June 2016.
    17. "Bombardier Grants Authority to Offer CSeries" (Press release). Bombardier. 22 February 2008. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    18. "Bombardier Launches CSeries Aircraft Program" (Press release). 13 July 2008. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    19. "Bombardier Launches CSeries". Aviation Today. 17 July 2008. Archived from the original on 18 January 2015.
    20. "Bombardier Plans New Jetliner". The Wall Street Journal. New York. 14 July 2008. p. B3. Archived from the original on 28 September 2017. Retrieved 5 March 2017.
    21. Kirby, Mary (11 March 2009). "Bombardier makes tweaks to CSeries specs". Philadelphia: Flightglobal. Archived from the original on 10 November 2012.
    22. "CSeries brochure" (PDF). Bombardier. June 2015. Archived from the original (PDF) on 8 September 2015. Retrieved 14 June 2015.
    23. Tomesco, Frederic (9 November 2009). "Bombardier's Beaudoin Sees Further Aerospace Cutbacks (Update2)". Bloomberg. Archived from the original on 20 October 2015.
    24. McCullough, Chris (14 February 2017). "British Airways owner 'lined up to buy' C Series jets from Bombardier". Belfast Telegraph. Archived from the original on 2 March 2017. Retrieved 1 March 2017.
    25. Ranson, Lori (17 November 2009). "Bombardier officially begins construction of Belfast CSeries site". Washington DC: Flightglobal. Archived from the original on 17 August 2016. Retrieved 29 June 2016.
    26. "Bombardier Announces Three Key European Suppliers for CSeries Aircraft Program" (Press release). Bombardier. 24 March 2009. Archived from the original on 27 April 2017. Retrieved 27 April 2017.
    27. Mary Kirby (1 June 2009). "Majority of CSeries supplier contracts already awarded". Philadelphia: Flightglobal. Archived from the original on 4 March 2016. Retrieved 1 September 2016.
    28. Airbus (14 January 2019). "A220 global partners". Archived from the original on 27 May 2021. Retrieved 15 January 2019 via Scott Hamilton.
    29. "Bombardier awards contract to Ghafari to redevelop CSeries Aircraft Manufacturing Complex". ATW Plus. Air Transport World. 16 August 2010. Archived from the original on 21 July 2011. Retrieved 16 August 2010.(subscription required)
    30. "From war to partner: Airbus and the CSeries". Leeham. 18 October 2017. Archived from the original on 23 February 2018. Retrieved 19 October 2017.
    31. Kingsley-Jones, Max (27 January 2010). "CSeries poised for design freeze as joint definition phase concludes". London: Flightglobal. Archived from the original on 18 January 2015. Retrieved 29 June 2016.
    32. "CSeries 'On Track' for First Flight in Second-Half of 2012". Aviation International News. 12 November 2011. Archived from the original on 5 August 2016.
    33. "Bombardier's Beaudoin still upbeat on CSeries". The Vancouver Sun. 13 June 2012.
    34. "Bombardier Announces Financial Results for the Third Quarter Ended September 30, 2012" (Press release). Bombardier. 7 November 2012. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    35. "CSeries Aircraft Program Making Excellent Progress Towards First Flight" (Press release). Bombardier. 7 March 2013. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    36. "Bombardier Powers On the First CSeries Flight Test Vehicle and Completes Wing Static Testing Required for First Flight" (Press release). Bombardier. 25 March 2013. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    37. "Bombardier Completes CSeries Aircraft Ground Vibration Tests and Final Software Upgrades In Preparation for First Flight" (Press release). Bombardier. 26 June 2013. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    38. "Bombardier CSeries Aircraft First Flight to Take Place in the Coming Weeks" (Press release). Bombardier. 24 July 2013. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    39. "Bombardier CSeries jet completes maiden flight". CBC/Radio-Canada. 16 September 2013. Archived from the original on 17 September 2013. Retrieved 17 September 2013.
    40. "Bombardier's CSeries Aircraft Completes Historic First Flight" (Press release). Bombardier. 16 September 2013. Archived from the original on 29 May 2016. Retrieved 29 June 2016.
    41. "FTV1 Flies Again!" (Press release). Bombardier. 1 October 2013. Archived from the original on 27 May 2021. Retrieved 29 June 2016.
    42. "Bombardier Aerospace Confirms Change to its CSeries Aircraft's Entry-into-Service". Bombardier. 16 January 2014. Archived from the original on 18 March 2016. Retrieved 29 June 2016.
    43. Campion-Smith, Bruce (30 May 2014). "Bombardier CSeries test jet suffers engine failure". Toronto Star. Archived from the original on 28 September 2017. Retrieved 24 August 2017.
    44. Wall, Robert (13 July 2014). "Bombardier Sees CSeries Test Flights Resuming in Weeks". The Wall Street Journal. Archived from the original on 28 September 2017. Retrieved 13 March 2017.
    45. Ho, Solarina (19 August 2014). "More Bombardier executive reshuffling as CSeries still grounded". Reuters. Archived from the original on 28 September 2017. Retrieved 30 June 2017.
    46. Trimble, Stephen (8 September 2014). "CSeries flight ends 100-day grounding". Washington DC: Flightglobal. Archived from the original on 11 September 2014. Retrieved 8 September 2014.
    47. "Work carried out in Belfast has contributed to one of the biggest changes in aerospace history, according to Bombardier Aerospace". Belfast Telegraph. 26 November 2014. Archived from the original on 3 December 2014. Retrieved 7 December 2014.
    48. Ostrower, John and Paul Vieira (8 January 2015). "Jet Maker Bombardier Finds Bigger Proves Far From Better". Wall Street Journal. p. A1. Archived from the original on 11 May 2017. Retrieved 5 March 2017.
    49. "CSeries aircraft program progressing well with more than 1,000 flight test hours achieved" (Press release). Bombardier. 20 February 2015. Archived from the original on 27 September 2017. Retrieved 29 June 2016.
    50. Trimble, Stephen (27 February 2015). "CS300 completes first flight". London: Flightglobal. Archived from the original on 2 March 2015. Retrieved 27 February 2015.
    51. "Exclusive: CSeries performance better than guarantees, "favorable" to brochure; range better than advertised". leehamnews. 3 March 2015. Archived from the original on 26 April 2016. Retrieved 29 June 2016.
    52. "Bombardier FTV5 Takes To The Skies". Aero-News Network. 20 March 2015. Archived from the original on 2 April 2015. Retrieved 23 March 2015.
    53. "Bombardier Resets CSeries Debut to 2016 as Timeline Slips". Bloomberg. 27 March 2015. Archived from the original on 27 March 2015. Retrieved 28 March 2015.
    54. "Flight Tests Show Bombardier C Series Aircraft Performance Better than Targets" (Press release). Bombardier. 14 June 2015. Archived from the original on 23 April 2016. Retrieved 29 June 2016.
    55. "Certification Tests Over 80 per cent Complete for Bombardier C Series Aircraft". Bombardier Inc. 20 August 2015. Archived from the original on 24 August 2015. Retrieved 26 August 2015.
    56. Bombardier (14 October 2015). "Bombardier C Series Aircraft Certification Program Over 90 per cent Complete" (Press release). Bombardier. Archived from the original on 18 October 2015. Retrieved 14 October 2015.
    57. "Bombardier Celebrates the Completion of its CS100 Aircraft's Certification Flight Test Program" (Press release). Bombardier. 17 November 2015. Archived from the original on 25 September 2019. Retrieved 17 November 2015.
    58. "Bombardier Completes First Phase of C Series Route Proving" (Press release). Bombardier. 25 November 2015. Archived from the original on 2 December 2015. Retrieved 27 November 2015.
    59. Warwick, Graham (April 2016). "A BIG YEAR - 2016 is a critical time for the Bombardier CSeries with first deliveries scheduled" (PDF). Air Transport World. Retrieved 30 May 2021.
    60. Tomesco, Frederic (29 September 2015). "Bombardier Called 'Huge Asset' as Quebec Vows Aid If Needed". Bloomberg. Archived from the original on 28 September 2017. Retrieved 5 March 2017.
    61. Owram, Kristine (7 October 2015). "Bombardier Inc's Airbus talks signal 'the beginning of the end' for CSeries, experts say". Financial Post. Toronto. Archived from the original on 15 October 2015. Retrieved 14 October 2015.
    62. Van Wagenen, Juliet (8 October 2015). "Is the CSeries Doomed?". Aviation Today. Access Intelligence. Archived from the original on 4 March 2016. Retrieved 8 October 2015.
    63. Marowits, Ross; The Canadian Press (8 October 2015). "Bombardier says it has no plans to kill CSeries after approaching Airbus". Canadian Business. Archived from the original on 4 March 2016. Retrieved 14 October 2015.
    64. "Quebec makes high-risk bet with $1-billion Bombardier investment". The Globe and Mail. 29 October 2015. Archived from the original on 4 March 2016. Retrieved 24 August 2017.
    65. Valiante, Giuseppe (29 October 2015). "Bombardier CSeries, aerospace industry too important to give up: Quebec government". the Toronto Star. The Canadian Press. Archived from the original on 29 September 2017. Retrieved 24 August 2017.
    66. Kristine Owram (2 November 2015). "Bombardier Inc could need a second bailout within 12–18 months: Scotiabank". Financial Post. Archived from the original on 3 November 2015. Retrieved 2 November 2015. we believe that the writedown corroborates our long-held view that the CSeries is not going to be value accretive under any scenario
    67. Lu, Vanessa (28 April 2016). "Despite Delta's order, Bombardier wants Ottawa's help". The Star. Toronto, Ontario, Canada. Archived from the original on 29 April 2016. Retrieved 29 April 2016.
    68. Wingrove, Josh; Deveau, Scott (15 April 2016). "Bombardier Rejects Aid Proposal From Canadian Government". Bloomberg. Archived from the original on 28 September 2017. Retrieved 5 March 2017. A spokesman for Innovation Minister Navdeep Bains, who is leading the review of Bombardier's request, declined to comment on the government offer
    69. Marowits, Ross. "Ottawa to give Bombardier $372.5 million in loans". CTVNews. Archived from the original on 5 April 2017. Retrieved 4 April 2017.
    70. "Working on A220 – Overview". Bombardier. Archived from the original on 3 June 2019. Retrieved 3 June 2019.
    71. Lu, Vanessa (18 December 2015). "Bombardier's CSeries jet certified for commercial service". Toronto Star. Toronto, Ontario. Archived from the original on 19 December 2015. Retrieved 19 December 2015.
    72. The Canadian Press (16 June 2016). "European and U.S. aviation bodies certify Bombardier CSeries 100 aircraft finally clearing the way for takeoff". Financial Post. Archived from the original on 17 June 2016. Retrieved 16 June 2016.
    73. "Bombardier receives CSeries certification from Transport Canada". CBC News. CBC/Radio Canada. 18 December 2015. Archived from the original on 18 December 2015. Retrieved 19 December 2015.
    74. Trimble, Stephen (18 December 2015). "Transport Canada announces type certification for CSeries". Washington DC: Flightglobal. Archived from the original on 22 December 2015. Retrieved 21 December 2015.
    75. "Bombardier CS300 Aircraft Awarded Type Certification by Transport Canada" (Press release). Bombardier. 11 July 2016. Archived from the original on 14 July 2016. Retrieved 11 July 2016.
    76. Gregory Polek (7 October 2016). "Bombardier CS300 Wins EASA Nod". Aviation International News. Retrieved 4 September 2021.
    77. Gregory Polek (14 December 2016). "Bombardier's CS300 Enters Service with Air Baltic". Aviation International News. Archived from the original on 17 December 2016. Retrieved 15 December 2016.
    78. "Bombardier Obtains Same Type Rating for Both C Series Jetliners" (Press release). Bombardier. 23 November 2016. Archived from the original on 24 November 2016. Retrieved 24 November 2016.
    79. Gregory Polek (27 March 2017). "Bombardier Flies C Series Demo from London City to New York". Aviation International News. Archived from the original on 5 April 2017. Retrieved 4 April 2017.
    80. "Transport Canada and EASA Award Steep Approach Certifications to Bombardier CS100 Aircraft" (Press release). Bombardier. 26 April 2017. Archived from the original on 28 April 2017. Retrieved 27 April 2017.
    81. David Kaminski-Morrow (3 December 2018). "Airbus A220 obtains Cat III autoland approval". Flightglobal. Archived from the original on 3 December 2018. Retrieved 3 December 2018.
    82. "Airbus A220 Gains ETOPS 180 Approval". Airways Magazine. 14 January 2019. Archived from the original on 6 February 2021. Retrieved 15 February 2021.
    83. "A220 airliner wins approval from Transport Canada for 180 minutes ETOPS capability" (Press release). Airbus. 14 January 2019. Archived from the original on 15 January 2019. Retrieved 15 January 2019.
    84. "Airbus A330neo and A220 approved for ETOPS". Aviation News Journal. 5 February 2019. Retrieved 14 July 2021.
    85. David Kaminski-Morrow (27 July 2021). "EASA clears A220-300 to take up to 149 passengers". Flightglobal. Retrieved 3 September 2021.
    86. Gabriele Petrauskaite (28 September 2021). "Airbus in talks with China over potential A220 certification". AeroTime Hub. Retrieved 29 September 2021.
    87. "Bombardier meets goal of seven CSeries deliveries in 2016". FlightGlobal. 5 January 2017. Retrieved 28 August 2021.
    88. "CSeries/A220 production list and orders". ABCDlist.
    89. Victoria Moores (6 December 2016). "Bombardier: CSeries aircraft performing better than expected". Air Transport World. Aviation Week Network. Archived from the original on 7 December 2016. Retrieved 7 December 2016.
    90. Jon Hemmerdinger (2 November 2017). "Bombardier discloses tentative deal covering 61 CSeries jets". Flightglobal. Archived from the original on 2 November 2017. Retrieved 2 November 2017.
    91. Hemmerdinger, Jon (2 January 2018). "Bombardier falls short of 2017 CSeries delivery target". Flight Global. Archived from the original on 27 May 2021. Retrieved 16 January 2020.
    92. Stephen Trimble (8 June 2018). "Can Airbus make the CSeries realise its potential?". Flightglobal. Archived from the original on 27 May 2021.
    93. Addison Schonland (2 May 2018). "C Series Aircraft Partnership update". AirInsight. Archived from the original on 4 May 2018. Retrieved 3 May 2018.
    94. "Airbus introduces the A220-100 and A220-300" (Press release). Airbus. 10 July 2018. Archived from the original on 12 July 2018. Retrieved 10 July 2018.
    95. "Airbus Canada Limited Partnership new name comes into effect June 1" (Press release). Airbus. 31 May 2019. Archived from the original on 31 May 2019. Retrieved 31 May 2019.
    96. Benjamin D Katz (10 July 2018). "Airbus Seeks 100-Plus Orders for Bombardier Jet Now Called A220". bloomberg. Archived from the original on 25 September 2018. Retrieved 11 July 2018.
    97. Buno Trévidic (27 July 2018). "Airbus réclame 20 % de baisse des prix aux fournisseurs de l'A220". Les Echos (in French). Archived from the original on 28 July 2018. Retrieved 3 August 2018.
    98. Jens Flottau, Graham Warwick and Guy Norris (27 October 2017). "Airbus/Bombardier C Series Deal Has Broad Implications". Aviation Week & Space Technology. Archived from the original on 30 October 2017. Retrieved 30 October 2017.
    99. Tim Hepher (14 January 2019). "Airbus steps up pressure on suppliers over Canadian jet". Reuters. Archived from the original on 15 January 2019. Retrieved 15 January 2019.
    100. David Kaminski Morrow (26 July 2018). "A220 has treble-figure annual production potential". Flightglobal. Archived from the original on 27 July 2018. Retrieved 26 July 2018.
    101. Hemmerdinger, Jon (15 January 2020). "A220 cost reductions on 'track' as Airbus seeks to make the Quebec programme profitable". Flight Global. Archived from the original on 22 February 2020. Retrieved 22 February 2020.
    102. "A220 wins 180 ETOPS". Leeham News. 14 January 2019. Archived from the original on 15 January 2019. Retrieved 15 January 2019.
    103. Chris Sloan; James Field (16 January 2019). "Airbus Breaks Ground: New A220 FAL in Mobile". Airways International. Archived from the original on 17 January 2019. Retrieved 17 January 2019.
    104. Hemmerdinger, Jon (17 January 2019). "ANALYSIS: Airbus lifts A220's future with Mobile groundbreaking". Flightglobal.com. Archived from the original on 17 January 2019. Retrieved 17 January 2019.
    105. "Airbus in Alabama: A220 Production Begins". Airliner World. October 2019: 16.
    106. "Airbus begins U.S. production of A220 aircraft" (Press release). Airbus. 5 August 2019. Archived from the original on 6 August 2019. Retrieved 6 August 2019.
    107. Norris, Guy (17 January 2019). "Airbus A320, A220 Evolution Considered As Mobile Expands". Aviation Week Network. Archived from the original on 27 May 2021. Retrieved 17 January 2019.
    108. Flottau, Jens (13 February 2020). "Bombardier Sells Remaining A220 Shareholding To Airbus, Quebec". Aviation Week Network. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
    109. Kaminski-Morrow, David (13 February 2020). "A220 break-even pushed back to mid-2020s". Flight Global. Archived from the original on 13 August 2020. Retrieved 14 February 2020.
    110. "Bombardier "Couldn't Afford" CSeries Alone, Admits CEO Alain Bellemare". Radio Canada. 20 February 2020. Archived from the original on 20 February 2020. Retrieved 20 February 2020.
    111. Jon Hemmerdinger (3 June 2020). "First A220 assembled in Mobile takes flight". Flightglobal. Archived from the original on 3 June 2020. Retrieved 3 June 2020.
    112. "Airbus delivers its first U.S.-assembled A220 from Mobile, Alabama" (Press release). Airbus. 22 October 2020. Archived from the original on 27 October 2020. Retrieved 23 October 2020.
    113. "Airbus updates production rates in response to market environment" (Press release). Toulouse: Airbus. 21 January 2021. Archived from the original on 3 March 2021. Retrieved 20 February 2021.
    114. Kaminski-Morrow, David (18 February 2021). "Airbus strives for break-even on A220 and low-rate twin-aisles". Flight Global. Archived from the original on 18 February 2021. Retrieved 18 February 2021.
    115. David Kaminski-Morrow (27 May 2021). "Airbus looks to take monthly A320neo output to 64 within two years". Flightglobal.
    116. Marowits, Ross (16 October 2017). "European giant Airbus to buy majority stake in Bombardier's CSeries program". Toronto Star. The Canadian Press. Archived from the original on 17 October 2017. Retrieved 17 October 2017.
    117. "Airbus and Bombardier Announce C Series Partnership" (Press release). 16 October 2017. Airbus Archived 17 October 2017 at the Wayback Machine, Bombardier Archived 17 October 2017 at the Wayback Machine
    118. Rapoport, Geoff (17 October 2017). "Airbus To Revive C-Series". AVweb. Archived from the original on 18 July 2018. Retrieved 18 October 2017.
    119. Guy Norris and Graham Warwick (16 October 2017). "Airbus, Bombardier Forge Industry-Shaking C Series Agreement". Aviation Week network. Archived from the original on 18 October 2017. Retrieved 18 October 2017.
    120. "Airbus CEO expects to sell 'thousands' of C Series aircraft". CBC.ca. CBC. 20 October 2017. Archived from the original on 2 November 2017. Retrieved 2 November 2017.
    121. Ernest S. Arvai (19 October 2017). "Re-Examining The Potential Market For The CSeries". AirInsight. Archived from the original on 20 October 2018. Retrieved 20 October 2017.
    122. Benjamin D. Katz; et al. (25 April 2018). "Bombardier C Series Set to Become Just Another Airbus After Deal". Bloomberg. Archived from the original on 27 April 2018. Retrieved 26 April 2018.
    123. Jens Flottau (21 November 2017). "Industry Closely Watching Airbus". Aviation Week & Space Technology. Archived from the original on 23 November 2017. Retrieved 22 November 2017.
    124. Dana Mattioli, Dana Cimilluca and Liz Hoffman (21 December 2017). "Boeing Held Takeover Talks With Brazilian Aircraft Maker Embraer". The Wall Street Journal. Archived from the original on 27 November 2020. Retrieved 26 November 2020.
    125. Johnsson, Julie; Moura, Fabiola; Black, Thomas (21 December 2017). "Boeing Is in Talks for Combination With Regional-Jet Maker Embraer". Bloomberg. Archived from the original on 29 June 2019. Retrieved 22 December 2017.
    126. "Boeing Terminates Agreement to Establish Joint Ventures with Embraer" (Press release). Boeing. 25 April 2020. Archived from the original on 28 May 2020. Retrieved 26 November 2020.
    127. Ian Goold (11 December 2017). "Airbus, Bombardier Launch 'Clean Teams' for C Series Effort". AIN. Archived from the original on 13 December 2017. Retrieved 13 December 2017.
    128. Benjamin D. Katz; et al. (16 March 2018). "Airbus Sees C Series Deal Closing as Early as Mid-Year". Bloomberg. Archived from the original on 17 March 2018. Retrieved 17 March 2018.
    129. "Airbus, Bombardier and Investissement Québec agree C Series Partnership closing effective July 1, 2018". Airbus (Press release). 8 June 2018.
    130. "Airbus–C Series deal closes July 1; presents challenges for Boeing, Embraer". Leeham News. 8 June 2018. Archived from the original on 18 July 2018. Retrieved 9 June 2018.
    131. Kirby, Mary (6 January 2010). "Talk of 150-seat CSeries in the fray following analyst report". Flightglobal. Archived from the original on 27 May 2021. Retrieved 19 February 2021.
    132. Govindasmy, Siva (12 July 2012). "AirAsia boss confirms talks for 100 CSeries CS300". Farnborough: Flightglobal. Archived from the original on 6 November 2012. Retrieved 13 January 2013.
    133. Trimble, Stephen (29 November 2012). "Bombardier moves CS300 into detailed design with high-density variant included". Washington DC: Flightglobal. Archived from the original on 11 December 2012. Retrieved 16 December 2012.
    134. Ostrower, Jon (21 May 2015). "Bombardier Weighs Third CSeries Jet Model". The Wall Street Journal. New York. Archived from the original on 31 December 2016. Retrieved 5 March 2017.
    135. Gubisch, Michael (8 July 2016). "Bombardier confirms CSeries wing could accommodate larger variant". Flightglobal.com. Archived from the original on 6 August 2019. Retrieved 6 August 2019.
    136. Hemmerdinger, Jon (16 January 2019). "Airbus open to developing larger version of A220". Flightglobal. Archived from the original on 23 January 2019. Retrieved 17 January 2019.
    137. "A220, a year later". Wings Over Québec. Archived from the original on 4 August 2019. Retrieved 3 July 2019.
    138. "Will Air France fleet renewal include stretched A220?". Flightglobal.com. 8 November 2019. Archived from the original on 9 November 2019. Retrieved 9 November 2019.
    139. Bailey, Joanna (30 November 2020). "Air France Eyes 737 MAX If A220 Stretch Doesn't Happen". Simple Flying. Archived from the original on 27 January 2021. Retrieved 19 February 2021. If Airbus decides to make a larger version of the A220, that could make sense. Of course, now that the MAX is flying again, we could look at that. And, of course, there's always the A321, the LR and the XLR.
    140. "PIPs planned for A220 to improve operating costs". Leeham News. 17 January 2019. Archived from the original on 14 August 2020. Retrieved 17 January 2019.
    141. Scott Hamilton (21 January 2019). "The Airbus North America Tour". Leeham News. Archived from the original on 21 January 2019. Retrieved 21 January 2019.
    142. "Airbus announces major performance improvement to its latest single-aisle aircraft – the A220 Family" (Press release). Airbus. 21 May 2019. Archived from the original on 21 May 2019. Retrieved 21 May 2019.
    143. "Airbus' A220 gets increased range next year". Leeham news. 30 May 2019. Archived from the original on 27 May 2021. Retrieved 5 June 2019.
    144. Kaminski-Morrow, David (3 February 2020). "Airbus to hike maximum zero-fuel weight on A220". Flight Global. Archived from the original on 3 February 2020. Retrieved 3 February 2020.
    145. Jens Flottau (12 September 2019). "Neeleman To Set Up Another U.S. Airline Operating Used E195s". Aviation Week Network. Archived from the original on 27 May 2021. Retrieved 13 September 2019.
    146. Kaminski-Morrow, David (23 March 2021). "Airbus extracts more range from A220-300 with further weight increase". Flight Global. Archived from the original on 23 March 2021. Retrieved 23 March 2021.
    147. "Airbus Corporate Jets launches ACJ TwoTwenty business jet". Airbus (Press release). 6 October 2020. Archived from the original on 8 October 2020. Retrieved 7 October 2020.
    148. "Airbus welcomes first ACJ TwoTwenty section in Mirabel / Canada". Canadian Aviation News. 17 May 2021. Archived from the original on 18 May 2021. Retrieved 18 May 2021.
    149. "Newly launched ACJ TwoTwenty completes first flight" (Press release). Airbus. 14 December 2021.
    150. David Kaminski-Morrow (13 February 2020). "Airbus takes 75% of A220 programme as Bombardier exits". Flightglobal. Archived from the original on 26 October 2020. Retrieved 13 February 2020.
    151. Allison Lampert (4 February 2022). "Airbus, Quebec reach $1.2 bln investment deal for A220 jet program". Reuters. Retrieved 17 February 2022.
    152. "Bombardier Unveils CSeries Mockup at Paris Air Show" (Press release). Bombardier. 12 June 2005. Archived from the original on 20 September 2016. Retrieved 29 June 2016.
    153. "Facts and Figures - A220 FAMILY: PURPOSE BUILT FOR EFFICIENCY" (PDF). Airbus.
    154. Oleksandr Laneckij, Andrii Raschuk (13 December 2016). "The Plastic Airplane: a Review of the World's First Bombardier CS300 Airliner". Centre for Transport Strategies. Kyiv, Ukraine. Archived from the original on 7 September 2017. Retrieved 7 September 2017.
    155. "Bombardier Selects Rockwell Collins Pro Line Fusion(TM) for CSeries" (Press release). Rockwell Collins. 13 July 2008. Archived from the original on 4 March 2016. Retrieved 29 June 2016.
    156. "Aerospace > Products > Commercial Aircraft > CSeries". Bombardier. Archived from the original on 15 June 2011. Retrieved 12 August 2009.
    157. "A220 Family – the story so far" (PDF). Airbus technical magazine. 30 April 2019.
    158. "A New Bombardier Jet Draws Only Tepid Demand". The New York Times. 14 July 2008. Archived from the original on 19 June 2011. Retrieved 21 February 2017.
    159. Walker, Karen; Warwick, Graham (29 June 2016). "First CSeries aircraft is delivered to SWISS". Air Transport World. Archived from the original on 30 June 2016. Retrieved 1 July 2016.
    160. "Bombardier Delivers First C Series Aircraft to Launch Operator SWISS" (Press release). Bombardier. 29 June 2016. Archived from the original on 2 July 2016. Retrieved 29 June 2016.
    161. Kristine Owram (15 July 2016). "Bombardier's CSeries holds its maiden commercial flight from Zurich to Paris". Financial Post. Archived from the original on 18 July 2016. Retrieved 16 July 2016.
    162. Owram, Kristine (24 August 2016). "Bombardier Inc's CSeries showing 'much higher' reliability than competitors, Swiss Air Lines says". Financial Post. Archived from the original on 8 April 2017. Retrieved 7 April 2017.
    163. Stephen Trimble (28 November 2016). "Bombardier delivers first CS300 to Air Baltic". Flight Global. Archived from the original on 29 November 2016. Retrieved 28 November 2016.
    164. van der Linde, Damon (28 November 2016). "Bombardier hands over its largest CSeries jet to Latvian carrier, the first in 20-plane order". The Financial Post. Archived from the original on 2 December 2016. Retrieved 29 November 2016.
    165. Michael Sasso and Frederic Tomesco (14 August 2017). "New York, L.A. Seen by Delta as Bases for Newest Bombardier Jet". Bloomberg. Archived from the original on 4 September 2017.
    166. "Fleet". airBaltic. Archived from the original on 10 March 2017. Retrieved 4 February 2017.
    167. Michael Gubisch (14 July 2017). "How has the CSeries performed in service?". Flightglobal. Archived from the original on 29 November 2019. Retrieved 17 July 2017.
    168. Kurt Hofmann (9 August 2017). "SWISS to replace A319s with CSeries aircraft". Aviation Week Network. Archived from the original on 10 August 2017. Retrieved 10 August 2017.
    169. Istifan Ghanem (September 2017). "Cseries program update" (PDF). Bombardier. Archived (PDF) from the original on 13 September 2017. Retrieved 13 September 2017.
    170. Jens Flottau, Graham Warwick and Guy Norris (20 October 2017). "Airlines Praise C Series Performance, Manage Early Issues". Aviation Week & Space Technology. Archived from the original on 23 October 2017. Retrieved 23 October 2017.
    171. Jon Hemmerdinger (8 August 2017). "Swiss completes first CSeries revenue flight to London City". flightglobal. Archived from the original on 27 September 2020. Retrieved 9 August 2017.
    172. "Bombardier Delivers Korean Air Line's First CS300 Airliner" (Press release). Montreal: Bombardier Aerospace. 22 December 2017. Archived from the original on 18 August 2019. Retrieved 18 August 2019.
    173. Stephen Trimble (22 December 2017). "Korean Air becomes third operator for CSeries". Flightglobal. Archived from the original on 23 December 2017. Retrieved 23 December 2017.
    174. "Bombardier Foresees 2,050 new aircraft for Asia-Pacific by 2036" (Press release). Singapore: Bombardier Aerospace. 6 February 2018. Archived from the original on 18 August 2019. Retrieved 18 August 2019.
    175. "Korean Air to receive first Bombardier C Series jet on Friday after engine delays". Reuters. 20 December 2017. Archived from the original on 20 December 2017. Retrieved 20 December 2017.
    176. Sean Broderick (29 June 2018). "Airbus Stepping Into Improving C Series Program". Aviation Week & Space Technology. Archived from the original on 1 July 2018. Retrieved 4 July 2018.
    177. Harper, Lewis (20 July 2018). "Pictures: Air Baltic receives first Airbus A220-branded jet". Flight Global. Archived from the original on 23 July 2018. Retrieved 23 July 2018.
    178. Edward Russell (26 October 2018). "Delta takes North America's first A220". Flightglobal. Archived from the original on 26 October 2018. Retrieved 26 October 2018.
    179. "Delta Air Lines' A220s takes to the skies for first commercial flight". eTurboNews. 7 February 2019. Archived from the original on 8 February 2019. Retrieved 7 February 2019.
    180. Duchesne, Annabelle; Ismail, Samsana (21 December 2018). "Air Tanzania becomes first African-based A220 operator". Airbus Commercial Aircraft (Press release). Archived from the original on 22 January 2021. Retrieved 3 December 2020.
    181. "SAMCO and Swiss successful in completing heavy maintenance checks on Airbus A220". Aviator Aero. 28 June 2019. Archived from the original on 9 May 2021. Retrieved 9 May 2021.
    182. Duchesne, Annabelle; Al-Farah, Zaid (6 September 2019). "First A220 delivery to EGYPTAIR" (Press release). Airbus. Archived from the original on 9 August 2020. Retrieved 3 December 2020.
    183. "EgyptAir receives final A220-300 aircraft from Airbus". Egypt Independent. 5 October 2020. Archived from the original on 27 May 2021. Retrieved 3 December 2020.
    184. Duchesne, Annabelle; Carpenter, Heidi (29 November 2019). "Airbus celebrates the 100th A220 aircraft produced" (Press release). Airbus.
    185. "airBaltic has Performed Seven Airbus A220-300 C Checks". AviationPros. 20 January 2021. Archived from the original on 9 May 2021. Retrieved 9 May 2021.
    186. "Air Canada takes delivery of its first A220" (Press release). Mirabel: Airbus. 20 December 2019. Archived from the original on 28 December 2019. Retrieved 31 December 2019.
    187. Hemmerdinger, Jon (21 December 2019). "Air Canada receives its first A220". Flight Global. Archived from the original on 30 December 2019. Retrieved 31 December 2019.
    188. Hemmerdinger, Jon (15 January 2019). "Air Canada studies dozens of potential A220 routes". Flight Global. Archived from the original on 15 January 2020. Retrieved 15 January 2020.
    189. Haupt, Tomas (18 May 2020). "Airbus A220 – The Star of the Post-Coronavirus Travel World". Tourism Review. Retrieved 10 July 2021.
    190. "airBaltic Says Goodbye to Final Boeing 737". Aviation Pros. 17 December 2020. Retrieved 22 August 2021.
    191. Wolfsteller, Pilar (1 January 2021). "JetBlue takes delivery of first A220-300". Flight Global. Archived from the original on 25 January 2021. Retrieved 14 February 2021.
    192. Kaminski-Morrow, David (22 April 2021). "Kyrgyzstan's Air Manas introduces CIS states' first A220". Flight Global. Archived from the original on 25 April 2021. Retrieved 25 April 2021.
    193. Karantzavelou, Vicky (26 May 2021). "SWISS concludes Airbus A220 fleet renewal with 30th delivery". Travel Daily News. Retrieved 28 May 2021.
    194. Orban, André (27 July 2021). "Indian Ocean based Air Austral becomes first French Airbus A220 operator (days before Air France)". Aviation 24 Belgium.
    195. Galabert, Anne; Duchesne, Annabelle (29 September 2021). "Airbus delivers first of 60 A220s to Air France" (Press release). Airbus.
    196. "Korean Air selected as best A220 operator" (Press release). Korean Air. 5 October 2021.
    197. "US's Breeze Airways inducts first A220". ch-aviation. 17 December 2021.
    198. "Air Senegal Becomes Fourth Airbus A220 Operator In Africa". Aviation Week Network. 5 January 2022.
    199. Al-Farah, Zaid; Ismail, Samsana; Duchesne, Annabelle (7 January 2022). "Iraqi Airways receives its first A220-300" (Press release). Airbus.
    200. "Air Austral resumes world's longest Airbus A220 flight". IH Aviation and Travel. 7 May 2022.
    201. "The A220 confirms its breakthrough on the small single-aisle market" (Press release). Airbus. 12 July 2022.
    202. Stephen Trimble (29 June 2016). "Breakthrough CSeries gets ready for a 'flawless' EIS". Flightglobal. Archived from the original on 30 June 2016. Retrieved 29 June 2016.
    203. Stephen Trimble (29 November 2016). "Swiss grades CS100 after four months in service". Flight Global. Archived from the original on 29 November 2016. Retrieved 29 November 2016.
    204. Jon Hemmerdinger (9 June 2017). "CSeries advancing, slowly". Flightglobal. Archived from the original on 9 June 2017. Retrieved 12 June 2017.
    205. David Kaminski-Morrow (28 October 2019). "A220 operators told to limit engine thrust at high altitude". Flightglobal. Archived from the original on 30 October 2019. Retrieved 30 October 2019.
    206. "A220 Family–- the story so far" (PDF). Airbus technical magazine. 30 April 2019. Archived (PDF) from the original on 27 May 2021. Retrieved 4 December 2020.
    207. "A220-100 | A220 | Aircraft | Airbus Aircraft". aircraft.airbus.com. 7 October 2021. Retrieved 1 August 2022.
    208. "Type Certificate Data Sheet T0008NY for the CSALP BD-500" (PDF). Federal Aviation Administration. 18 October 2018. Archived (PDF) from the original on 21 November 2018. Retrieved 20 November 2018.
    209. "A220-300 | A220 | Aircraft | Airbus Aircraft". aircraft.airbus.com. 7 October 2021. Retrieved 1 August 2022.
    210. Hardiman, Jake (9 March 2021). "The Airbus A220 Vs The Airbus A319neo - Which Is Better?". Simple Flying. Retrieved 1 August 2022.
    211. "ACJ TwoTwenty". Airbus. Archived from the original on 9 October 2020. Retrieved 7 October 2020.
    212. O'Connor, Kate (13 October 2021). "ACJ TwoTwenty On Schedule For 2023 Debut". AVweb. Retrieved 14 October 2021.
    213. "Aviation Safety Network > ASN Aviation Safety Database > Aircraft type index > Airbus A220-100". Archived from the original on 13 June 2019. Retrieved 22 September 2022.
    214. "Aviation Safety Network > ASN Aviation Safety Database > Aircraft type index > Airbus A220-300". Archived from the original on 13 June 2019. Retrieved 22 September 2022.
    215. David Kaminiski-Morrow (15 October 2019). "Third Swiss A220 failure spurs urgent engine checks". FlightGlobal. Archived from the original on 22 October 2019. Retrieved 6 November 2019.
    216. "Swiss Grounds Airbus A220 Planes After Finding Engine Fault". Industry Week. 15 October 2019. Archived from the original on 10 April 2021. Retrieved 10 April 2021.
    217. "Type certificate data sheet" (PDF). EASA. 29 January 2018. Archived from the original (PDF) on 11 July 2018. Retrieved 11 July 2018.
    218. "Family figures" (PDF). Airbus. June 2020. Archived (PDF) from the original on 27 October 2019. Retrieved 18 December 2018.
    219. "CS100 Factsheet" (PDF). Bombardier. June 2015. Archived from the original (PDF) on 15 October 2017.
    220. "CS300 Factsheet" (PDF). Bombardier. June 2015. Archived from the original (PDF) on 4 March 2016.
    221. "CS100 Airport planning publication" (PDF). Bombardier. 18 October 2018. Archived (PDF) from the original on 27 February 2019. Retrieved 27 February 2019.
    222. "CS300 Airport planning publication" (PDF). Bombardier. 18 October 2018. Archived (PDF) from the original on 27 February 2019. Retrieved 27 February 2019.
    223. "Aircraft Type Designators". ICAO. Archived from the original on 1 October 2017. Retrieved 20 October 2017.
    224. Bombardier Inc. (21 March 2012). "COMAC and Bombardier Sign Definitive Agreement to Establish Commonality Opportunities Between C919 and CSeries Aircraft". Archived from the original on 10 March 2017. Retrieved 13 September 2013.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
    225. Bombardier Inc. (28 August 2013). "Bombardier, IRKUT Entering Exploratory Discussions on Customer Support for the MS-21 Aircraft". Archived from the original on 10 March 2017. Retrieved 13 September 2013.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.