LRT Line 2

The Light Rail Transit Line 2, also known as LRT Line 2 (LRT-2) or Megatren, is a rapid transit line in Metro Manila in the Philippines, generally running in an east–west direction along the Radial Road 6 and a portion of the Circumferential Road 1, referred to as the Purple Line, and previously known as the Mass Rapid Transit Line 2 or MRT Line 2 (MRT-2).[8]

LRT Line 2
A LRTA 2000 class train at V. Mapa station
Overview
StatusOperational
OwnerDepartment of Transportation – Light Rail Transit Authority
Line number2
LocaleMetro Manila & Rizal, Philippines
Termini
  • Antipolo
  • Recto
Stations13[1]
WebsiteOfficial website
Service
TypeRapid transit / Heavy rail
SystemManila Light Rail Transit System
Services1
Operator(s)Light Rail Transit Authority
Depot(s)Santolan, Pasig
Rolling stockLRTA 2000 class[1]
Daily ridership33,267 (2021)[2]
Ridership11.84 million (2021)[2]
History
OpenedApril 5, 2003 (2003-04-05)[1]
Last extensionJuly 5, 2021 (2021-07-05)[3]
Technical
Line length17.6 km (10.9 mi)
Number of tracksDouble-track
CharacterElevated
Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Loading gauge4,300 mm × 3,354 mm (14 ft 1.3 in × 11 ft 0 in)[4]
Minimum radiusMainline: 175 m (574 ft)
Depot: 100 m (330 ft)
Electrification1,500 V DC overhead lines
Operating speed60–70 km/h (37–43 mph)
SignallingWestinghouse fixed block ATC[5][6][7]
Highest elevation45 m (148 ft) at Antipolo station
Maximum incline5%[5]
Average inter-station distance1.28 km (0.80 mi)
Route map

Antipolo
Antipolo
Marikina
Marikina–Pasig
Marikina
Pasig
Santolan
Santolan Depot
Pasig
Marikina
Marikina River
Marikina
Quezon City
Katipunan
Anonas
Quirino Highway - FTI
 NAIA Terminal 3
 MMS 
Araneta Center–Cubao
3
North Avenue - Taft Avenue
Betty Go-Belmonte
Gilmore
4
Quezon City
San Juan
J. Ruiz
San Juan
Quezon City
San Juan River
V. Mapa
FTI / Alabang / Calamba
Pureza
Legarda
University Avenue
8
Recto
Doroteo Jose
Roosevelt - Baclaran - Niog
Valenzuela - Gov. Pascual
approved
extension
Tutuban
Divisoria
Pier 4

Although the line is operated by the Light Rail Transit Authority, resulting in it being called as "LRT-2", it is actually a heavy rail, rapid transit line. Instead of the light rail vehicles used in earlier lines, it uses very large metro cars, longer and wider than those used on the PNR network, and roughly the same size as those used on the MTR in Hong Kong, MRT in Bangkok and Singapore, and the heavy metro lines of the Taipei Metro. Until the opening of MRT Line 7 (MRT-7) in 2022 and the Metro Manila Subway (MMS) in 2025, it is the country's only line using these types of trains.[8]

Envisioned in the 1970s as part of the Metropolitan Manila Strategic Mass Rail Transit Development Plan, the thirteen-station, 17.6-kilometer (10.9-mile)[9] line was the third rapid transit line to be built in Metro Manila when it started operations in 2003. It is operated by the Light Rail Transit Authority (LRTA), a government-owned and controlled corporation attached to the Department of Transportation (DOTr).

Serving close to 200,000 passengers daily before the COVID-19 pandemic in the country, the line is the least busy among Metro Manila's three rapid transit lines, and was built with standards such as barrier-free access and the use of magnetic card tickets to facilitate passenger access in mind. Total ridership however is significantly below the line's built maximum capacity, with various solutions being proposed or implemented to increase ridership in addition to the planned extensions to the line. However, the short-term solutions have had a minimal effect on ridership, and experts have insisted that the extensions be built immediately, despite pronouncements that the system is steadily increasing ridership each year. Regardless, the line encounters periods of peak ridership during rush hour in the morning and the evening.

The line is integrated with the public transit system in Metro Manila, and passengers also take various forms of road-based public transport, such as buses and jeepneys, to and from a station to reach their intended destination. Although the line aimed to reduce traffic congestion and travel times along R-6 and portions of C-1, the transportation system has only been partially successful due to the rising number of motor vehicles and rapid urbanization. Expanding the network's revenue line to accommodate more passengers is set on tackling this problem.

When the line's east extension to Antipolo, Rizal opened on July 5, 2021, Line 2 became the first rapid transit line extending outside the Metro Manila area.[3]

Future plans include a three-station westbound extension in the City of Manila by 2024[10] and another proposed eastbound extension from Antipolo station in Masinag towards Cogeo and downtown Antipolo.[11]

Route

A train approaching Katipunan

The rail line serves the cities that Radial Road 6 (Marcos Highway, Aurora Boulevard, Ramon Magsaysay Boulevard, Legarda Street and Recto Avenue) passes through: Manila, San Juan, Quezon City, Marikina, Pasig (depot), and Antipolo. The rails are mostly elevated and erected either over or along the roads covered, with sections below ground before and after the Katipunan station, the only underground station on the line.

Stations

The line serves 13 stations along its 17.6-kilometer (10.9-mile) route.[2] The western terminus of the line is the Recto station at Recto Avenue, while the eastern terminus of the line is the Antipolo station along Marcos Highway.

Three stations serve as connecting stations between other lines in the metro. Pureza is within walking distance to the Santa Mesa station of the PNR Metro Commuter Line; Araneta Center–Cubao is indirectly connected to the station of the same name on the MRT Line 3 through local streets and inter-connected mall passageways inside Araneta City (formerly Araneta Center); and Recto is indirectly connected to the Doroteo Jose station of the LRT Line 1 through a covered walkway. No stations are connected to other rapid transit lines within the paid areas.

List of stations
Name Distance (km) Connections Location
Between
stations
Total
Unnamed Station 3 (Cogeo) Antipolo, Rizal
Unnamed Station 2
Unnamed Station 1
Antipolo 0.000
Bus routes
  •  9  Masinag
Marikina–Pasig 2.232 2.232
Bus routes
  •  9  Sta. Lucia East Grand Mall
Marikina / Pasig
Santolan 1.795 4.027
Bus routes
  •  9  SM City Marikina
    BFCT East Metro Manila Transport Terminal
Pasig
Katipunan 1.970 5.997
Bus routes
  •  8   9  Katipunan
Quezon City
Anonas 0.955 6.952
Manila MRT
  •  MMS  Anonas
Bus routes
  •  8   9  Anonas
Araneta Center–Cubao 1.438 8.390
Manila MRT
  • 3 Araneta Center–Cubao
EDSA Carousel
  •  E  Cubao
Bus routes
  •  8   9   10  Araneta Center–Cubao
    Araneta City Bus Port
Betty Go-Belmonte 1.164 9.554
Bus routes
  •  10  Betty Go-Belmonte
Gilmore 1.075 10.629
Manila MRT
  • 4 N. Domingo
Bus routes
  •  10   11  Gilmore
J. Ruiz 0.928 11.557
Bus routes
  •  10  J. Ruiz
San Juan
V. Mapa 1.234 12.791
Bus routes
  •  10  V. Mapa
Manila
Pureza 1.357 14.148
  PNR
  • Santa Mesa
Bus routes
  •  10  Pureza
Pasig River Ferry Service
  • PUP Ferry Station
Legarda 1.389 15.537
Bus routes
  •  10  Legarda
Recto 1.050 16.587
  • Doroteo Jose
Manila MRT
  • 8 Lerma
Bus routes
  •  10  Recto
Tutuban
  PNR
  •  NSCR  Tutuban
Divisoria none
Pier 4
Ferry services
  • North Port Passenger Terminal
Bus routes
  •  2  Recto Avenue
Stations, lines, and/or other transport connections in italics are either under construction, proposed, unopened, or have been closed.

Operations and services

The line currently runs from 5:00 a.m. PST (UTC+8) until 9:30 p.m. on a daily basis.[12] It operates almost every day of the year unless otherwise announced. Special schedules are announced via the PA system at every station and also in newspapers and other mass media. During Holy Week, a public holiday in the Philippines, the rail system is closed for annual maintenance, owing to fewer commuters and traffic around the metro. Normal operation resumes on Monday.[13] During the Christmas and year-end holidays, the operating hours of the line are modified and shortened, due to the low ridership of the line during the holidays.[14]

History

A eastbound train on the viaduct near Marikina River.
J. Ruiz station platform area
A westbound LRTA 2000 class EMU with wrap advertising at Anonas.

Planning and early delays

During the construction of the first line of the Manila Light Rail Transit System in the early 1980s, a Swiss company called Electrowatt Engineering Services designed a comprehensive plan for metro service in Metro Manila. The plan—still used as the basis for planning new metro lines—consisted of a 150-kilometer (93-mile) network of rapid transit lines spanning all major corridors within 20 years, including a line on the Radial Road 6 alignment, one of the region's busiest road corridor.

A feasibility study for the LRT Line 2 that would connect Marikina to the City of Manila via Aurora Boulevard and Ramon Magsaysay Boulevard was carried out in 1988.[15] The project was to be bid out as a build-operate-transfer project together with the LRT Line 1 capacity expansion project in 1989.[15] Although sixteen firms were reported to have submitted bids for the line's construction,[16] the bidding failed, causing delays.[15] Another feasibility study was conducted in 1991 with financing from the Overseas Economic Cooperation Fund (OECF). The final revised project was approved in 1995 as a separate project from the LRT-1 capacity expansion project.[15]

Construction and opening

The LRT Line 2 project officially began in 1996, twelve years after the opening of Line 1, with the granting of the official development assistance loans from the Japan Bank for International Cooperation[17] for the line's construction starting in March of that year.[18] The LRTA would have ownership of the system and assume all administrative functions, such as the regulation of fares and operations as well as the responsibility over construction and maintenance of the system and the procurement of spare parts for trains.

Construction started in 1997 after the LRTA signed the first three packages of the agreement with Sumitomo Corporation delivering Package 1 in which covers the construction of the depot and its facilities,[19] while the Hanjin-Itochu joint venture delivered packages 2 and 3 in which covers the substructure and the superstructure plus the stations respectively.[20][21]

The project suffered delays in 1998 when the fourth package of the project, which includes the communications and fares systems, vehicles, and trackworks, were alleged to had irregularities with the contract.[22] In September 2000, Package 4 was awarded to the Asia-Europe MRT Consortium (AEMC), a consortium of local and foreign companies led by Marubeni Corporation and composed of Balfour Beatty, Toshiba, Daewoo Heavy Industries, and a local company which was D.M. Consuji Incorporated (DMCI).[23][17][24] AEMC, through Marubeni Corporation, entered into a contract with Singapore Technologies Engineering on December 12 of that year to supply and install the communications system, supervisory control and data acquisition (SCADA) system, automatic fare collection system, and the management information system.[25] The consortium provided the eighteen four-car trainsets built by Rotem and Toshiba.

During construction, the LRTA, along with the project consultants oversaw all the design, construction, equipping, testing, commissioning, and technical supervision of the project activities. Halcrow was appointed in 1997 as the lead consultant for the project.[26]

The pre-casting segmental method, a method used to launch girders and connect them to create a full span, was used in the construction of the original 13.8-kilometer (8.6-mile) line (except the 700-meter (2,296-foot-7-inch) underground section in Katipunan).[5][4][27]

On April 5, 2003, the first 4.3 kilometers (2.7 miles) of the line,[28] which forms part of the line's first phase, from Santolan to Araneta Center-Cubao was inaugurated by President Gloria Macapagal Arroyo.[27] In December 2003, a test run from Araneta Center-Cubao to V. Mapa with passengers was conducted. Due to the absence of seamless interconnection between the initial section and the section beyond Araneta Center-Cubao, westbound passengers alighted at Cubao station before riding a train to V. Mapa. An estimated 3,000 passengers took the ride during the three-day test run.[29] All remaining stations that are part of the line's second phase opened on April 5, 2004,[27] except for Recto which opened on October 29, 2004.[30][31] However, ridership was initially moderate yet still far below expectations, since the passenger volume in this line is not yet fully achieved.[18]

To address passenger complaints on the lack of universal access on earlier train lines, the LRTA made sure during the construction phase that the stations were equipped with universal access by putting up escalators and elevators for easier access, as well as making passenger fares at par with the other existing lines. However, while all stations have elevators to and from the platform, not all stations have elevators to and from the station concourse on both sides of the road.

East extension

Antipolo station, the line's eastern terminus

Plans to extend the line to Antipolo were first laid out as part of Metro Manila Urban Transportation Integration Study Master Plan by the Japan International Cooperation Agency (JICA) in 1999.[32] The extension was first approved by the Investment Coordination Committee (ICC) board of the National Economic and Development Authority (NEDA) in October 2003.[33][34] The Light Rail Transit Authority announced its intention to extend the line eastward to Antipolo in 2006.[35] The project aims to accommodate an additional 80,000 passengers and reduce traffic congestion along Marcos Highway.[36]

The Light Rail Transit Authority secured funds for the project from Philippine banks in May 2011.[37] In October 2011, the Japan International Cooperation Agency released a feasibility study report for the project.[4] The extension, starting from the eastern terminus of Santolan Station up to Antipolo station in Antipolo, calls for two additional stations, Marikina station in Barangay San Roque, Marikina near Sta. Lucia East Grand Mall; and Antipolo station, in Barangay Mayamot, Antipolo near SM City Masinag. The ₱9.7 billion project, at its current form, was approved by the National Economic and Development Authority chaired by then-President Benigno Aquino III on September 4, 2012.[38] The civil works packages was funded by the Philippine government, while the electro-mechanical system package was funded by a loan from the Japan International Cooperation Agency as part of its Capacity Enhancement of Mass Transit Systems in Metro Manila Project, wherein JICA allotted ¥43.2 billion for various extension and capacity expansion projects of railway lines in Metro Manila.[39][40]

Before construction started, the Department of Transportation and Communications (DOTC) awarded a civil works consultancy contract to the Korean consortium of Foresight Development and Surveying Company, Soosung Engineering, and Korea Rail Network Authority in February 2014. The electrical and mechanical (E&M) systems consultancy contract was awarded to the CMX consortium, a consortium of Filipino and Japanese companies in March 2015. Both consortiums oversaw the design and construction of the project, and provided bidding assistance and technical supervision.[41][42]

The civil works packages, Packages 1 and 2, covered the design and construction of the viaduct and stations, respectively. Both packages were awarded to D.M. Consunji Incorporated (DMCI).[43][44] Package 3, awarded to the Marubeni-DMCI consortium, covers the design and installation of the railway tracks and electrical and mechanical (E&M) systems of the extension.[45]

The groundbreaking ceremony was held on June 9, 2015 to mark the start of construction of the extension.[46] Another groundbreaking ceremony was held on May 30, 2017 to mark the start of construction of the two stations.[44] The installation of the railway track and E&M systems, meanwhile, commenced on April 16, 2019.[47]

During construction, on March 10, 2017, a truck slammed in a concrete post of the east extension viaduct, causing one fatality and two injuries.[48]

Unlike the original line which used the pre-casting segmental method of construction, the east extension viaduct made use of AASHTO girders with a deck slab above the girders.[4]

The east extension was originally expected to be completed in the fourth quarter of 2020. However, construction delays brought by the COVID-19 pandemic delayed the extension's opening. As such, the extension was initially set to be inaugurated on April 26, 2021[49] and was expected to begin operations the following day,[50] however, the opening day was delayed twice due to increased COVID-19 case spikes since March 2021[51] and to give time for work completion brought by technical considerations in integrating the two new stations to the railway's existing systems since June 2021.[52]

After series of delays in the extension's opening, the 3.8-kilometer (2.4-mile) extension opened on July 5, 2021 after being inaugurated on July 1 by President Rodrigo Duterte.[3][53] The Department of Transportation and Light Rail Transit Authority offered free rides for the East Extension stations until July 18, 2021.[39] From July 5 to September 2, 2021, a temporary shuttle service was implemented between Santolan and Antipolo stations due to ongoing integration works of the signalling system at that time.[54][55] However, on the opening day of the extension, various inconveniences were reported by passengers along the extension. There was only one shuttle train servicing passengers in the east extension, causing waiting times that can reach as long as 20 to 30 minutes. The passengers also cited the lack of trains in the line.[56] Seamless end-to-end train services between Antipolo and Recto stations and vice versa begun on September 3, 2021, after integration works were completed.[lower-alpha 1]

LRT Line 2 is planned to be further extended eastward up to Cogeo, and the Antipolo city government is very supportive of the project.[59]

Station facilities, amenities, and services

Bridge linking the Recto to the nearby Doroteo Jose

With the exception of Katipunan station, all stations are above ground.

Station layout and accessibility

Stations have a standard layout, with a concourse level and a platform level. The concourse is usually below the platform except for the underground station, with stairs, escalators and elevators leading down to the platform level. The levels are separated by fare gates. All stations are barrier-free inside and outside the station, and trains have spaces for passengers using wheelchairs.

The concourse contains ticket booths. Some stations, such as Araneta Center-Cubao, are connected at concourse level to nearby buildings, such as shopping malls, for easier accessibility.

Stations either have island platforms, such as Santolan, or side platforms, such as Gilmore and Recto. Part of the platform at the front of the train is cordoned off for the use of pregnant women, children, elderly, and persons with disabilities. At side-platform stations, passengers are able to switch platforms at the concourse level without leaving the closed system, while passengers can easily switch sides at stations with island platforms. Stations have toilets at the concourse level, both inside and outside the closed system.

Most station platforms have a length of 100 meters (330 feet) and a width of 3.5 to 4.5 meters (11 to 15 feet), with some stations having a length of 120 to 150 meters (390 to 490 feet).[5]

As of November 8, 2009, folding bicycles are allowed to be brought into trains provided that it does not exceed the LRTA's baggage size limitations of 2 by 2 feet (20 by 20 in).[60] The last car of each train are also designated as "green zones", where folding bicycle users can ride with their bikes.[61]

The line has a total of 72 escalators and 40 elevators across all 13 stations.[62] However, by 2021, only a few elevators and escalators remain operational due to anomalies and corruption involving the procurement contracts,[63][64] causing complaints from passengers.[9] The elevators and escalators are being repaired and restored since 2022,[65] and more are being repaired and restored as of April 2022.[62]

Shops and services

Inside the concourse of all stations is at least one stall or stand where people can buy food or drinks. Stalls vary by station, and some have fast food stalls. The number of stalls also varies by station, and stations tend to have a wide variety, especially in stations such as Recto and V. Mapa.

Stations such as Recto and Santolan are connected to or are near shopping malls and/or other large shopping areas, where commuters are offered more shopping varieties.

In cooperation with the Philippine Daily Inquirer, passengers are offered a copy of the Inquirer Libre, a free, tabloid-size, Tagalog version of the Inquirer, which is available from 6 a.m. at all stations.

Safety and security

The line has always presented itself as a safe system to travel in, which was affirmed in a 2004 World Bank paper prepared by Halcrow describing the overall state of metro rail transit operations in Manila as being "good".[15]

With an estimated pre-pandemic daily ridership of 200,000 passengers, and a current weekday ridership of 50,000 passengers, the line operates significantly below its designed capacity of between 570,000 and 580,000 passengers per day. Operating under capacity since 2004,[66] government officials have admitted that system extensions are overdue, although in the absence of major investment in the system's expansion, LRTA has resorted to experimenting with and/or implementing other solutions to maximize the use of the system, including having bus feeder lines.[67]

For safety and security reasons, persons who are visibly intoxicated, insane and/or under the influence of controlled substances, persons carrying flammable materials and/or explosives, persons carrying bulky objects or items over 1.5 meters (4 ft 11 in) tall and/or wide, and persons bringing pets and/or other animals are prohibited from entering the line. Products in tin cans are also prohibited, citing the possibility of home-made bombs being concealed inside the cans.[68]

In response to the Rizal Day bombings and the September 11 attacks, security has been stepped up on board. The Philippine National Police has a special police force,[69] and security police provided by private companies can be found in all stations. All stations have a head guard. Some stations may also have a deployed K9 bomb-sniffing dog. The line also employs the use of closed-circuit television inside all stations to monitor suspicious activities and to assure safety and security aboard the line. Passengers are also advised to look out for thieves, who can take advantage of the crowding aboard the trains. Wanted posters are posted at all stations to help commuters identify known thieves.

COVID-19 measures

As a response to the COVID-19 pandemic, the line operated at a limited capacity when public transport operations resumed on June 1, 2020 after a three-month lockdown that halted the operations of public transport.[70] The use of face masks (and later, face shields) became mandatory since the resumption of operations in June 2020. The use of face shields later became no longer mandatory in public transport in November 2021, except when an area is under the two highest levels of the alert level system.[71] Social distancing measures were also implemented. Since March 1, 2022, all railway lines are operating at a full capacity due to the de-escalation of Metro Manila to the lowest of the five levels of the alert level system.

In addition, talking with other passengers and answering phone calls in trains has been prohibited in the system. The policy has also been implemented in all railway lines and forms of public transport.[72]

The trains are regularly being disinfected when the train arrives at a terminus. It takes three to five minutes for a train to be disinfected.[73]

Ridership

The line is designed and was forecasted to carry 570,000 passengers daily.[18] However, the line operates under its designed capacity. Before the pandemic, the line had a ridership of 200,000 passengers, but the ridership soon decreased in 2019 due to lack of trains and a power trip that closed three stations in October 2019 that was reopened in January 2021. The line served 33,267 passengers daily on average in 2021,[2] with eight trains available for revenue service running at an operating speed of 60 to 70 kilometers per hour (37 to 43 miles per hour) in 10 minute intervals.[74]

Statistics

Year Daily Average[75] Yearly Total[75]
2003 9,221 2.36 million[76]
2004 61,337 23.03 million
2005 116,082 41.90 million
2006 132,154 47.57 million
2007 147,032 52.93 million
2008 161,846 58.59 million
2009 171,996 62.09 million
2010 175,501 63.36 million
2011 176,818 63.81 million
2012 194,268 70.33 million
2013 197,924 71.45 million
2014 201,794 72.85 million
2015 172,318 62.21 million
2016 185,071 67.00 million
2017 182,708 65.96 million
2018[77] 177,260 64.70 million
2019[78] 156,110 56.98 million
2020[2] 45,463 12.50 million
2021[2] 33,267 11.84 million

Fares and ticketing

The line, like all existing lines in Metro Manila, uses a distance-based fare structure, with fares ranging from fifteen to thirty pesos (34 to 60 U.S. cents), depending on the destination. Commuters who ride the line are charged ₱11 upon boarding. An additional ₱1 is charged for every kilometer travelled. For single journey ticket users, the fares are rounded up in multiples of ₱5.00. Meanwhile, the fares for Beep card users are rounded up to the nearest peso.[79] Children below 1.02 meters (3 ft 4 in) (the height of a fare gate) may ride for free.

Fares are free of charge every March 8 (International Women's Day; free rides exclusive for women),[80] June 12 (Independence Day),[81] and December 30 (Rizal Day) on limited time slots.[82]

The line, along with the MRT Line 3 and Philippine National Railways lines also offered free rides to students starting July 1, 2019,[83] but students must register to avail a student pass.[84] However, the free rides for students stopped in 2020 due to the COVID-19 pandemic as distance learning was implemented as a mode of learning during the pandemic. With the shift towards the return of physical face-to-face classes, the free rides for students are expected to return once classes for the incoming school year starts on August 22, 2022,[85] with the free rides only limited to the LRT Line 2.[86]

Magnetic tickets (20032015)

Four types of tickets exist: a single-journey (one-way) ticket whose cost is dependent on the destination, a stored-value (multiple-use) ticket for 100 pesos, a discounted stored value ticket (multiple-use) which can only be availed by senior citizens and disabled persons, and a single journey ticket for employees (one-way) which is exclusive for LRTA employees only. The single-journey ticket and the single journey ticket for employees is valid only on the date of purchase. Meanwhile, the stored-value ticket and the discounted stored-value ticket is valid for four years from date of purchase.

Tickets come in four incarnations: one bearing the portrait of Gloria Macapagal Arroyo, which have since been phased out, although some tickets have been recycled due to ticket shortages, one with the Line 1 third generation train inauguration together with Japanese Prime Minister Shinzo Abe, one with the LRT-MRT closing the loop project design with Gloria Macapagal Arroyo again in the picture, and one with a picture of the Hyundai Rotem EMUs used in the line which featured different designs for the single journey and stored value tickets with the former having a picture of the train unloading, while the latter is a flipped concept art of the train.

In the past, Line 3 borrowed tickets from LRTA rather than recycling the old "Erap tickets", due to the same ticket shortages.[87]

Despite the common practice for regular passengers to purchase several stored-value tickets at a time, the line barely has ticket shortages due to the inter-compatibility of tickets with the LRTA lines and the steady release of new tickets that addresses the problem.

Although the LRTA, together with Line 3 has experimented with the Flash Pass as an alternative ticketing system in the past, this was phased out in 2009.

Beep cards (2015present)

A unified ticket system was introduced in 2015 to replace the magnetic tickets. The Beep is a new contactless smart card to replace the old magnetic tickets. Similar to the previous magnetic tickets, the Beep cards have two types: single-journey tickets and stored value cards. The tickets can be bought at any stations or at the ticket vending machines. A trial run for the Beep cards started on July 20, 2015 at Legarda station, becoming the first of the three railway lines in Metro Manila to do so.[88]

A shortage of the stored value cards was reported in 2022 due to the ongoing global chip shortage caused by the Russian invasion of Ukraine.[89][90]

Fare adjustment

Adjusting passenger fares has been employed by the LRTA as a means to boost flagging ridership figures, and the issue of fares both historically and in the present continues to be a political issue.

Current fare levels were set on July 19, 2021, two weeks after the east extension opened.[91] It is a 5-peso fare increase from the maximum fare that was set along with the new fare levels on January 4, 2015. The fare hike was delayed for several years despite inflation and rising operating costs. Prior to the 2015 fare adjustment of LRT and MRT, fares for the line were never increased.[92] These lower fares—which are only slightly more expensive than jeepney fares—are financed through large government subsidies amounting to around ₱45 per passenger,[93] and which for both the MRTC and the LRTA reached ₱75 billion between 2004 and 2014. Without subsidies, the cost of a single trip is estimated at around ₱60.[93]

Rolling stock

Interior of a 2000 class train

The line runs heavy rail vehicles made in South Korea by Hyundai Rotem powered by Toshiba-made VVVF inverters in a four-car configuration.[28] The trains came in together with the fourth package during the system's construction. Trains have a capacity of 1,628 passengers, which is more than the normal capacity of the rolling stock of Lines 1 and 3. The trains are capable to run at a maximum design speed of 80 km/h (50 mph), but only run at a maximum operational speed of 60 to 70 km/h (37 to 43 mph), though a portion of the line has an operational speed of 30 kilometers per hour (19 miles per hour).

Trains in the line prominently use wrap advertising.

In 2017, the entire train fleet was retrofitted with the TUBE (formerly known as PARDS), a passenger information system powered by LCD screens installed near the ceiling of the train that shows news, advertisements, current train location, arrivals and station layouts.[94]

In 2019, the train ventilation was upgraded to replace the aging air-conditioning units and to alleviate complaints of the commuters for uncomfortable hot rides.[95] Two years later, three train sets underwent refurbishment and resulted in new fitted propulsion systems and train monitoring systems from Woojin Industrial Systems.[96]

The LRTA is also acquiring 14 additional train sets by 2020 to augment the existing 18 sets, due to the expected increase of passengers ahead of the East Extension, and the West Extension.[97] The purchase however was delayed to 2022.[98]

Included in the design-and-build contract of the west extension is the procurement of five four-car train sets.[99]

Rolling stock First-generation[100][4][101]
Image
Year 2003
Manufacturers Hyundai Rotem / Toshiba
Model 2000 class
Number built (cars) 72 built (32 cars in service,[102]
40 cars out of service)
Train length 93.2 m (305 ft 9 in)
Car length 23.3 m (76 ft 5 in) (22.5 m (73 ft 10 in) without couplers)
Width 3.2 m (10 ft 6 in)
Height (pantograph lowered) 4.1 m (13 ft 5 in)
Floor height 1.1 m (3 ft 7 in)
Body material Stainless steel and LAHT steel
Ventilation Roof-mounted air-conditioning units
Tare weight 41 t (90,000 lb) in head cars, 39.05 t (86,100 lb) in intermediate cars
Axle load 16.85 t (37,100 lb)
Maximum gradient 5%
Configuration Mc-M-M-Mc
Capacity 1,628 passengers (232 seated, 1,396 standing at 7 passengers per m2)[4]
Doors 1.4 m (4 ft 7 in) wide; pocket-type; 5-doors/side
Drive unit Gear coupling (WN) Drive
Traction control IGBT-VVVF
Traction motor 120 kW (160 hp) 3-phase AC induction motor
Traction power 1,500 V OCS; single-arm pantograph
Top speed 80 km/h (50 mph)
Status In service

Depot

The line maintains an at-grade depot in Barangay Santolan in Pasig, near Santolan station in the side of Barangay Calumpang in Marikina. The depot occupies approximately 10 hectares (25 acres) of space and serves as the headquarters for light and heavy maintenance of the line.[26] Due to its location in a flood-prone area, the depot was raised 2 meters (6.6 feet) above ground level.[26] It is connected to the mainline network by a spur line.

The depot is capable of storing 24 sets of electric multiple units, with the option to expand to include more vehicles as demand arises. They are parked on several sets of tracks, which converge onto the spur route and later on to the main network.[101]

There are eight decommissioned 1000 class and one set of 1100 class trains formerly used in LRT-1 being stored in this depot due to the ongoing expansion of the Line 1 depot in Parañaque.

Other infrastructure

Signalling

The line uses a fixed block system with automatic train control (ATC), which has three subsystems: automatic train protection (ATP), automatic train operation (ATO), and Rail9000 automatic train supervision (ATS). The ATO subsystem automatically drives the trains, while the opening and closing of doors is controlled by an onboard train attendant. The ATP system, meanwhile, maintains safe operations and monitors the train's speed. Lastly, the Rail9000 ATS system is located at the operations control center at the line's Santolan Depot, which directs train operations and monitors the train movement along the line.[5] Other components of the signalling system includes train detection through track circuits and Westrace MK1 computer-based interlocking.[7][101]

The signalling equipment were manufactured by Westinghouse Signals. Westinghouse Signals, later renamed as Westinghouse Rail Systems, became part of Siemens Mobility after its acquisition by Siemens in 2013.[6]

The signalling system is set to be upgraded with the replacement of the system's communication link and the upgrading of the interlocking module. The project started on February 15, 2022.[103]

Tracks

The rails are 54-kilogram-per-meter (36-pound-per-foot) rails designed to the UIC 54 rail profile. The rails are supported by concrete plinths.[4][104]

Plans and proposals

West extension

A 3.02-kilometer (1.88-mile) extension of the line to the Manila North Harbor in Tondo, Manila has been proposed. It was first announced in August 2006, when the LRTA announced its intention to extend the line eastward to Antipolo and westward to the Pier 4 of the Manila North Harbor.[35] It was approved by the National Economic and Development Authority (NEDA) on May 19, 2015. The construction of this extension would create three stations, one near the Tutuban PNR station, one in Divisoria, and one near the North Port Passenger Terminal in Manila North Harbor's Pier 4 which would serve as its terminus.[105] In an interview, LRTA Administrator Ret. Gen. Reynaldo Berroya stated that they are aiming to finish the project by 2022 to 2023.

The total project cost is estimated to be ₱10.12 billion.[106] In 2019, WESTRAX Joint Venture was awarded the contract for the consultancy services for the project.[10]

In October 2019, the project was under bidding process, consisting 3 stations, Tutuban, Divisoria, and Pier 4, with the project scheduled to be completed by 2024.[10]

On August 27, 2020, the Light Rail Transit Authority published the bidding documents for the design-and-build contract for the west extension. According to the documents, the turn back area after the Pier 4 station will have three tracks; two of which are the main tracks and one serves as a pocket track. The three stations will feature side platforms.[99]

The project was originally planned to be funded through a public-private partnership (PPP) scheme, in line with the Marcos administration's policy to use the said scheme to complete various infrastructure projects. The contract would have also covered the procurement of five new four-car trains, along with the maintenance of the line and the refurbishment of the trains.[106] However, it was decided that the government will instead fund the project through the national budget.[107]

Extension to Cogeo

The Japan International Cooperation Agency has also proposed for a second phase of the east extension to extend the line to Cogeo and downtown Antipolo. There are provisions at the end of the current rail line at Antipolo station for an extension. Two proposals were presented by JICA: a 3-kilometer (1.9-mile), one-station underground extension, and a 6-kilometer (3.7-mile), five-station extension, both originating from the Antipolo station.[11]

As of November 2022, the feasibility study is nearing its conclusion. The extension would have three stations and the alignment is still being finalized.[107]

Privatization

The privatization of the operations and maintenance of Line 2 was planned by the then-Department of Transportation and Communications (DOTC; later the Department of Transportation as part of the agency's improvement and modernization of the railway lines in the Philippines. The bidding process for this project begun on September 13, 2014.[108] In this project, the interested companies were required to submit pre-qualification documents and submit a bid proposal if the company is qualified for the bidding. In January 2015, four companies submitted pre-qualification documents for the project. The bidders included Aboitiz Equity Ventures with SMRT Transport Solutions (Aboitiz Equity Ventures and SMRT International Pte Ltd. through SMRT Trains),[109] DMCI Holdings with Tokyo Metro, Light Rail Manila 2 Consortium (RATP and Metro Pacific),[110] and San Miguel Corporation with Korea Railroad Corporation. All bidders were pre-qualified for the bidding.[111] However, the project would eventually be shelved in 2016.

In 2017, it was reported that the Metro Pacific Investments Corporation was interested in a possible auction for the privatization of the line.[112] The plan to privatize the operations and maintenance of the line was restarted in October 2019, following a power trip that damaged two rectifiers.[113] Since then, no new reports have surfaced about this plan as of 2021.

Capacity expansion and upgrade

Due to the aging of the line, a capacity expansion project for the line was announced in April 2022. The project would include upgrades to the trains, signalling, telecommunications, power supply, overhead systems, railway tracks, and other system equipment. The project is still under the stages of the procurement of a consultant for the project, which would assess the current condition of the line.[114]

TÜV Rheinland has been shortlisted for the list of consultants and is the only consultant to be shortlisted in June 2022.[115]

Like the west extension, the upgrading of the train cars would be funded through a public-private partnership scheme. The contract would also cover the maintenance of the line and the construction of the west extension.[106]

Incidents

2000s

  • On July 12, 2006, at 7:30 AM, a lightning struck the power cables near the Santolan station, interrupting train operations.[116]
  • On August 15, 2006, at 8:45 AM, a lightning struck the power cables, which is the second incident reported in a month.[116] Normal operations were restored before 12:00 noon.[117]
  • On May 20, 2008, at 6:45 PM, a lightning struck the line's power supply, interrupting operations.[118]
  • On July 23, 2008, a power interruption disrupted the line operations, leaving the Santolan-Cubao section only operational.[119]

2010s

  • On June 11, 2011, a man jumped in front of a moving train at the Araneta Center-Cubao station, leaving the man severely injured. This forced the line operations to be suspended.[120][121]
  • On May 9, 2017, at 4:03 PM, a tree fell to the tracks at the Anonas area, causing the line's operations to be disrupted and a 2000 class train nearby was hit. The Department of Public Works and Highways local office was doing roadworks at the site of the incident when they accidentally hit a tree that fell on the tracks. Partial operations between Recto and V. Mapa were implemented, until the line's operations were suspended an hour later. The incident area was cleared and full operations resumed at 7:41 PM.[122]
  • On May 30, 2018, a damaged cable between J. Ruiz and V. Mapa stations caused limited operations between Santolan and Araneta Center-Cubao stations at 11:46 AM. Normal operations resumed at 7:46 PM.[123]
  • On May 15, 2019, at 7:27 PM, an air pressure glitch halted the operations of Line 2. Operations resumed at 7:47 PM.[124]
  • On May 18, 2019, trainset no. 13 broke down between Anonas and Katipunan stations at 2:00 PM and was subsequently moved to the pocket track of Anonas waiting to be towed back to the depot. However at 9:15 PM, the train was reported to have moved on its own towards the eastbound track going towards Santolan station. At this time, trainset no. 18 was going towards Santolan station from Cubao station on the same track. The runaway train was reported via radio but eventually ran into train No. 13, injuring 34 passengers, with none in critical condition. The driver of one of the two trains was reported to have jumped out of his train before the collision, sustaining wounds and bruises.[125][126] Revenue operations were suspended to give way to maintenance checks, and normal operations resumed at 10:47 AM the next day.[127] Trainset no. 18 returned to service in June 2021,[128] while Trainset no. 13 returned to service in September 2021.
  • On October 2, 2019, at 9:43 am, a lightning struck the Gilmore station, causing the power transformers at the J. Ruiz and Araneta Center-Cubao stations to trip and disrupt the power supply. The operations of the line were suspended for safety checks and normal operations resumed at 10:11am.[129]
  • On October 3, 2019, another power trip caused rectifier substations located between Anonas and Katipunan stations and in the Santolan depot to catch fire at around 11 in the morning, cutting the line's power supply in the area. Line operations from Recto to Santolan were suspended at 11:24 am, and passengers were evacuated from the line with no injuries. The LRTA, MMDA and the Philippine Coast Guard immediately deployed shuttle buses to help ferry stranded passengers. Partial operations between Cubao and Recto stations resumed on October 8, 2019, while Santolan, Katipunan and Anonas Stations are expected to reopen after nine months. The initial estimated amount of damages is at around PHP428 million.[130] Due to the incident, the Light Rail Transit Authority claimed full operations would be back in 2 to 3 months.[131] As the initial deadline was not met the three stations that were caught in a power trip were expected to resume services at the end of June 2020.[132] However, this deadline was also not met due to delays brought by the COVID-19 pandemic, rescheduled for the first quarter of 2021.[133] Finally, the three stations were reopened, albeit in partial speed, on January 22, 2021.[36] The reopening was made possible by a temporary power supply system installed in the damaged portion while the proper systems are still on order and awaiting delivery.

2020s

  • On October 8, 2020, a fire broke out in the electrical room at Santolan causing the operations to be suspended at 5:10am. The fire damaged the station's uninterruptible power supply. Normal operations returned a few hours later.[134][135]
  • On April 7, 2021, the operations of the LRT-2 were halted due to an unspecified "technical problem." Normal operations resumed at 10:50 AM.[136]
  • On May 24, 2021, an unspecified technical problem at Santolan station limited the LRT-2 operations between Recto and Araneta Cubao stations. Full operations resumed the following day.[137]
  • On June 17, 2021, a technical problem at the line's control center halted the LRT-2 operations. Normal operations resumed at 4:59pm.[138]
  • On August 16, 2021, operations were suspended between Cubao and Santolan due to an unspecified technical problem. Operations resumed at 4:20pm.[139]
  • On September 17, 2021, a defective catenary wire at the east extension area caused disruptions in operations. A shuttle service between Santolan and Antipolo was implemented at 9:43 AM. On the same day, the line's operations were briefly suspended at 11:36 AM after a tangled t-shirt was seen hanging at the contact wires between Cubao and Anonas stations. Operations with the shuttle service resumed at 11:49 AM, while full end-to-end operations were known to be resumed the following day.[140]
  • On October 9, 2021, an entangled balloon was discovered between V. Mapa and Pureza stations, causing the line's operations to be temporarily suspended. The operations resumed after 30 minutes.[141]
  • On November 3, 2021, operations of Line 2 were suspended at 6:00 AM due to a signalling system problem.[142] Operations resumed at 7:57 AM.[143]
  • Multiple signalling system problems were reported on November 6,[144] 14,[145] and 25, 2021.[146]
  • On July 31, 2022, at 8:00 a.m., operations of Line 2 were limited from Cubao to Antipolo stations due to a broken catenary wire between Legarda and Pureza stations. Full operations resumed the following day at 5:00 a.m.[147]

Notes

  1. The date when the end-to-end operations between Antipolo and Recto and vice versa began varies per source. According to LRTA, it began on September 3, 2021.[57] Meanwhile, news outlets state that end-to-end services begun on September 7, 2021.[58]

References

  1. "The Line 2 System". Light Rail Transit Authority. Archived from the original on October 11, 2014. Retrieved June 10, 2014.
  2. YEAR-END ACCOMPLISHMENT REPORT (PDF) (Report). Light Rail Transit Authority. December 31, 2021. Retrieved March 8, 2022.
  3. Grecia, Leandre (July 5, 2021). "The new LRT-2 stations in Marikina and Antipolo are now operational". Top Gear Philippines. Retrieved July 5, 2021.
  4. Japan International Cooperation Agency (October 2011). PREPARATORY STUDY FOR LRT LINE2 EXTENSION PROJECT : FINAL REPORT (PDF) (Report). Retrieved November 8, 2021.
  5. Light Rail Transit Authority (August 9, 2017). Maintenance of the Manila LRT Line 2 System, Terms of Reference (PDF) (Report). Light Rail Transit Philippines. Archived (PDF) from the original on June 12, 2020. Retrieved December 26, 2021.
  6. Contract for the Supply of Various Signaling Equipment (Interlocking, Jointless Track Circuits, and Miscellaneous Wayside) or its approved equivalent (PDF) (Report). Light Rail Transit Authority. March 16, 2022. pp. 40–46. Retrieved March 22, 2022.
  7. Request for Proposal (Negotiated Procurement) (PDF). Restoration of Signaling Equipment Damaged by Fire Incident at RSS 5 and 6 (Report). Light Rail Transit Authority. March 3, 2021. Retrieved February 23, 2022.
  8. Madarang, Catalina Ricci S. (October 7, 2019). "It's a misnomer! Light Rail Transit Line 2 is actually a heavy rail-subway system". InterAksyon. Retrieved January 5, 2022.
  9. Cordero, Ted (January 8, 2022). "LRTA apologizes for defective elevators, escalators; complaints filed vs officials allegedly involved in anomalous purchase". GMA News. Retrieved January 9, 2022.
  10. "LOOK: Gov't to build 3 more Line 2 stations". ABS-CBN News. October 13, 2019. Retrieved October 14, 2019.
  11. "ROADMAP FOR TRANSPORT INFRASTRUCTURE DEVELOPMENT FOR METRO MANILA AND ITS SURROUNDING AREAS (REGION III&REGION IV-A)" (PDF). March 2014. p. 14. Archived (PDF) from the original on June 27, 2020. Retrieved July 18, 2021.
  12. Regalado, Pia (June 17, 2022). "LRT-2 Extends Operating Hours at Night". reportr.world. Retrieved June 18, 2022.
  13. Galvez, Daphne (April 5, 2022). "No LRT 2 from Holy Wednesday to Easter Sunday". Philippine Daily Inquirer. Retrieved April 5, 2022.
  14. Grecia, Leandre (December 21, 2021). "Here are the LRT-1, LRT-2, MRT-3 schedules for Christmas 2021". Top Gear Philippines. Retrieved December 21, 2021.
  15. World Bank (December 2, 2004). "A Tale of Three Cities: Urban Rail Concessions in Bangkok, Kuala Lumpur and Manila – Final Report" (PDF). Author: 17. Archived from the original (PDF) on April 24, 2006. {{cite journal}}: Cite journal requires |journal= (help) (Prepared by Halcrow Group Limited).
  16. Cuneta, Jopen (April 16, 1990). "16 foreign firms file bids for construction of LRT 2". Malaya.
  17. Reyes, Miguel Paolo P. "It's Not You, It's Me? An Inquiry into the Problems of Philippine-Korean Cooperation for Metro Manila's Rail-based Mass Transit Systems" (PDF). The Mass Transit System in Metro Manila: From Tranvia to MRT, 1879-2014. University of the Philippines Diliman. Retrieved January 31, 2022.
  18. Japan International Cooperation Agency (2009). Metro Manila Strategic Mass Rail Transit Development (I), (II), (III) (PDF) (Report). Retrieved April 4, 2022.
  19. "Package 1 - Depot". Metro Manila Strategic Mass Rail Transit Development Project Line 2 - Megatren. Light Rail Transit Authority. Archived from the original on May 5, 2006. Retrieved December 23, 2021.
  20. "Package 2 - Substructure". Metro Manila Strategic Mass Rail Transit Development Project Line 2 - Megatren. Light Rail Transit Authority. Archived from the original on May 5, 2006. Retrieved December 23, 2021.
  21. "Package 3 - Superstructure and Stations". Metro Manila Strategic Mass Rail Transit Development Project Line 2 - Megatren. Light Rail Transit Authority. Archived from the original on May 5, 2006. Retrieved December 23, 2021.
  22. "Anomaly in LRT-2 bidding - Enrile". Today. February 3, 1998.
  23. Baetiong, May Czarina A. (September 13, 2000). "Marubeni-led consortium bags light railway contract". Business World.
  24. "Package 4 - Systems, Vehicles and Trackworks". Metro Manila Strategic Mass Rail Transit Development Project Line 2 - Megatren. Light Rail Transit Authority. Archived from the original on May 5, 2006. Retrieved December 23, 2021.
  25. Singapore Technologies Electronics. "Electronics Systems Package for Manila Line 2, Philippines" (PDF). Singapore Technologies Engineering. Archived from the original (PDF) on November 18, 2006. Retrieved February 6, 2022.
  26. "Manila light rail transit – Purple Line". Halcrow. Archived from the original on April 26, 2010. Retrieved April 5, 2022.
  27. "Railway Operations". Light Rail Transit Authority. Archived from the original on July 24, 2021. Retrieved September 3, 2021.
  28. Toshiba (2003). Power Systems and Industrial Equipment (PDF) (Report). Retrieved April 8, 2022.
  29. "3,000 passengers on free megatren test run". Manila Bulletin. December 24, 2003. Archived from the original on March 10, 2005. Retrieved February 14, 2022 via Light Rail Transit Authority.
  30. "The Metro Manila Strategic Mass Rail Transit Development Line 2 Project". Light Rail Transit Authority. Archived from the original on May 17, 2006. Retrieved December 23, 2021.
  31. Bergonia, Allan (October 28, 2004). "Line 2 Recto Station Opens". People's Journal. Archived from the original on March 8, 2005. Retrieved May 11, 2006 via lrta.gov.ph.
  32. Abadilla, Emmie V. (July 1, 2021). "P4.5-B LRT-2 East Extension to start operation next week". Manila Bulletin. Retrieved July 1, 2021.
  33. "MRT Line 2 East Extension Project". Light Rail Transit Authority. Archived from the original on October 17, 2003. Retrieved February 18, 2022.
  34. Ho, Abigail L. (October 14, 2003). "Extension of LRT Line 2 to Antipolo gets NEDA backing". Philippine Daily Inquirer. Archived from the original on March 12, 2007. Retrieved February 18, 2022.
  35. "Gov't planning to extend LRT Line 2". GMA News. August 3, 2006. Retrieved April 4, 2022.
  36. Ong, Ghio (January 10, 2021). "3 LRT-2 stations set to reopen". Philstar.com. Retrieved January 12, 2021.
  37. Amojelar, Darwin G. (May 9, 2011). "Govt secures commitments for LRT 2 extension funds". The Manila Times. Retrieved February 18, 2022 via Public-Private Partnership Center.
  38. Gonzalez, Mia M. (September 4, 2012). "Neda Board OKs 9 big projects". Business Mirror. Archived from the original on September 6, 2012. Retrieved September 6, 2012.
  39. "Duterte: Free rides from Antipolo to Santolan stations, vice versa for 2 weeks". GMA News. July 1, 2021. Retrieved July 1, 2021.
  40. Status of LRT Projects as of December 31, 2021 (PDF) (Report). Light Rail Transit Authority. January 19, 2022. p. 4. Archived from the original (PDF) on January 31, 2022. Retrieved January 31, 2022.
  41. "Korean-led group bags consultancy contract for LRT-2 extension". ABS-CBN News. February 28, 2014 [February 27, 2014]. Retrieved April 5, 2022.
  42. Agcaoili, Lawrence (March 9, 2015). "DOTC taps Japanese group as LRT expansion consultant". The Philippine Star. Retrieved April 5, 2022.
  43. "DMCI bags P2.3-B LRT-2 extension project". ABS-CBN News. January 27, 2015. Retrieved July 8, 2021.
  44. "DOTr AND LRTA BREAKS GROUND FOR LRT2 EAST EXTENSION PROJECT - PACKAGE 2". dotr.gov.ph. Department of Transportation. Retrieved July 8, 2021.
  45. "LRT Line 2 East Extension Project Awarded to Marubeni-DMCI". Marubeni Philippines Corporation. March 7, 2019. Retrieved July 8, 2021.
  46. Manabat, Jacque (June 9, 2015). "Next stop, Antipolo: LRT-2 begins expansion". ABS-CBN News. Retrieved April 27, 2022.
  47. Mercurio, Richmond (April 17, 2019). "Final phase of LRT-2 extension project starts". The Philippine Star. Retrieved November 30, 2021.
  48. Bondoc, Marlly Rome C. (March 10, 2017). "One dead, two injured as dump truck slams into LRT-2 post in Marikina". GMA News. Retrieved November 10, 2021.
  49. Quismorio, Ellson (February 26, 2021). "Anticipating Antipolo: DOTr hypes up April opening of new LRT-2 stations". Manila Bulletin. Retrieved March 2, 2021.
  50. Cordero, Ted (March 4, 2021). "LRT2 East Extension to commence ops on April 27". GMA News.
  51. Rey, Aika (April 16, 2021). "COVID-19 curbs delay LRT2 East Extension opening to June 23". Rappler. Retrieved April 16, 2021.
  52. "LRT-2 East Extension Project inauguration moved; weekend closures announced". CNN Philippines. June 21, 2021. Retrieved June 22, 2021.
  53. "Manila Light Rail Transit Line 2 East Extension Line Starts Operation". Marubeni Corporation. July 6, 2021. Retrieved July 8, 2021.
  54. Rosales, Clara (July 2, 2021). "Free Rides, Fares, More: LRT-2 Marikina, Antipolo Stations Open Today". reportr.world. Retrieved November 24, 2021.
  55. "More trains to operate in LRT-2 east extension after July 18 – LRTA". CNN Philippines. July 5, 2021. Retrieved July 6, 2021.
  56. Grecia, Leandre (July 5, 2021). "New LRT-2 stations riddled with long queues on first day of operations". Top Gear Philippines. Retrieved November 24, 2021.
  57. "Updated LRT-Line 2 Operating Hours (Implementation of Full-line Operations)". Light Rail Transit Authority. September 3, 2021. Retrieved September 9, 2021.
  58. Cerrudo, Aileen (September 7, 2021). "Full-line operation of LRT-2 East Extension stations begin". UNTV News and Rescue. Retrieved September 9, 2021.
  59. "Antipolo discusses LRT-2 extension project, sees great benefits for the city". Politiko South Luzon. September 30, 2022. Retrieved October 1, 2022.
  60. "Wala pong limit sa diameter ng wheels. Kaugnay naman po ng bagahe, hanggang 2 feet x 2 feet po ang maximum dimension na pinapayagan sa LRT-2". Twitter. Retrieved May 15, 2022.
  61. GMANews.TV, SOPHIA DEDACE. "Bikes, trains, and fewer cars with LRT's Bike O2 project". GMA News Online. Retrieved May 15, 2022.
  62. Layson, Mer (April 18, 2022). "Escalators, elevators ng LRT-2, operational na simula Lunes". Pilipino Star Ngayon (in Filipino). Retrieved April 19, 2022.
  63. "LRTA management files corruption cases against agency execs, contractors linked to anomalous purchase of substandard equipment" (Press release). Light Rail Transit Authority. December 13, 2021. Retrieved January 5, 2022.
  64. Villanda, Karen (December 13, 2021). "LRTA files graft case due to anomaly purchase of LRT-2 equipment". PTV News. Retrieved January 5, 2022.
  65. Dela Cruz, Raymond Carl (January 20, 2022). "28 more LRT-2 elevators, escalators restored". Philippine News Agency. Retrieved January 21, 2022.
  66. Climate-Eval (GEF IEO) (August 2009). "Republic of the Philippines: Metropolitan Manila Strategic Mass Rail Transit Development-Line 2" (PDF). Author. Archived from the original (PDF) on August 21, 2014. Retrieved August 18, 2014. {{cite journal}}: Cite journal requires |journal= (help) (Prepared by Sanshu Engineering Consultant)
  67. Light Rail Transit Authority (October 29, 2013). "Interim Performance Scorecard for CY 2013" (PDF). Author. Archived from the original (PDF) on August 21, 2014. Retrieved August 18, 2014. {{cite journal}}: Cite journal requires |journal= (help)
  68. Antiporda, Jefferson (August 10, 2005). "MRT issues directive imposing ban on tin cans". The Manila Times. Archived from the original on August 19, 2006.
  69. del Puerto, Luige A.; Quismundo, Tarra V. (November 13, 2004). "New task force formed to keep LRT, MRT safe". Philippine Daily Tribune. Archived from the original on August 28, 2005.
  70. Garcia, Ma. Angelica (May 28, 2020). "LRT, MRT, PNR to resume limited ops starting June 1". GMA News. Retrieved March 1, 2022.
  71. "DOTr: WEARING OF FACE SHIELDS IN PUBLIC TRANSPORT IN AREAS UNDER ALERT LEVELS 1, 2, AND 3, NO LONGER MANDATORY". Department of Transportation (Philippines) (Press release). November 16, 2021. Retrieved March 29, 2022.
  72. Pornelos, Vince (September 17, 2020). "DOTr bans talking and answering calls on public transport". AutoIndustriya.com. Retrieved March 2, 2022.
  73. Laurel, Drei (March 10, 2020). "MRT, LRT undergo regular sanitation amidst spread of COVID-19". Top Gear Philippines. Retrieved April 4, 2022.
  74. "Status and availability of the Line 2 train fleet". eFreedom of Information. Government of the Philippines. Retrieved December 29, 2021.
  75. "Monthly Ridership – Line 2 System Ridership" (PDF). Light Rail Authority. Retrieved January 4, 2019.
  76. "LRT 2 Close to Hitting 2004 Ridership Target". Daily Tribune. August 9, 2004. Archived from the original on November 12, 2004. Retrieved March 29, 2022 via Light Rail Transit Authority.
  77. Annual Report 2018 (PDF) (Report). Light Rail Transit Authority. December 31, 2018. p. 20. Archived from the original (PDF) on January 2, 2020. Retrieved January 2, 2020.
  78. Accomplishment Report - CY2019 (PDF) (Report). Light Rail Transit Authority. December 31, 2019. p. 17. Retrieved March 2, 2022.
  79. "Tickets and Fares". Light Rail Transit Authority. Retrieved July 24, 2021.
  80. "MRT-3, LRT-2 offer free rides to women on March 8". GMA News Online. March 7, 2021. Retrieved June 10, 2021.
  81. "MRT, LRT 1 and 2 to offer free rides on June 12". ABS-CBN News. June 11, 2019. Retrieved June 10, 2021.
  82. Sabillo, Kristine Angeli (December 28, 2013). "MRT, LRT offer free rides on Rizal Day". Philippine Daily Inquirer. Retrieved July 24, 2021.
  83. Rey, Aika (June 27, 2019). "Free LRT 2, MRT, PNR rides for students starting July 1". Rappler. Retrieved June 10, 2021.
  84. Laurel, Drei (June 28, 2019). "Students must register for free MRT-3, LRT-2, and PNR rides". Top Gear Philippines. Retrieved June 10, 2021.
  85. Mercado, Neil Arwin (July 1, 2022). "Marcos extends free EDSA Carousel bus rides, OKs free train rides for students". Philippine Daily Inquirer. Retrieved July 1, 2022.
  86. Cruz, Maricel (July 14, 2022). "Free train rides to students limited to LRT-2 as government recalibrates policy". Manila Standard. Retrieved July 15, 2022.
  87. Casanova, Sheryll B. (November 12, 2003). "MRTC borrows value tickets from LRTA". Manila Times. Archived from the original on January 5, 2004.
  88. Corrales, Nestor (July 21, 2015). "LRT 'Beep card' trial a success – DOTC". Philippine Daily Inquirer. Retrieved June 22, 2022.
  89. Manabat, Jacque (July 19, 2022). "Depleted supply of Beep cards anticipated due to global chip shortage". ABS-CBN News. Retrieved August 20, 2022.
  90. Rosales, Elijah Felice (August 20, 2022). "DOTr warns of 'beep' card shortage". The Philippine Star. Retrieved August 20, 2022.
  91. LRT-2 East Extension, nagsimula nang maningil ng pasahe ngayong araw; disinfection mula sa mga single-journey tickets hanggang sa mga tren, inilatag (16:9) (Facebook Watch) (in Filipino). People's Television Network. July 19, 2021. Retrieved November 24, 2021.
  92. "LRT-MRT FARES TO BE INCREASED ON JAN.4". Department of Transportation and Communications. Archived from the original on December 25, 2014. Retrieved March 10, 2015.
  93. Diokno, Benjamin E. (December 17, 2013). "Folly of government subsidy". BusinessWorld. BusinessWorld Publishing Corporation. Retrieved April 25, 2014.
  94. "Line 2 unveils PARDS for passengers". ABS-CBN. ANC. May 6, 2017. Retrieved May 23, 2020.
  95. Rita, Joviland (March 7, 2019). "Expect 'cooler' LRT2 trains as aircon units undergo temporary fix before being replaced". GMA News. Retrieved November 3, 2021.
  96. Cordero, Ted (March 11, 2021). "LRT2 to add more running trains by April, says LRTA". GMA News. Retrieved March 19, 2022.
  97. Pateña, Aerol John (March 7, 2019). "Expect more comfortable LRT-2 trains by April: LRTA". Philippine News Agency.
  98. Balinbin, Arjay (February 11, 2020). "LRT-2 extension 77% complete". Bworldonline.com. Retrieved March 9, 2021.
  99. "Bidding of the Design-and-Build Contract for One (1) Lot for LRT Line 2 West Extension Project" (PDF). Light Rail Transit Authority. August 27, 2020. Retrieved March 15, 2022.
  100. "Philippines Manila Line 2 EMU". Hyundai Rotem. Retrieved July 17, 2016.
  101. Department of Transportation and Communications; Light Rail Transit Authority (September 2014). LRT LINE 2 OPERATIONS AND MAINTENANCE PROJECT (PDF) (Report). Retrieved November 22, 2021.
  102. "Operations Update", Facebook.com, retrieved September 3, 2021
  103. Cabuenas, Jon Viktor D. (February 13, 2022). "LRT-2 delays expected as signaling system undergoes upgrade". GMA News. Retrieved February 13, 2022.
  104. Rail Section Profiles from TECHNICAL REQUIREMENTS - DRAWINGS (PDF). BIDDING DOCUMENTS - CAPACITY ENHANCEMENT OF MASS TRANSIT SYSTEMS IN METRO MANILA: PROCUREMENT OF TRACKWORKS, ELECTRICAL AND MECHANICAL SYSTEMS AND INTEGRATION WITH EXISTING SYSTEMS FOR LRT LINE 2 EAST (MASINAG) EXTENSION PROJECT (Report). Retrieved February 3, 2022.
  105. Naguit, Roices (May 19, 2015). "President Aquino approves Line 2 extension to Manila port area, 6 other infra projects". Interaksyon. Archived from the original on May 22, 2015. Retrieved May 20, 2015.
  106. Rosales, Elijah Felice (July 25, 2022). "Bidders sought for P10 billion LRT upgrade, extension". The Philippine Star. Retrieved July 25, 2022.
  107. Rosales, Elijah Felice (November 1, 2022). "3 new stations mulled on Rizal end of LRT-2". The Philippine Star. Retrieved November 2, 2022.
  108. "DOTC awards LRT-1 Cavex PPP; starts bid for LRT-2 O&M". Official Gazette of the Republic of the Philippines. September 13, 2014. Retrieved September 19, 2021.
  109. "Aboitiz Equity Ventures, Inc. and SMRT Transport Solutions Consortium" (PDF). PRE-QUALIFICATION OF THE LIGHT RAIL TRANSIT LINE 2 OPERATIONS AND MAINTENANCE PROJECT. February 17, 2015. Retrieved February 3, 2022.
  110. "LRM2 Consortium" (PDF). PRE-QUALIFICATION OF THE LIGHT RAIL TRANSIT LINE 2 OPERATIONS AND MAINTENANCE PROJECT. February 17, 2015. Retrieved February 3, 2022.
  111. Desiderio, Louella (April 2, 2016). "LRT-2 bidding postponed anew". The Philippine Star. Retrieved September 19, 2021.
  112. Delavin, Imee Charlee C. (June 6, 2017). "Metro Pacific interested in possible LRT-2 O&M auction". BusinessWorld. Retrieved September 19, 2021 via ppp.gov.ph.
  113. Cervantes, Filane Mikee (October 8, 2019). "Solon pushes for LRT-2 privatization". Philippine News Agency. Retrieved September 19, 2021.
  114. "Request for Expression of Interest (REI) for Consulting Services for the LRT Line 2 Capacity Expansion" (PDF). Light Rail Transit Authority. April 27, 2022. Retrieved April 27, 2022.
  115. Consulting Services for the LRT Line 2 Capacity Expansion (PDF) (Report). Light Rail Transit Authority. June 2, 2022 [June 1, 2022]. Retrieved June 2, 2022.
  116. "Lightning strikes twice: LRT-2 trips disrupted anew". GMA News and Public Affairs. August 15, 2006. Retrieved November 1, 2021.
  117. "LRT-2 resumes normal operations". GMA News and Public Affairs. August 15, 2006. Retrieved November 1, 2021.
  118. "Lightning disrupts LRT Line 2 operation". GMA News and Public Affairs. May 20, 2008. Retrieved November 1, 2021.
  119. "Power outage disrupts LRT Line-2 operations". GMA News and Public Affairs. July 23, 2008. Retrieved November 1, 2021.
  120. Datu, Dennis; Ibanez, Jon; Gutierrez, Pia (June 11, 2011). "Man jumps in front of LRT train". ABS-CBN News. Retrieved July 11, 2021.
  121. Man jumps in front of LRT. YouTube (video). June 19, 2011. Archived from the original on December 14, 2021. Retrieved July 11, 2021.
  122. Esperas, Raoul (May 9, 2017). "LRT-2 operation resumes after clearing of tree branches". ABS-CBN News. Retrieved September 7, 2021.
  123. "LRT-2 limits trips over damaged power lines". CNN Philippines. May 30, 2018. Retrieved April 16, 2021.
  124. Hallare, Katrina (May 15, 2019). "LRT 2 operations resume after air pressure glitch". Philippine Daily Inquirer. Retrieved October 31, 2021.
  125. Barcelon, Paolo (May 19, 2019). "Authorities to probe Line 2 collision that injured 34". CNN Philippines. Retrieved May 19, 2019.
  126. Rita, Joviland (May 19, 2019). "Probe underway into Line 2 trains collision; 34 hurt". GMA News Online. Retrieved May 19, 2019.
  127. Dava, Bianca (May 19, 2019). "LRT-2 resumes operations after train collision". ABS-CBN News. Retrieved March 7, 2021.
  128. "LRTA Line 2 TS #18 is back on track while TS #13 is 15% complete as of April 2021". Facebook. Retrieved July 13, 2021.
  129. Ong, Ghio (October 3, 2019). "Power glitches disrupt LRT-2, MRT-3 operations". Philstar Global. Retrieved May 26, 2021.
  130. "Line 2 temporarily halts operation due to power supply problem caused by fire". GMA News Online. October 3, 2019.
  131. "Line 2 full operations eyed to resume in 2 to 3 months". ABS-CBN News. October 14, 2019. Retrieved February 4, 2020.
  132. Luna, Franco (February 3, 2020). "Anonas, Katipunan and Santolan Line 2 stations to be repaired by end of June 2020". Philstar. Archived from the original on June 6, 2020. Retrieved February 4, 2020.
  133. "LRT-2 aims to resume full operations by January 2021". cnn. Retrieved December 20, 2020.
  134. Grecia, Leandre (October 8, 2020). "LRT-2 operations suspended after fire breaks out at Santolan station". Top Gear Philippines. Retrieved April 7, 2021.
  135. Dela Cruz, Raymond Carl (October 8, 2020). "LRT-2 back to normal ops hours after Santolan Station fire". Philippine News Agency. Retrieved April 7, 2021.
  136. "LRT2 halts operations due to technical problem". GMA News Online. April 7, 2021. Retrieved April 7, 2021.
  137. "Operasyon ng LRT-2 balik-normal na matapos ang operational service". ABS-CBN News (in Filipino). May 25, 2021. Archived from the original on May 25, 2021. Retrieved July 18, 2021.
  138. Cabuenas, Jon Viktor D. (June 17, 2021). "LRT2 operations suspended due to technical issues". GMA News Online. Retrieved June 20, 2021.
  139. Rey, Aika (August 16, 2021). "LRT2 Anonas, Katipunan trips suspended over glitch". Rappler. Retrieved August 16, 2021.
  140. Ong, Ghio (September 18, 2021). "Tangled t-shirt stops LRT-2 train trips". The Philippine Star. Retrieved September 18, 2021.
  141. Cordero, Ted (October 9, 2021). "LRT2 stops ops on Saturday morning due to entangled balloon". GMA News. Retrieved October 9, 2021.
  142. Rita, Joviland (November 3, 2021). "LRT2 temporarily stops operation due to signaling system issue". GMA News. Retrieved November 3, 2021.
  143. Santos, Jamil (November 3, 2021). "LRT2 resumes full operation after signaling system issue". GMA News. Retrieved November 3, 2021.
  144. "LRT2 temporarily stops operations due to signaling system problem". GMA News and Public Affairs. November 6, 2021. Retrieved November 6, 2021.
  145. "LRT2 stops operations temporarily due to signaling problem". GMA News and Public Affairs. November 14, 2021. Retrieved November 14, 2021.
  146. Ong, Ghio (November 27, 2021). "Recurring glitches plague LRT-2". The Philippine Star. Retrieved April 8, 2022.
  147. Galvez, Daphne (August 1, 2022). "LRT-2 resumes operations after technical glitch". Philippine Daily Inquirer. Retrieved August 1, 2022.