Çetintepe Dam
The Çetintepe Dam is a gravity dam under construction on the Ortasu River (a tributary of the Hezil River) in Uludere district of Şırnak Province, southeast Turkey. Under contract from Turkey's State Hydraulic Works, Ozerka Insatt began construction on the dam in 2008 and a completion date has not been announced.[2]
Çetintepe Dam | |
---|---|
Location of Çetintepe Dam in Turkey | |
Country | Turkey |
Location | Uludere, Şırnak Province |
Coordinates | 37°22′10.39″N 42°56′19.38″E |
Purpose | Water supply, military |
Status | Under construction |
Construction began | 2008 |
Construction cost | US$24,640,000 (TL38,500,000) (Combined cost with Musatepe Dam)[1] |
Owner(s) | State Hydraulic Works |
Dam and spillways | |
Type of dam | Gravity, roller-compacted concrete |
Impounds | Ortasu River |
Height | 60.5 m (198 ft) |
Height (thalweg) | 116 m |
Length | 174 m (571 ft) |
Elevation at crest | 1,161 m (3,809 ft) |
Width (crest) | 8 m (26 ft) |
Dam volume | 130,500 m3 (170,688 cu yd) |
Spillway type | Overflow |
Reservoir | |
Total capacity | 44,330,000 m3 (35,939 acre⋅ft) |
Catchment area | 125.5 km2 (48 sq mi) |
Surface area | 1.40 km2 (1 sq mi) |
Normal elevation | 1,155 m (3,789 ft) |
Power Station | |
Installed capacity | 2 MW (planned)[2] |
The reported purpose of the dam is water storage and it can also support a 2 MW hydroelectric power station in the future.[2] Another purpose of the dam which has been widely reported in the Turkish press is to reduce the freedom of movement of Kurdistan Workers' Party (PKK) militants. Blocking and flooding valleys close to the Iraq–Turkey border is expected to help curb cross-border PKK smuggling and deny caves in which ammunition can be stored. A total of 11 dams along the border; seven in Şırnak Province and four in Hakkâri Province were implemented for this purpose. In Şırnak they are the Silopi, Şırnak, Uludere, Balli, Kavşaktepe and Musatepe Dams downstream of the Çetintepe Dam. In Hakkari are the Gölgeliyamaç (since cancelled) and Çocuktepe Dams on the Güzeldere River and the Aslandağ and Beyyurdu Dams on the Bembo River.[3][4][5][6]
Çetintepe Dam was still under construction as of July 2019, with construction works 68% complete at that time.[7]
References
- "Cetintepe Dam construction tender". DGMarkets. 2008. Retrieved 3 August 2013.
- "DSI 10 REGIONAL OFFICE - Diyarbakir" (in Turkish). State Hydraulic Works. Archived from the original on 21 November 2012. Retrieved 1 August 2013.
- "Terror Down" (in Turkish). Posta. 24 August 2012. Retrieved 1 August 2013.
- "Planned to be completed in the second dam on the border against the PKK" (in Turkish). Hurriyet. 26 October 2011. Retrieved 1 August 2013.
- "Dams Prevent Smuggling at the Border" (in Turkish). Aktif Haber. 5 May 2013. Archived from the original on 10 May 2013. Retrieved 1 August 2013.
- "Water retention dams began operation against PKK" (in Turkish). CNNTurk. 23 August 2012. Retrieved 2 August 2013.
- "Besni ve gölbaşı çetintepe barajı ile hayat bulacak - Adıyaman Haberleri". www.haberturk.com (in Turkish). Retrieved 2020-04-24.