APU/Citrus College station
APU/Citrus College station is an at-grade light rail station on the A Line of the Los Angeles Metro Rail system. It is located between Palm Drive and Citrus Avenue, a block north of Foothill Boulevard, in Azusa, California. It is named after the nearby Azusa Pacific University (APU) and Citrus College.[3]
![]() APU/Citrus College station platform | |||||||||||||
General information | |||||||||||||
Location | 6898 North Citrus Avenue Azusa, California | ||||||||||||
Coordinates | 34.1369°N 117.8901°W | ||||||||||||
Owned by | Los Angeles County Metropolitan Transportation Authority | ||||||||||||
Platforms | 1 island platform | ||||||||||||
Tracks | 2 | ||||||||||||
Connections | |||||||||||||
Construction | |||||||||||||
Structure type | At-grade | ||||||||||||
Parking | 200 spaces[1] | ||||||||||||
Bicycle facilities | Racks and lockers[2] | ||||||||||||
Accessible | Yes | ||||||||||||
History | |||||||||||||
Opened | March 5, 2016 | ||||||||||||
Previous names | Azusa/Citrus, Citrus Avenue | ||||||||||||
Services | |||||||||||||
| |||||||||||||
Future service | |||||||||||||
| |||||||||||||
| |||||||||||||
Location | |||||||||||||
This station opened on March 5, 2016, as part of Phase 2A of the Gold Line Foothill Extension Project, and currently serves as the northern terminus of the A Line. Phase 2B of the Foothill Extension will open to Pomona in summer 2025.[4]
Due to heavy rain in March 2016, the previously delayed underpass construction on North Citrus Avenue was flooded. The Citrus Avenue extension and underpass were finally opened in September 2016.
Service
Station layout
Westbound | ← ![]() |
Island platform, doors will open on the left or right | |
Westbound/ Eastbound |
← ![]() ![]() |
Hours and frequency
A Line trains run every day between approximately 4:30 a.m. and 11:30 p.m. Trains operate every 10 minutes during peak hours Monday through Friday, and every twelve minutes during the daytime on weekdays and all day on the weekends. Evening service (after 7 p.m.) is every 20 minutes.[5]
Connections
As of June 16, 2023, the following connections are available:[6]
- Foothill Transit: 281, 284, 488, 690
- Glendora Transportation Division: Gold Line Shuttle North Route, Gold Line Shuttle South Route[7]
References
- "Metro Parking Lots by Line". Los Angeles County Metropolitan Transportation Authority. Archived from the original on August 10, 2020. Retrieved November 5, 2021.
- "Secure Bike Parking on Metro" (PDF). Los Angeles County Metropolitan Transportation Authority. Archived from the original (PDF) on September 6, 2021. Retrieved November 5, 2021.
- "Art of the Journey, The Foothill Gold Line" (PDF). Foothill Gold Line Construction Authority. Archived (PDF) from the original on August 24, 2016. Retrieved August 24, 2014.
- @numble (October 3, 2023). "August 2023 status report for LA Metro's Foothill Gold Line (Blue/A) Extension. 72.9% complete as of 8/31/23 +1.5% since 5/31/23 (3 month period). Potential typos in report (it says 72.9% as of June)" (Tweet). Retrieved October 3, 2023 – via Twitter.
- "Metro A Line schedule". Los Angeles County Metropolitan Transportation Authority. June 16, 2023. Retrieved June 12, 2023.
- "A Line Timetable – Connections section" (PDF). Los Angeles County Metropolitan Transportation Authority. June 16, 2023. p. 2. Retrieved June 17, 2023.
- "Shuttle Services". City of Glendora. Archived from the original on November 7, 2021. Retrieved November 7, 2021.