European Offshore Wind Deployment Centre
The European Offshore Wind Deployment Centre (EOWDC), also known as the Aberdeen Bay Wind Farm[2] is an offshore wind test and demonstration facility located around 3 kilometres off the east coast of Aberdeenshire, in the North Sea, Scotland. It was developed by the European Offshore Wind Deployment Centre consortium.[3] The scheme is relatively small - it consists of 11 wind turbines with an installed capacity of 93.2 megawatts.[4] It is located between Blackdog and Bridge of Don near Aberdeen.[5] First power was generated in July 2018,[6] with full commissioning following in September 2018.[4]
European Offshore Wind Deployment Centre | |
---|---|
Country | Scotland |
Location | Aberdeen's Bay |
Coordinates | 57°13′N 1°59′W |
Status | Operational |
Commission date | September 2018 |
Construction cost | £335 million[1] |
Owner(s) | European Offshore Wind Deployment Centre |
Wind farm | |
Type | Offshore |
Max. water depth | 32 m[1] |
Distance from shore | 3 km (2 mi)[1] |
Hub height | 120 m[1] |
Rotor diameter | 164 m[1] |
Site area | 19 km2[1] |
Power generation | |
Units operational | 2 × 8.8 MW 9 × 8.4 MW |
Make and model | Vestas V164 8.4-8.8MW |
Units planned | 11 × 8.5 MW[1] |
Nameplate capacity | 92.4 MW |
External links | |
Website | group |
Commons | Related media on Commons |
Planning
The wind farm was initially proposed by the Aberdeen Renewable Energy Group (AREG) in 2003.[7] The original plan was for 20 two-megawatt turbines in an eight kilometres long row about 1 kilometre offshore.[7] A geological survey of Aberdeen Bay was begun in 2007,[8] and a grant of 40 million euros was offered by the European Commission in 2009.[5] The proposal at that stage was for a maximum of 23 turbines.[5]
A planning application was lodged in August 2011.[9] The application was submitted by Aberdeen Renewable Energy Group (AREG) in cooperation with two other companies, Vattenfall and Technip.[9] The proposal was for 11 turbines.[9] Planning consent was granted by the Scottish government in March 2013.[10]
In May 2013 Vattenfall announced plans to reduce its stake in the project.[11] In October 2013 Aberdeenshire councillors rejected a planning application to build an electricity substation.[12] In December 2013 it was announced that construction would be delayed for two years, with connection of the grid occurring in 2017.[13] In January 2014 an appeal against the substation vote was lodged.[14] The developers won the appeal in July 2014.[15]
Vattenfall decided to proceed with the 92 MW wind farm in July 2016.[16] The plan was for 11 turbines each of 8 MW placed 3 km from land,[1] with a contract for the assembly of suction bucket foundations for the turbines contracted out to Smulders Projects UK.[17]
Objections
American billionaire Donald Trump purchased a large part of the Menie estate near the village of Balmedie in 2006. He proposed to build a golf course, with a hotel, holiday homes and a residential village.[18] He expressed his concerns about the wind farm in April 2006 stating that "I want to see the ocean, I do not want to see windmills."[19]
In 2006 RSPB Scotland expressed concern about the effect both the wind farm and Donald Trump's golf course would have on the wildlife on the Aberdeenshire coast.[19] In 2011 the RSPB called for "more planning, research and monitoring ... to ensure we truly understand the impact this site may have on local birds."[20]
In September 2011 the Trump Organization filed an objection to the planning application.[21]
By 2012 the RSPB dropped its opposition to the wind farm following the reduction in the number of turbines and a change in the layout."[22]
In May 2013 Trump launched a legal challenge against the Scottish government's decision to grant planning permission for the wind farm.[23] The hearing began at the Court of Session in November 2013,[24] but was rejected in February 2014.[25] An appeal against the decision was heard at the Court of Session in January 2015,[26] but Trump lost the appeal in June 2015.[27] After the decision Trump said he would appeal before both the Supreme Court of the UK and the European Courts.[27] Trump's appeal was unanimously dismissed by the UK Supreme Court in December 2015.[28]
Construction
Connection work began in early 2017. The turbines are mounted on unusual suction bucket foundations. The sea cables are 66kV.[29] There are more than four miles of high voltage underground cable between the substation in Dyce (on the outskirts of Aberdeen) and the wind farm's onshore substation at Blackdog.[30] The first foundation was installed offshore in March 2018,[31] and the first turbine was installed in April.[32] The eleventh and final turbine was erected near the end of May.[33] First power was generated in July 2018,[6] with full commissioning following in September 2018.[4]
See also
References
- "Aberdeen Offshore Wind Farm". 4coffshore.com. Retrieved 5 March 2017.
- "Aberdeen Bay Wind Farm generates £23.3million in first six months". Aberdeen Bay Wind Farm generates £23.3million in first six months. Archived from the original on 20 December 2019.
Aberdeen Bay Wind Farm [..] The 11-turbine project, also known as the European Offshore Wind Deployment Centre (EOWDC)
- European Offshore Wind Deployment Centre, Vattenfall, retrieved 29 July 2014
- "Aberdeen offshore wind project opposed by Trump officially opening". BBC News. NE Scotland, Orkney & Shetland. 7 September 2018. Retrieved 9 September 2018.
- "Offshore wind farm given EC boost", BBC News, 7 May 2009
- "Aberdeen wind farm opposed by Donald Trump generates first power".
- "Offshore wind farm plan unveiled", BBC News, 15 September 2003
- "Sea survey for offshore wind farm", BBC News, 5 July 2007
- "Wind farm project application for Aberdeen Bay", BBC News, 5 August 2011
- "Consent for Donald Trump row wind farm announced", BBC News, 26 March 2013
- "Aberdeen wind farm partner Vattenfall to reduce stake", BBC News, 10 May 2013
- "Plans for wind test centre off Aberdeen suffers setback", BBC News, 29 October 2013
- "Offshore wind farm plan opposed by Donald Trump is delayed", BBC News, 5 December 2013
- Energy giant to appeal rejection of £230m Aberdeen Bay wind farm, STV, 14 January 2014
- "Substation near Donald Trump golf course to go ahead", BBC News, 23 July 2014
- "Vattenfall to invest £300m in Aberdeen offshore wind farm". BBC News. 21 July 2016. Retrieved 30 June 2021.
- Findlay, Keith (1 February 2017). "English firm Smulders wins Aberdeen Bay wind farm deal". energyvoice.com. Retrieved 5 March 2017.
- First look at Trump plan for 'world's best course', HeraldScotland, 16 February 2010
- "Fears over Trump's golfing plans", BBC News, 24 May 2006
- "RSPB Scotland objection to Aberdeen offshore wind farm", BBC News, 1 November 2011
- "Donald Trump sends wind farm complaint to Alex Salmond", BBC News, 14 September 2011
- "Donald Trump in fresh Aberdeen wind farm attack", BBC News, 5 October 2012
- "Donald Trump launches legal challenge to wind farm decision", BBC News, 16 May 2013
- "Donald Trump challenge to Aberdeenshire wind turbines begins", BBC News, 12 November 2013
- Donald Trump loses court battle against offshore wind farm, The Daily Telegraph, 11 February 2014
- "Trump and windfarm team face courtroom battle over Aberdeen turbines plan". Evening Express. 20 January 2015.
- Billionaire Donald Trump loses legal battle over offshore wind farm, STV, 5 June 2015
- Trump International Golf Club Scotland Limited v The Scottish Ministers [2015] UKSC 74
- Foxwell, David (18 June 2018). "Planning ahead speeds construction of EOWDC". www.owjonline.com. Retrieved 16 April 2019.
- "Donald Trump-opposed wind farm in Aberdeen Bay connected to grid". The Scotsman. 3 April 2018.
- "First foundation installed for pioneering offshore wind project". Aberdeen Evening Express. 26 March 2018.
- "First European Offshore Wind Deployment Centre turbine installed". BBC News. 10 April 2018.
- "Wind farm that was opposed by Donald Trump fitted with final turbine". The Herald. 28 May 2018.