Aga Khan Park & Museum stop

Aga Khan Park & Museum is a surface light rail transit (LRT) stop under construction on Line 5 Eglinton, a new line that is part of the Toronto subway system. Destinations nearby include its namesakes, Aga Khan Park and Aga Khan Museum.[2] The station is scheduled to open in 2024.[1]

Aga Khan Park & Museum
Stop under construction in July 2020
General information
LocationEglinton Avenue East & Don Valley Parkway
Toronto, Ontario
Canada
Coordinates43°43′21″N 79°19′57″W
PlatformsParallel side platforms
Tracks2
ConnectionsNone
Construction
Structure typeAt grade
AccessibleYes
Other information
StatusUnder construction
History
Opening2024 (2024)[1]
Services
Preceding station Toronto Transit Commission Following station
Science Centre
towards Mount Dennis
Eglinton
(opens 2024)
Wynford
towards Kennedy

The stop is located in the middle of Eglinton Avenue East, on the west side of the intersection with the southbound ramp from and to the Don Valley Parkway southbound. The stop has parallel side platforms. Access to the platforms will be via the pedestrian crossing on the west side of the signalized intersection where the ramp crosses Eglinton Avenue.[3] Just to the west of the stop, there is a double crossover on the ramp descending to Science Centre station.[4]

During the planning stages for Line 5 Eglinton, the stop was given the working name "Ferrand" after the nearby Ferrand Drive. With public consultation, Metrolinx proposed changing the name to "Aga Khan & Eglinton" finally choosing "Aga Khan Park & Museum". Metrolinx said that "The Aga Khan Museum is a highly visible landmark. Naming this surface-level LRT stop [after the museum] provides a unique and self-locating identifier."[5]

Surface connections

As of February 2022, the following are the proposed connecting routes that would serve this station when Line 5 Eglinton opens:[6]

Route Name Additional information
34 Eglinton Westbound to Mount Dennis station and eastbound to Kennedy station

References

  1. Ranger, Michael (May 16, 2023). "Eglinton Crosstown won't open until 2024, construction group to take legal action: Metrolinx". CityNews. Retrieved May 16, 2023.
  2. "Ferrand Stop". Eglinton Crosstown. February 27, 2017. Archived from the original on November 7, 2017. Retrieved November 3, 2017.
  3. "Science Centre Station and West At-Grade (Sunnybrook Park Stop to O'Connor Stop) Open House". Metrolinx. November 14, 2017. p. 25. Archived from the original on November 16, 2017. Retrieved November 15, 2017.
  4. "Eglinton Crosstown Surface Flyover - July 2020". Metrolinx. July 15, 2020. p. 01:48. Retrieved July 31, 2020.
  5. "Aga Khan & Eglinton". Metrolinx. Archived from the original on September 18, 2020. Retrieved November 3, 2017.
  6. "2022 Annual Service Plan" (PDF). Toronto Transit Commission. February 10, 2022. p. 37. Archived (PDF) from the original on February 8, 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.