Artemis 2

Artemis 2 (officially Artemis II)[4] is the second scheduled mission of NASA's Artemis program and the first scheduled crewed mission of NASA's Orion spacecraft, currently planned to be launched by the Space Launch System (SLS) in November 2024.[1] Four astronauts are to perform a flyby of the Moon and return to Earth, being the first crewed mission beyond low Earth orbit since Apollo 17 in 1972. The mission is also planned to be the first crewed launch from Launch Complex 39B of the Kennedy Space Center since STS-116 in 2006.

Artemis 2
Summary of the Artemis 2 mission plan
NamesArtemis 2
Exploration Mission-2 (EM-2)
Mission typeCrewed lunar flyby
OperatorNASA
Mission duration10 days (planned)
Spacecraft properties
SpacecraftOrion CM-003
Crew
Crew size4
MembersReid Wiseman
Victor Glover
Christina Koch
Jeremy Hansen
Start of mission
Launch dateNovember 2024 (planned)[1]
RocketSLS Block 1
Launch siteKennedy Space Center, LC-39B[2]
ContractorNASA
End of mission
Recovered byU.S. Navy
(San Antonio-class amphibious transport dock)
Landing sitePacific Ocean (planned)
Flyby of Moon
Distance6,400 mi (10,300 km) (planned)[3]

(Clockwise from left) Koch, Glover, Hansen, Wiseman
 

Originally designated Exploration Mission-2 (EM-2), the mission was intended to collect samples from a captured asteroid in lunar orbit by the now-canceled robotic Asteroid Redirect Mission;[5] it was renamed after the introduction of the Artemis program.

History

In 2017, Exploration Mission-2 was a projected single-launch mission of a Space Launch System (SLS) Block 1B with an Exploration Upper Stage, lunar Block 1 Orion spacecraft, and a payload insertion of 50.7 t (55.9 short tons; 112,000 lb). The plan was to rendezvous with an asteroid previously placed in lunar orbit by the robotic Asteroid Redirect Mission and have astronauts perform space-walks and gather samples.[6] After the cancellation in April 2017[7] of the Asteroid Redirect Mission, an 8-day mission was proposed with a crew of four astronauts, sent on a free-return trajectory around the Moon.[8] Another proposal suggested in 2017 was to take four astronauts aboard Orion on an 8-to-21–day trip around the Moon to deliver the first element of the Deep Space Gateway.[9] In March 2018, it was decided to launch the first Gateway module on a commercial launch vehicle[10] because of delays in building the Mobile Launcher needed to hold the more powerful Exploration Upper Stage.[11] The launcher was selected to be the Falcon Heavy.[12]

Artist's rendition of the Orion spacecraft in lunar orbit

On 11 February 2023, NASA flipped the engine section for the Artemis 2 core to horizontal, the final major milestone before mating the section to the rest of the vehicle. On March 20, the engine section was mated with the Artemis 2 core stage in Building 103 at the Michoud Assembly Facility. NASA expected the core stage, complete with engines, to be delivered to the Kennedy Space Center in summer 2023.[13] In May, they pushed the delivery date five months back to late fall 2023.[14][15] The RS-25 engines now installed on the core stage in New Orleans as of September 25, 2023 have serial numbers E2047, E2059, E2062, and E2063.[16][17]

The crew was announced on April 3, 2023, as stated by NASA Administrator Bill Nelson, in his "State of NASA" speech reacting to President Joe Biden's FY2024 budget proposal.[18] The announcement occurred at a special event at a NASA facility at Ellington Field outside Houston.[19] They showed up later that day at nearby NRG Stadium for the 2023 March Madness championship game.[20]

Proposed secondary payloads

MPCV Stage Adapter for CubeSat spring-loaded dispensers

NASA's CubeSat Launch Initiative (CSLI) sought proposals in 2019 from U.S. institutions and U.S. companies to fly their CubeSat missions as secondary payloads aboard the SLS on the Artemis 2 mission.[21][22] NASA would accept proposals for both 6-unit (12 kg, 26 lb) and 12-unit (20 kg, 44 lb) CubeSats.[23] As with the Artemis 1 mission, the CubeSats flying on Artemis 2 were to be mounted on the inside of the stage adapter ring between the SLS upper stage and the Orion spacecraft, and will be deployed after Orion separates.[23] Selections were initially planned to be made by February 2020,[21] but the month passed with no official announcement. In October 2021, NASA dropped all secondary payloads from the mission.[24]

Launch date

During preliminary reviews in 2011, the launch date was placed somewhere between 2019 and 2021, but afterwards the launch date was delayed to 2023 on an SLS launch vehicle.[25][26] Although, as of March 2023, the mission is pegged for a November 2024 launch,[1] the need to recycle and refurbish components from Orion that flew on Artemis 1 may push this back to later in 2024 or the first quarter of 2025.[27]

Crew

Prime crew
Position Astronaut
Commander United States Reid Wiseman, NASA
Second spaceflight
Pilot United States Victor Glover, NASA
Second spaceflight
Mission Specialist United States Christina Koch, NASA
Second spaceflight
Mission Specialist Canada Jeremy Hansen, CSA
First spaceflight

Artemis 2 is to be crewed by four astronauts: Commander Reid Wiseman, Pilot Victor J. Glover, Mission Specialist Christina Koch, and Mission Specialist Jeremy Hansen.[28]

Glover, Koch, and Hansen are to be the first person of color, woman, and non-American to go beyond low Earth orbit respectively.[28] Hansen is Canadian and is of the Canadian Space Agency;[28] a 2020 treaty between the United States and Canada actualized his involvement.[29]

Mission

The Artemis 2 mission plan is to send four astronauts in the first crewed Orion MPCV spacecraft into a lunar flyby for a maximum of 21 days using the Block 1 variant of the Space Launch System. The mission profile is a multi-trans-lunar injection (MTLI), or multiple departure burns, and includes a free-return trajectory from the Moon. The Orion spacecraft will be sent to a high Earth orbit with a period of roughly 24 hours. During this time the crew will perform various checkouts of the spacecraft's life support systems as well as an in-space rendezvous and proximity operations demonstration using the spent Interim Cryogenic Propulsion Stage (ICPS) as a target. When Orion reaches perigee once again, it will fire its main engine to complete the TLI maneuver, which will send it to a lunar free-return trajectory, before returning to Earth.[3][30]

Optical communications

Artemis 2 will test and demonstrate optical communications to and from Earth using the Orion Artemis II Optical Communications System (O2O).[31] The O2O hardware will be integrated into the Orion spacecraft and includes an optical module (a 4 in [100 mm] telescope and two gimbals), modem and control electronics.[31] O2O will communicate with ground stations in California and New Mexico.[31] The test device will send data to Earth with a downlink rate of up to 260 megabits per second.[32]

Similar missions

Flown

In December 1968, the Apollo 8 mission, crewed by astronauts Frank Borman, Jim Lovell, and William Anders, flew their command and service module beyond low Earth orbit and completed ten orbits of the Moon. Similar to the planned Artemis 2 mission in that it was crewed and did not land, it differed by being placed into orbit.[33] Apollo 13 (1970) was the only Apollo mission that flew past the Moon by a free-return trajectory.

Proposed

In 2005, the company Space Adventures announced plans for a lunar tourism mission to take two tourists within 100 km (62 mi) of the lunar surface using a Soyuz spacecraft piloted by a professional cosmonaut. The mission, named DSE-Alpha, has been priced at US$150 million per seat and was expected to last 8–9 days when scheduled. Company CEO Eric Anderson stated in 2011 that one seat had been sold, but the launch date has continually slipped since the second seat remains unsold as of 2017.[34]

A SpaceX lunar tourism mission was initially proposed for late 2018 and would have been similar to Artemis 2 in crew size, with two space tourists paying for a free-return loop around the Moon and back to Earth, using the Crew Dragon capsule and launched on the Falcon Heavy.[35][36] After the first flight of Falcon Heavy in 2018, SpaceX announced that Falcon Heavy would not be used for crewed flights to focus their future development on Starship and indicated that the lunar mission would more likely be carried out with the Starship.[37][38] On 14 September 2018, SpaceX officially announced that it had signed one of the paying passengers, Yusaku Maezawa, for the #dearMoon project mission using Starship and that he would invite six to eight artists to join him.[39][40]

References

  1. "NASA's Artemis 2 mission around Moon set for November 2024". Phys.org. Agence France-Presse. 7 March 2023. Archived from the original on 7 March 2023. Retrieved 8 March 2023.
  2. Hill, Bill (March 2012). "Exploration Systems Development Status" (PDF). NASA Advisory Council. Archived from the original on 11 February 2017. Retrieved 21 July 2012. Public Domain This article incorporates text from this source, which is in the public domain.
  3. Hambleton, Kathryn (27 August 2018). "First Flight With Crew Important Step on Long-Term Return to Moon". NASA. Archived from the original on 30 August 2018. Retrieved 6 April 2023.
  4. Artemis: brand book (Report). Washington, D.C.: National Aeronautics and Space Administration. 2019. NP-2019-07-2735-HQ. MISSION NAMING CONVENTION. While Apollo mission patches used numbers and Roman numerals throughout the program, Artemis mission names will use a Roman numeral convention. Public Domain This article incorporates text from this source, which is in the public domain.
  5. Foust, Jeff (25 March 2015). "NASA Selects Boulder Option for Asteroid Redirect Mission". SpaceNews. Archived from the original on 7 October 2023. Retrieved 27 March 2015.
  6. Wall, Mike (10 April 2013). "Inside NASA's Plan to Catch an Asteroid (Bruce Willis Not Required)". Space.com. Archived from the original on 1 August 2019. Retrieved 10 April 2013.
  7. Foust, Jeff (14 June 2017). "NASA closing out Asteroid Redirect Mission". SpaceNews. Archived from the original on 15 June 2017. Retrieved 9 September 2017.
  8. Hambleton, Kathryn (4 August 2017). "NASA's First Flight With Crew Will Mark Important Step on Journey to Mars". NASA. Archived from the original on 28 July 2020. Retrieved 8 December 2017. Public Domain This article incorporates text from this source, which is in the public domain.
  9. Gebhardt, Chris (6 April 2017). "NASA finally sets goals, missions for SLS – eyes multi-step plan to Mars". NASASpaceflight.com. Archived from the original on 21 August 2017. Retrieved 3 May 2017.
  10. "NASA FY 2019 Budget Overview" (PDF). NASA. p. 14. Archived (PDF) from the original on 4 December 2019. Retrieved 12 November 2021. Supports launch of the Power and Propulsion Element on a commercial launch vehicle as the first component of the LOP - Gateway Public Domain This article incorporates text from this source, which is in the public domain.
  11. Berger, Eric (13 April 2018). "NASA may fly crew into deep space sooner, but there's a price". Ars Technica. Archived from the original on 26 October 2019. Retrieved 6 April 2023. Without the Exploration Upper Stage, NASA will not be able to fly, in a single flight, crew members and pieces of a deep space gateway it hopes to build near the Moon in the 2020s
  12. Foust, Jeff (10 February 2021). "NASA selects Falcon Heavy to launch first Gateway elements". SpaceNews. Archived from the original on 7 October 2023. Retrieved 4 September 2022.
  13. Richardson, Derek (23 March 2023). "Artemis 2 Space Launch System core stage nearly complete". SpaceFlight Insider. Archived from the original on 31 March 2023. Retrieved 31 March 2023.
  14. Clark, Stephen (29 September 2023). "Rocket Report: Iran launches satellite; Artemis II boosters get train ride". Ars Technica. Archived from the original on 29 September 2023. Retrieved 2 October 2023.
  15. Sloss, Philip (2 May 2023). "Artemis II Moon mission transitioning from planning to preparation". NASASpaceFlight.com. Archived from the original on 2 May 2023. Retrieved 6 June 2023.
  16. Mohon, Lee; O’Brien, Kevin (27 October 2022). "Space Launch System Engines: Launching Artemis Astronauts to the Moon". NASA. Archived from the original on 26 June 2023. Retrieved 26 June 2023.
  17. Mohon, Lee (25 September 2023). "All Engines Added to NASA's Artemis II Moon Rocket Core Stage – Artemis". NASA Blogs. Archived from the original on 25 September 2023. Retrieved 25 September 2023.
  18. Foust, Jeff (9 March 2023). "White House proposes $27.2 billion for NASA in 2024". SpaceNews. Archived from the original on 7 October 2023. Retrieved 10 March 2023.
  19. Pearlman, Robert Z. (3 April 2023). "NASA Announces the Astronaut Crew for Artemis II Lunar Flyby". Scientific American. Archived from the original on 3 April 2023. Retrieved 3 April 2023.
  20. Koch, Christina (11 April 2023). "You stood. All of you. You stood for taking on the challenge. For doing things that are hard. For exploring together. Of all the things we did last week to introduce Artemis II, this unexpected standing ovation was the moment I realized—You're all behind this. We are going". Twitter. Retrieved 13 April 2023.
  21. Hill, Denise (6 August 2019). "NASA's CubeSat Launch Initiative Opens Call for Payloads on Artemis 2 Mission". NASA. Archived from the original on 6 August 2019. Retrieved 6 August 2019. NASA is seeking proposals from U.S. small satellite developers to fly their CubeSat missions as secondary payloads aboard the SLS on the Artemis 2 mission under the agency's CubeSat Launch Initiative (CSLI) Public Domain This article incorporates text from this source, which is in the public domain.
  22. Klotz, Irene (5 August 2019). "NASA Scouting Cubesats For Artemis-2 Mission". Aviation Week & Space Technology. Archived from the original on 6 August 2019. Retrieved 6 August 2019. NASA on August 5 released a solicitation for cubesats to ride along with the first crewed flight of the Space Launch System rocket and Orion capsule, with the caveat that selected projects fill strategic knowledge gaps for future lunar and Mars exploration
  23. Foust, Jeff (8 August 2019). "NASA seeking proposals for cubesats on second SLS launch". SpaceNews. Archived from the original on 15 May 2023. Retrieved 6 April 2023.
  24. Kurkowski, Seth (21 October 2021). "Alabama students forced to pivot satellite design after being dropped from Artemis II". Space Explored. Archived from the original on 21 October 2021. Retrieved 13 December 2021.
  25. Hambleton, Kathryn (8 March 2019). "NASA's Deep Space Exploration System is Coming Together". NASA. Archived from the original on 1 August 2019. Retrieved 10 March 2019. Public Domain This article incorporates text from this source, which is in the public domain.
  26. Sloss, Philip (28 December 2018). "Crewed Orion spacecraft passes critical design review". NASASpaceFlight.com. Archived from the original on 16 February 2019. Retrieved 9 March 2019.
  27. Howell, Elizabeth (16 November 2022). "NASA's Artemis 2 mission: Taking humans around the moon". Space.com. Archived from the original on 18 August 2022. Retrieved 30 November 2022.
  28. Connolly, Amanda (16 December 2020). "A Canadian astronaut will be on NASA's Artemis deep space lunar orbit as well the first non American to leave earth orbit". Global News. Archived from the original on 16 December 2020. Retrieved 16 December 2020.
  29. Sloss, Philip (25 June 2020). "NASA studying practice rendezvous options for Artemis 2 Orion". NASASpaceFlight.com. Archived from the original on 27 June 2021. Retrieved 27 June 2021.
  30. Murphy, Kendall (3 June 2021). "Lasers Light the Way for Artemis II Moon Mission". Exploration and Space Communications. NASA. Archived from the original on 3 June 2021. Retrieved 6 April 2023.
  31. Schauer, Katherine (11 August 2022). "What's Next: The Future of NASA's Laser Communications". NASA. Archived from the original on 3 March 2023.
  32. Wood, Charlie (25 February 2017). "Apollo 8 redux: Why NASA may send humans around the Moon, again". The Christian Science Monitor. Archived from the original on 4 March 2017. Retrieved 4 March 2017.
  33. Moseman, Andrew (26 April 2011). "Just One US$150 Million Seat Remains on Space Adventures' Lunar Flyby". Popular Mechanics. Archived from the original on 18 October 2016. Retrieved 4 June 2017.
  34. Grush, Loren (3 March 2017). "SpaceX promises a Moon vacation in 2018". The Verge. Archived from the original on 3 March 2017. Retrieved 4 March 2017 via YouTube.
  35. Trumbore, Dave (27 February 2017). "SpaceX Will Attempt to Send Humans Around the Moon Next Year". Nerdist. Archived from the original on 5 March 2017. Retrieved 4 March 2017.
  36. Foust, Jeff (6 February 2018). "SpaceX no longer planning crewed missions on Falcon Heavy". SpaceNews. Archived from the original on 20 February 2022. Retrieved 6 April 2023.
  37. Pasztor, Andy (6 February 2018). "Elon Musk Says SpaceX's New Falcon Heavy Rocket Unlikely to Carry Astronauts". The Wall Street Journal. Archived from the original on 6 February 2018. Retrieved 6 February 2018.
  38. Ralph, Eric (14 September 2018). "SpaceX has signed a private passenger for the first BFR launch around the Moon". Teslarati. Archived from the original on 14 September 2018. Retrieved 14 September 2018.
  39. Grush, Loren (14 September 2018). "SpaceX says it will send someone around the Moon on its future monster rocket". The Verge. Archived from the original on 14 September 2018. Retrieved 15 September 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.