British Rail Class 395

The British Rail Class 395 Javelin is a dual-voltage electric multiple-unit (EMU) passenger train built by Hitachi Rail as part of the Hitachi A-train AT300 family for high-speed commuter services on High Speed 1 and elsewhere on the South Eastern franchise.[9][10] The whole fleet is operated by Southeastern.

British Rail Class 395
Javelin
Class 395 at Dover Priory station in August 2020
A Class 395 at Dover Priory in 2020
The standard class interior of a Class 395
In service2009–present
ManufacturerHitachi Rail
Built at
Family nameA-train
Constructed2007–2009
Entered service29 June 2009[2][3]
Number built29
Number in service29
Formation
  • 6 cars per unit:
  • DPT-MS-MS-MS-MS-DPT[4]
Fleet numbers395001–395029
Capacity340 seats, plus 12 tip-up[5]
Operator(s)Southeastern
Depot(s)
Line(s) served
Specifications
Car body constructionAluminium
Train lengthAbout 122 m (400 ft 3 in)[5]
Car length
  • DPT vehs.: 20.88 m (68 ft 6 in)
  • Others: 20.00 m (65 ft 7 in)
Width2.810 m (9 ft 2.6 in)
Height3.817 m (12 ft 6.3 in)
Floor height1.235 m (4 ft 0.6 in)
Doors
  • Single-leaf sliding,
  • each 1.12 m (3 ft 8 in) wide[6]
  • (2 per side per car)
Maximum speed
  • AC power:
  • 140 mph (225 km/h)
  • DC power:
  • 100 mph (160 km/h)
Weight
Traction systemHitachi IGBT-VVVF
Traction motors
  • 16 × 210 kW (280 hp)
  • (4 per MS car)
Power output3,360 kW (4,510 hp)
Acceleration0.7 m/s2 (2.3 ft/s2)
Deceleration
  • Normal: 0.9 m/s2 (3.0 ft/s2)
  • Maximum: 1.2 m/s2 (3.9 ft/s2)
Auxiliaries
  • 3 × 110 kVA
  • (3-phase 400 V AC + 110 V DC)
Electric system(s)
Current collector(s)
UIC classification
  • 2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
Braking system(s)Electro-pneumatic
Safety system(s)
Multiple workingWithin class
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sourced from [7][8] except where noted

The Class 395 can operate at a maximum speed of 140 mph (225 km/h) under 25 kV AC overhead electrification on High Speed 1, and 100 mph (160 km/h) on 750 V DC third rail supply on conventional lines. It is typically formed as a six-car train, although they can be rapidly coupled to one another to form a 12-car train as required. The type, which was entirely manufactured in Japan, is the first Hitachi-built rail vehicle to be sold to a European customer,[11][12] as well as being the first British order for a Japanese train.[6] The fleet was ordered during June 2005 by HSBC Rail, and was delivered to the UK between August 2007 and August 2009. Following the completion of 4,000 miles (6,400 km) fault-free running six months ahead of schedule, a 'preview' service was launched between London St Pancras and Ashford via Ebbsfleet on 18 June 2009.[6] These were gradually expanded until the commencement of the full regular service on 13 December 2009.[3]

The use of the high-speed trains as part of the transport infrastructure for the Olympic Park formed part of the original bid for the 2012 Summer Olympics.[13][14] The service was named the Olympic Javelin, which formed the origin of the Javelin nickname.[15] The Olympic services began 28 July 2012.[16] Furthermore, the Class 395 has also been irregularly operated for charter services  though the first such uses did not happen until after the 2012 Olympics due to a lack of free units.[17]

History

Background

In December 2003, formal approval was given by the Strategic Rail Authority for domestic services to be run on the under-construction Channel Tunnel Rail Link (CTRL) in Kent, England, which has since been rebranded as High Speed 1 (HS1).[18] Preliminary consultations for a new franchise including the envisioned 'CTRL Domestic' services along with new rolling stock for operating the said services, which were to begin in 2004.[19] In 2005, the proposed high-speed services were combined with those from the former South Eastern rail franchise to form the Integrated Kent franchise (IKF).[20]

In October 2004, Hitachi was announced as the preferred bidder to supply high-speed trains for the CTRL services.[8][21][22][23] During June 2005, a contract valued at £250 million was signed with Hitachi Europe to supply 28 units, with Eversholt Rail Group acting as the financier (ROSCO); at this point, the new fleet had an expected service date of 2009.[24][25][26][27] In November 2005, the Department for Transport announced Govia as the new operator of the IKF.[28]

The contract was Hitachi's first rail vehicle sold to a European customer.[11][12] The company had previously worked with HSBC Rail and UK rail authorities between 2002 and 2003 to demonstrate that the company's traction system was suitable for use on the Great Britain rail network, including testing asynchronous AC motors and confirming electromagnetic compatibility, as part of a separate contract involving the upgrade of existing Class 465 and 466 EMUs.[29] The contract was also the first British order for a Japanese train; as such, Hitachi viewed the deal as a key opportunity to establish itself in the UK market.[6][30]

Construction of the CTRL (High Speed 1) was complete in November 2007. By 2008, the initially planned 'CTRL Domestic' services (2003) from London St Pancras to Gravesend, and Canterbury West and Folkestone Central, via Ashford, had been expanded in scope to include services to Medway Towns, East Kent and Dover.[31] Furthermore, a 29th train was added to the order agreement by franchise holder Southeastern so as to provide additional capacity.[1]

Maintenance depots and training

The contract for the trains included maintenance of the trains;[32] according to Hitachi, the maintenance techniques and schedules of which being initially generated from experience of their Shinkansen cousins in Japan.[33] Maintenance services are provided via a consortium, referred to as 'DEPCO', which included HSBC Rail (finance), Fitzpatrick Contractors Ltd (construction), RPS Burks Green (architects/civil engineers), EMCOR UK (mechanical and electrical plant) and GrantRail (trackwork) constructed a new maintenance depot building at Ashford and the updating of the existing depot site.[4][34][35][36]

The new Ashford Depot was constructed on the site of the Ashford Down Yard Carriage Sidings,[37][note 1] and formally opened on 2 October 2007.[38] The facility included a five-track trainshed with bogie drop made by BBM and train lifting equipment from Mechan. A second building housed a wheel lathe from Sculfort. Other facilities included carriage washing plant, a 25 kV OHL test track, and sidings for rolling stock.[36] The design and layout of the depot, which was optimised specifically for the Class 395, enables the most efficient workflow possible, including minimal complex shunting actions, physical minimisation wherever reasonable, and in line with modern data management practices.[39]

A Class 395 train simulator supplied by Corys TESS was acquired for use at Southeastern's training centre in Ashford for driver training.[40][41] Southeastern's co-parent company SNCF also assisted with high-speed driver training.[42] The DEPCO consortium also updated Ramsgate train depot for the IKF with facilities including storage sidings for the Class 395 trains and light maintenance facilities.[36]

Testing and preview service

Cab interior on display at Railfest 2012

Pre-shipping factory tests included static and dynamic load tests, traction and braking tests, including tests on a 750 V DC third-rail system specially installed at Hitachi's test track.[43] This round of manufacturer tests included the use of supercomputers to conduct both simulations and verification tests.[30]

The first train was delivered from Japan to Southampton Docks on 23 August 2007.[44] Days later, it was unveiled by Secretary of State for Transport Ruth Kelly at a media event held at Hitachi's new Ashford maintenance facility.[6] Following the delivery of the first four units in March 2008, production was temporarily put on hold while these units were subjected to extensive UK-based testing. Homologation testing was undertaken by Serco.[45][46] SNCF International assisted with testing of KVB and TVM 430 signalling systems, with speeds of 240 km/h (150 mph) attained in January 2008.[43][47]

Following the successful completion of these tests, production and shipping of the main production tranche commenced in December 2008.[6][48][49] Each train was required to demonstrate 5,000 mi (8,000 km) of fault-free operations prior to their acceptance by Southeastern.[6] The final three trains arrived in the UK in August 2009,[2][1][50] with the final train delivered to Southeastern on 11 December 2009.[51]

The performance metric of 4,000 miles (6,400 km) fault-free running was achieved six months ahead of schedule, clearing the way for a 'preview' service to be offered between London St Pancras and Ashford via Ebbsfleet. On 18 June 2009, these were ceremonially launched by the Secretary of State for Transport Andrew Adonis, although the preview service only became available to general passengers on 29 June.[6] The preview service allowed for further train testing under real-world conditions,[52] during which the type reportedly achieved a 99% punctuality rate in the first month of operations.[2][1][53] In September 2009, preliminary services were launched to the Kent coast (Dover via Folkestone, and Ramsgate via Canterbury).[54][55][56] During November 2009, preview services commenced on the North Kent line as well.[57][58]

Even during the preview service, the Class 395 presented several performance improvements in comparison to conventional rolling stock, including its high rate of acceleration, lower noise levels (primarily attributed to its air conditioning arrangements), and its aesthetic appeal. Railway journalist Richard Clinnick observed several minor shortcomings of the interior, such as the somewhat cramped seating arrangement and the lack of securing straps at the baby changing facility, but positively reviewed the overall package.[6] In September 2010, it was reported that several passengers were concerned by the presence of a 'wobbling' motion that occurred within some tunnel sections; the phenomenon was described by Southeastern as non-dangerous, but all trains were fitted with dampers that prevent any recurrence of the issue.[59][60]

Operations and performance

Southeastern High Speed
St Pancras International London UndergroundEurostar
Stratford International Docklands Light Railway
Ebbsfleet International
Gravesend
Strood
Rochester
Chatham
Gillingham
Rainham
Sittingbourne
Faversham
Whitstable
Herne Bay
Birchington-on-Sea
Margate
Broadstairs
Ramsgate
Ashford International
Canterbury West
Sandwich
Deal
Walmer
Martin Mill
Folkestone West
Folkestone Central
Dover Priory
High Speed 1
Station with limited or peak-hour-only High Speed service

A full regular service commenced on 13 December 2009.[3][61] Initial services included a half-hourly north Kent service to and from St Pancras, London, via Stratford, Ebbsfleet, Gravesend, Strood, Rochester, Chatham, Gillingham, Rainham, and Sittingbourne to Faversham, a half-hourly service to East Kent via Stratford, Ebbsfleet, Ashford with one train continuing to Margate via Canterbury West, Ramsgate and Broadstairs, with the other to Dover via Folkestone West and Folkestone Central.[62] Seven million journeys were made in the first year of operation.[63]

The introduction of the trains was generally successful, with good reliability and passenger satisfaction figures. The new high-speed services also caused an increase in passenger numbers above that already being experienced on the Kent network.[64][65][66] On introduction, timetabled journeys to London from Ebbsfleet were reduced from 51 to 18 minutes, whilst trains using the entire length of High Speed 1 (starting in Ashford) had timetabled journeys reduced by around 45 minutes.[67] However, the service has been criticised as being of limited use to many London commuters because trains terminate at St Pancras. Additionally, the change in service patterns to accommodate high-speed trains resulted in some non-high-speed services in Kent becoming slower.[68]

In May 2011, a limited service from Maidstone West via Strood and Gravesend started,[69] followed in September 2011 by a limited service from Sandwich via Deal to London St Pancras (partially subsidised by Kent County Council).[70][71] In 2013, four years after the service started, total passenger numbers were ten million and punctuality was 92.6% (compared to 90.1% nationwide).[72]

Design

A unit with the nosecone opened and coupler visible

The 400 Series Mini Shinkansen[73] and Hitachi's A Train design form the basis of the Class 395 design.[8][6] From the 400 Series the class inherits the same six-car 20-metre carriage with doors at one-third and two-thirds along the carriage.[note 2] Both types of train are designed for operations at high speed on newly built lines, as well as at lower speed on conventional legacy lines.[74] Unlike the steel-bodied 400 Series, the Class 395 has its carbody (walls, roof, floor) formed from friction stir welded (FSW) double-walled hollow extruded aluminium body panels, a technology that Hitachi Rail considers to be a part of its A-Train train family specification.[8][75] The manufacturer claims that the FSW approach achieves minimal strain while providing a lightweight and high strength carbody in comparison to conventional techniques.[75]

Each Class 395 unit contains six cars, formed DPT1-MS1-MS2-MS3-MS4-DPT2.[note 3] The intermediate cars carry the traction motors - one at each axle - while the unpowered outer cars carry the pantographs.[7] The bogies are bolsterless, with both powered and unpowered bogies sharing a common design to simplify maintenance.[75] Each six-car unit can work in multiple with another to create 12-car trains. The coupling process is automated and has been designed to take less than 60 seconds.[75][76]

The propulsion system of the Class 395 comprises 16 electric motors each rated to produce 210 kW (280 hp) that work in conjunction with four IGBT converter/inverter units.[7] In combination with its braking system, it can achieve a peak acceleration rate of 0.7 m/s2 (2.3 ft/s2) and a normal maximum deceleration rate of 0.9 m/s2 (3.0 ft/s2), although the latter can be elevated to 1.2 m/s2 (3.9 ft/s2) under emergency circumstances. The train uses an electrically operated air brake system, supplied by Faiveley.[77][7] Approximately 40% of the train's components were sourced from suppliers within the European Union.[78]

Each six-car train is fitted with 340 seats in 2+2 formation, all standard class, with an additional twelve tip-up priority seats located in an indicated wheelchair area near the vestibules of the DPT1 vehicle.[6] There is no separation between the vestibules and the main interior save for wind shields.[79] There are two toilets per unit, one of which is larger and designed to be universally accessible.[5][80][81] The seats are mostly arranged 'airline' style, though there are also a small number of table seats present in each car.[6] Nearly all seats feature flip-down tables and coat hooks, while a single electrical socket has been provided for each pair of seats. The interior design and layout is in conformance with the Rail Vehicle Accessibility Regulations 2010.[79]

The trains meet UK Railway Group Standards (RGS), and European Union Technical Specifications for Interoperability (TSI) standards for crashworthiness, and UK or EU standards for structure-load-bearing behaviour, material strength, aerodynamics, noise and fire resistance.[82] Key areas of the train's design that were heavily influenced by these standards were its fireproofing measures and crashworthiness approach, which Hitachi observed to bear considerable differences with their corresponding Japanese standards.[83] In addition to the applicable standards, the Class 395 was greatly shaped by the various criteria specified by the customer. Wherever it has been beneficial to do so, the various technologies and new approaches developed for the type have been incorporated by Hitachi back into its main product lines.[84]

Each train is equipped with a computer-based Train Management System (TMS), which incorporates numerous monitoring systems, communications, environmental controls, and enables the train crew to control various onboard systems, including Selective Door Operation (SDO). The TMS features considerable redundancy, which has enabled it to obtain a SIL 2 safety certification.[85] The SDO system uses a combination of GPS and train speed integration to estimate its position and identify the station at which the train has stopped, simplifying the correct door selection sequence.[85] For reliability, passenger doors use a relatively simple sliding pneumatic system that has already been in use for several decades on Shinkansen trains.[4][86]

The fleet is currently being refurbished at a cost of £27 million. New carpets, lighting, customer information and digital media screens and USB sockets are being installed. Panels and seat grab handles are being repainted and seat covers are being replaced.[87]

Named units

A mockup Class 395 unit was named after athlete Dame Kelly Holmes; the name was subsequently transferred to an operational unit and 11 other "fast Britons"  Jamie Staff, Steve Backley, Sir Steve Redgrave, Rebecca Adlington, Sir Chris Hoy, Ben Ainslie, Daley Thompson, Duncan Goodhew, Katherine Grainger, Lord Sebastian Coe, and Dame Tanni Grey-Thompson; all Olympic/Paralympic medallists  were selected in a public vote.[88]

Following the 2012 Olympics and Paralympics, Southeastern announced that another 12 units would be named after members of Team GB, including Alistair Brownlee, Ed Clancy, Hannah Cockroft, Jessica Ennis, Mo Farah, Jason Kenny, Jonnie Peacock, Victoria Pendleton, Ellie Simmonds, Dame Sarah Storey, Laura Trott, and David Weir.[89]

Some units have subsequently received other names.

Unit Name
395001 Dame Kelly Holmes
395002 Sebastian Coe
395003 Sir Steve Redgrave
395004 Sir Chris Hoy
395005 Dame Tanni Grey-Thompson
395006 Daley Thompson
395007 Steve Backley
395008 Ben Ainslie
395009 Rebecca Adlington
395010 Duncan Goodhew
395011 Katherine Grainger
395012 #trainbow[90]
395013 Hornby Visitor Centre[91]
395014 The Victoria Cross[17] (2014–2015)
Dina Asher-Smith[92]
395015 Live On[17] (2015–2016)
Southeastern Highspeed 10 Years 2009–2019 (2019 onwards)[93]
395016 Jamie Staff
Somme 100[17] (2016–2017)
395017 Dame Sarah Storey
The Passchendaele Javelin[94] (2017–2019)
395018 Mo Farah (2013–2017)
The Victory Javelin[17]
395019 Jessica Ennis
395020 Jason Kenny
395021 Ed Clancy MBE
395022 Alistair Brownlee
395023 Ellie Simmonds
395024 Jonnie Peacock
395025 Victoria Pendleton
395026 Marc Woods
395027 Hannah Cockroft
395028 Laura Trott
395029 David Weir

Fleet details

Class Operator Qty. Year built Cars per unit Unit nos.
395 Southeastern 29 2007–2009 6 395001–395029
Diagram

Accidents

  • At 3pm on 23 October 2017, 395008 (heading towards London St Pancras) struck a delivery van on a level crossing near Teynham between Faversham and Sittingbourne.[95]

Model railways

In 2009 Hornby Railways launched two model versions of the BR Class 395, a super detailed model, and a basic representation of the prototype as part of their Railroad range both in South Eastern Blue livery and in 2012 Hornby released a special Olympic Games Livery in both super detail and basic in OO gauge.[96]

See also

Notes

  1. 51.14187°N 0.88105°E / 51.14187; 0.88105
  2. This layout, often used for commuter trains, was selected in order to fulfil requirements that the train have a maximum station dwell time not exceeding 90 seconds.[4]
  3. DPT = Driver's cab, Pantograph, Trailer car; MS = Motor car, Standard class (open saloon).[4] Some sources refer to the cars as DPTSO (Driver's cab, Pantograph, Trailer car, Second class, Open saloon) and MSO (Motor car, Second class, Open saloon) respectively.

References

  1. "Final Class 395 train arrives in Southampton, begins last leg of journey to depot in Ashford" (PDF). London: Hitachi Europe. 17 August 2009. Archived from the original (PDF) on 2 November 2013. Retrieved 26 November 2022.
  2. "Final Class 395 docks in Southampton". Railway Gazette International. Sutton: DVV Media International. 17 August 2009. Archived from the original on 25 November 2009. Retrieved 26 November 2022.
  3. "High-speed travel for commuters". BBC News. London: British Broadcasting Corporation. 14 December 2009. Retrieved 26 November 2022.
  4. "Hitachi Class 395 – an update". RailwayPeople. Derby: RailStaff Publications. 15 August 2008. Archived from the original on 5 November 2013. Retrieved 26 November 2022.
  5. Mochida et al. 2010, p. 41, Fig. 3 "Train Formation"
  6. Clinnick, Richard (12 August 2009). "Javelin set to hit its targets". Rail Magazine. Peterborough. Archived from the original on 20 January 2016. Retrieved 26 November 2022.
  7. Mochida et al. 2010, p. 40, Table 1 "Key Rolling Stock Specifications"
  8. "Hitachi preferred for CTRL domestic trains". Railway Gazette International. Sutton: DVV Media International. 1 December 2004. Archived from the original on 4 October 2012. Retrieved 18 July 2009.
  9. "AT300 - Intercity High Speed". Hitachi Rail Europe. Archived from the original on 21 February 2020. Retrieved 23 February 2020.
  10. "Class 395 (Javelin)". Hitachi Rail Europe. Archived from the original on 2 March 2017. Retrieved 5 July 2016.
  11. Gomersall 2005.
  12. Kawasaki, Yamaguchi & Mochida 2008.
  13. "London 2012 venue: Olympic zone". BBC News. London: British Broadcasting Corporation. 16 January 2004. London's bid team say the Olympic Park will be served by 10 train lines, including 'Olympic Javelin' bullet trains providing a link to the city centre in seven minutes.
  14. "£20m bullet trains to serve Olympic Park". London 2012. London Organising Committee of the Olympic and Paralympic Games. 28 October 2004. Archived from the original on 12 August 2012. Retrieved 7 August 2012.
  15. "Javelin train speeds into London". BBC News. London: British Broadcasting Corporation. Retrieved 26 November 2022.
  16. "High speed trains to ferry spectators to Olympic Park". ITV News. London: ITV. 27 July 2012. Archived from the original on 29 July 2012. Retrieved 26 November 2022.
  17. Lindsay, Doug (15 September 2019). "Operation 'Javelin'". The Railway Magazine. Horncastle: Mortons Media Group. Archived from the original on 5 August 2020. Retrieved 26 November 2022.
  18. "Green Light for High Speed Services for Kent: Four Bidders Selected for new Kent Franchise". London: Strategic Rail Authority. Archived from the original on 16 January 2004. Retrieved 26 November 2022.
  19. Christopher, Clark (Spring 2004). Baker, Laurie (ed.). "Commuter Services on Channel Tunnel Rail Link and the Integrated Kent Franchise (Report of Meeting at University College London on 28 January 2004)" (PDF). Journal of the Transport Economists' Group. 31 (1): 7–11. Archived (PDF) from the original on 21 October 2020. Retrieved 26 November 2022.
  20. Integrated Kent Franchise – Invitation to Tender (PDF). London: Strategic Rail Authority. January 2005. p. 10. Archived from the original (PDF) on 9 April 2010. Retrieved 26 November 2022.
  21. "London's New Bullet Train". Government Office for London. 29 October 2004. Archived from the original on 5 November 2005. Retrieved 26 November 2022.
  22. "Hitachi Named as Preferred Manufacturer to Build High Speed Trains from Kent". London: Department for Transport. 27 October 2004. Archived from the original on 21 December 2005. Retrieved 26 November 2022.
  23. "Hitachi wins Channel Tunnel Rail Link Contract". London: Hitachi Transportation Systems. 28 October 2004. Archived from the original on 19 May 2006. Retrieved 26 November 2022.
  24. "£250 million rolling stock acquisition Hitachi Europe Ltd, HSBC Rail (UK) Ltd, Strategic Rail Authority". International Law Office. Globe Business Publishing. Archived from the original on 5 October 2007. Retrieved 5 January 2012.
  25. "Kent high speed order placed" (PDF). Railway Herald. Vol. 1, no. 11. 10 June 2005. p. 4. Retrieved 26 November 2022.
  26. "News in Brief". Railway Gazette International. Sutton: DVV Media International. 1 July 2005. Archived from the original on 4 November 2012. Retrieved 4 August 2009.
  27. "£250 Million Contract Signed for New High Speed Train Fleet for Kent". London: Department for Transport. 1 June 2005. Archived from the original (PDF) on 8 August 2008. Retrieved 4 January 2008.
  28. "Department for Transport announces integrated Kent franchise". London: Department for Transport. 30 November 2005. Archived from the original on 15 June 2011. Retrieved 26 November 2022.
  29. Ojima, Hirofumi (24 January 2008). "Networkers get a traction transplant". Railway Gazette International. Sutton: DVV Media International. Archived from the original on 1 October 2012. Retrieved 26 November 2022.
  30. "High-speed trains, driven by superior Japanese technologies, run in the U.K., the birthplace of railways". Social Innovation Case Studies. Hitachi. June 2017. Archived from the original on 9 May 2019. Retrieved 26 November 2022.
  31. Kent County Council 2008, para. 2.2.6
  32. Mochida et al. 2010, pp. 44–45 Maintenance
  33. Mochida et al. 2010, p. 45 Maintenance Plan
  34. "Hitachi unveils "Bullet Train" at new Ashford depot". London: Hitachi Europe. 2 October 2007. Archived from the original on 24 December 2007. Retrieved 26 November 2022.
  35. "Train Lifting-Gear Deals Won". Sheffield: Mechan. 17 December 2007. Archived from the original on 16 August 2010. Retrieved 5 January 2012.
  36. "Fitzpatrick: new depots, new division". Railway Strategies. Norwich: Schofield Publishing. 11 March 2008. Archived from the original on 24 September 2015. Retrieved 26 November 2022.
  37. Integrated Kent Franchise Stakeholder Briefing Document (PDF). London: Strategic Rail Authority. January 2005. p. 19. Archived from the original (PDF) on 5 October 2011. Retrieved 26 November 2022.
  38. "At home with the High Speed 1 domestic stock". Railway Gazette International. Sutton: DVV Media International. 30 October 2007. Archived from the original on 11 August 2011. Retrieved 26 November 2022.
  39. Mochida et al. 2010, pp. 44–45 Construction of Maintenance Depot
  40. "High-speed simulator". Railway Strategies. Norwich: Schofield Publishing. 1 November 2007. Archived from the original on 4 March 2016. Retrieved 26 November 2022.
  41. "SouthEastern drivers commence class 395 'Javelin' simulator training". Pulborough: Railway Performance Society. 1 October 2008. Archived from the original on 4 March 2016. Retrieved 26 November 2022.
  42. "High Speed in the UK". Paris: Keolis Group. Archived from the original on 8 November 2011. Retrieved 1 January 2012.
  43. "Hitachi high speed Javelin train ready to ship to UK". Associated Society of Locomotive Engineers and Firemen. Retrieved 1 January 2012.
  44. "Japanese bullet train docks in UK". BBC News. London: British Broadcasting Corporation. 23 August 2007. Retrieved 26 November 2022.
  45. "Hitachi Class 395 EMU arrives in Britain". Railway Gazette International. Sutton: DVV Media International. 23 August 2007. Archived from the original on 4 August 2009. Retrieved 26 November 2022.
  46. "New rolling stock for the Olympic Javelin service". Hook: Serco Limited. Archived from the original on 25 February 2011. Retrieved 1 January 2012.
  47. Rapport d'Activité 2008 (PDF) (in French). Paris: SNCF International. 18 March 2009. p. 10. Archived from the original (PDF) on 24 August 2009. Retrieved 26 November 2022. Dans le cadre d'un contrat conclu entre SNCF International et Hitachi, des experts du Centre d'Ingénierie du Matériel de la SNCF étaient à bord des trains à Grande Vitesse Class 395 de l'opérateur SouthEastern pour contrôler le bon fonctionnement des équipements de sécurité. Des tests à 240 km/h ont eu lieu en janvier 2008 pour valider définitivement les dispositifs des premières rames livrées en Grande-Bretagne
  48. "First production units of Hitachi Class 395 trains for HS1 service embark on journey from Japan to UK on time" (PDF). London: Hitachi Rail Group. 9 December 2008. Archived from the original (PDF) on 2 November 2013. Retrieved 26 November 2022.
  49. Jordan, Keith. Development of UK Class 395 High Speed Commuter Train (PDF). Hitachi Rail Europe. sec. 3.
  50. Tuplin, Richard, ed. (24 August 2009). "Final three 'Javelin' units arrive at Southampton Docks" (PDF). Railway Herald. No. 191. Northallerton. p. 3. ISSN 1751-8091. Retrieved 26 November 2022.
  51. Tuplin, Richard, ed. (14 December 2009). "Hitachi hands over the final Class 395 'Javelin' EMU" (PDF). Railway Herald. No. 205. Northallerton. p. 7. ISSN 1751-8091. Retrieved 26 November 2022.
  52. "High speed preview services announced". Newcastle upon Tyne: London & South Eastern Railway. 1 June 2009. Archived from the original on 27 August 2011. Retrieved 5 January 2012.
  53. "Southeastern ready to launch High Speed service". Railway Gazette International. Sutton: DVV Media International. 18 June 2009. Archived from the original on 14 August 2011. Retrieved 26 November 2022.
  54. "High speed preview service extends to Dover, Folkestone, Canterbury and Ramsgate". Newcastle upon Tyne: London & South Eastern Railway. 7 September 2009. Archived from the original on 5 January 2011. Retrieved 5 January 2012.
  55. Razaq, Rashid (13 August 2009). "Javelin train boost for Kent coast". London Evening Standard. Archived from the original on 15 December 2013. Retrieved 26 November 2022.
  56. "High-speed rail 'preview' begins". BBC News. London: British Broadcasting Corporation. 7 September 2009. Retrieved 26 November 2022.
  57. "High speed service crowned champion" (PDF). London: Hitachi Rail Europe. 17 September 2010. Archived from the original (PDF) on 6 November 2013. Retrieved 26 November 2022.
  58. "Southeastern win National Rail Award for High Speed preview services". Newcastle upon Tyne: London & South Eastern Railway. 17 September 2010. Archived from the original on 6 November 2013. Retrieved 26 November 2022.
  59. Morris, Thom (8 September 2010). "'Wobbles' corrected on high speed trains". KentOnline. Aylesford: KM Group. Archived from the original on 11 September 2010. Retrieved 6 September 2011.
  60. Tuplin, Richard, ed. (13 September 2010). "Modification programme for Class 395 'wobble' issue" (PDF). Railway Herald. No. 238. Northallerton. p. 4. ISSN 1751-8091. Retrieved 26 November 2022.
  61. Tuplin, Richard, ed. (21 December 2009). "New timetable brought the launch of the full High-Speed commuter service" (PDF). Railway Herald. No. 206. Northallerton. p. 2. ISSN 1751-8091. Retrieved 26 November 2022.
  62. "High speed service". Newcastle upon Tyne: London & South Eastern Railway. 8 October 2008. Archived from the original on 13 September 2012. Retrieved 26 November 2022.
  63. "Over 7 million journeys made on high speed in a year". Newcastle upon Tyne: London & South Eastern Railway. 13 December 2010. Archived from the original on 1 March 2011. Retrieved 5 January 2012.
  64. O'Connor, Adam (13 December 2010). "Over 7 million journeys made on High Speed in a year". Rail-News.com. Derby: Rail Media Group. Archived from the original on 17 April 2014. Retrieved 5 January 2012.
  65. "Domestic High Speed 'attracts 1m new passengers'". Railnews. Wellingborough. 13 December 2010. Archived from the original on 24 December 2010. Retrieved 26 November 2022.
  66. Kent County Council 2008, Fig. 2.5
  67. "High Speeding To Success". Newcastle upon Tyne: London & South Eastern Railway. 14 June 2010. Archived from the original on 25 June 2010. Retrieved 5 January 2012.
  68. "High speed train service 'no use at all' for East Kent". BBC News. London: British Broadcasting Corporation. 5 December 2011. Retrieved 26 November 2022.
  69. "High-speed trains start from Maidstone". KentOnline. Aylesford: KM Group. 20 May 2011. Archived from the original on 24 May 2012. Retrieved 23 May 2011.
  70. "High-speed train boost for Sandwich and Deal in Kent". BBC News. London: British Broadcasting Corporation. 30 April 2011. Retrieved 26 November 2022.
  71. "High speed services have launched from Sandwich and Deal". Newcastle upon Tyne: London & South Eastern Railway. 5 September 2011. Archived from the original on 14 October 2011. Retrieved 5 January 2012.
  72. "The impact of domestic services on High Speed 1". Kent County Council. 4 February 2014. Archived from the original on 3 February 2016. Retrieved 26 November 2022.{{cite web}}: CS1 maint: unfit URL (link)
  73. Kawasaki, Yamaguchi & Mochida 2008, p. 61.
  74. Motraghi 2010, p. 10
  75. Mochida et al. 2010, pp. 40–41 Basic Specifications
  76. Gomersall 2005, p. 12
  77. Brakes & Couplers – Regional Trains (PDF). Saint-Denis: Faiveley Transport. 10 December 2010. References. Archived from the original (PDF) on 2 November 2013. Retrieved 26 November 2022.
  78. Motraghi 2010, p. 16
  79. Mochida et al. 2010, p. 40 Design
  80. Motraghi 2010, pp. 10–11
  81. Pritchard, Robert; Fox, Peter (2009). British Railways Pocket Book No. 4: EMUs and Light Rail Systems, 2010 (23rd ed.). Sheffield: Platform 5 Publishing. ISBN 978-1-90233-676-3.
  82. Kawasaki, Yamaguchi & Mochida 2008, pp. 62–63 Accommodating Specifications
  83. Mochida et al. 2010, p. 41 Creating a Safe and Comfortable Vehicle Environment
  84. Mochida et al. 2010, pp. 45–46 Conclusions
  85. Mochida et al. 2010, pp. 43–44 Train Operation Control Suitable for Operating Practices Specific to UK
  86. Connor, Piers (January 2011). "Rolling Stock Reliability Focus – Dilemmas on Doors" (PDF). Modern Railways. Vol. 68, no. 1. Shepperton: Ian Allan Publishing. p. 61. Archived from the original (PDF) on 3 January 2012. Retrieved 5 January 2012.
  87. "Britain's fastest passenger train gets a makeover" (Press release). SouthEastern. 14 August 2023.
  88. Tuplin, Richard, ed. (28 September 2009). "First Class 395 'Javelin' named at Ashford International" (PDF). Railway Herald. No. 195. Northallerton. p. 6. ISSN 1751-8091. Retrieved 26 November 2022.
  89. "High speed Javelin train named after Paralympic great Dame Sarah Store". Newcastle upon Tyne: London & South Eastern Railway. 7 February 2013. Archived from the original on 11 February 2013. Retrieved 20 March 2013.
  90. "Southeastern catches the #trainbow for LGBT+ Pride season". Newcastle upon Tyne: London & South Eastern Railway. 9 July 2018. Archived from the original on 23 January 2021. Retrieved 28 January 2023.
  91. Hornby [@hornby] (8 June 2019). "A Southeastern Class 395 has been officially named after Hornby at the Ramsgate Engineering Depot Open Day!" (Tweet) via Twitter.
  92. "High Speed train named in honour of European Champion Asher-Smith". Newcastle upon Tyne: London & South Eastern Railway. 22 November 2018. Archived from the original on 29 January 2023. Retrieved 29 January 2023.
  93. "Southeastern celebrates 10 Years of Highspeed service". Newcastle upon Tyne: London & South Eastern Railway. 23 September 2019. Archived from the original on 28 September 2020. Retrieved 28 January 2023.
  94. Hewitt, Sam (27 December 2017). "Armistice Day Javelin tour raises £20,000". The Railway Magazine. Horncastle: Mortons Media Group. Retrieved 28 January 2023.
  95. Jeffery, Poppy (23 October 2017). "Train hits van at level crossing in Lower Road, Teynham". KentOnline. Aylesford: KM Group. Archived from the original on 14 November 2017. Retrieved 21 September 2018.
  96. "Hornby BR Class 395". Hornby Railways Collector Guide. Retrieved 19 February 2020.

Sources

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.