Batang–Semarang Toll Road
Batang-Semarang Toll Road is a 75 kilometers long highway that connects Batang area with Semarang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java.[1] The toll road is operational since 2018.[2]
Batang-Semarang Toll Road | |
---|---|
Route information | |
Part of AH2 | |
Maintained by PT Jasamarga Semarang Batang (PT Jasa Marga Tbk and PT Waskita Toll Road (Waskita Karya)) | |
Length | 75 km (47 mi) |
Existed | 2018–present |
Major junctions | |
West end | Batang |
East end | Semarang |
Location | |
Country | Indonesia |
Major cities | |
Highway system | |
Sections
Until November 2017, its construction progress is at 55.7 percent.[3][4] The construction of this toll road is divided into 5 sections:
- Section I, beginning of project - East Batang (3.2 km)
- Section II, East Batang - Weleri (36.35 km)
- Section III, Weleri - Kendal (11.05 km)
- Section IV, Kendal - Kaliwungu (13.5 km)
- Section V, Kaliwungu - Krapyak (10.9 km)
Exits and Gates
Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
Central Java | Kandeman, Batang Regency | 0 | 0.0 | 348 | Kandeman Toll Gate |
| Western terminus |
Gringsing, Batang Regency | 23.96 | 14.89 | 371 | Gringsing Toll Gate |
| ||
Weleri, Kendal Regency | 36.10 | 22.43 | 384 | Weleri Toll Gate |
| ||
Pegandon, Kendal Regency | 47.04 | 29.23 | 395 | Kendal Toll Gate |
| ||
Kaliwungu, Kendal Regency | 60.40 | 37.53 | 409 | Kaliwungu Toll Gate |
| ||
Ngaliyan, Semarang | 64.88 | 40.31 | Kalikangkung Toll Gate (Main toll gate) | ||||
71.30 | 44.30 | 419 | Krapyak Interchange |
| Eastern terminus, Eastern end of Toll Road Route 1, Western end of Toll Road Route 6 | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- Inilah Pemenang Lelang Jalan Tol Batang-Semarang
- "Tol Batang-Semarang Bisa Dilewati Arus Mudik Lebaran 2018". Retrieved 23 December 2017.
- "Jalan Tol Batang - Semarang Selesai Akhir 2018". Archived from the original on 17 April 2018. Retrieved 23 December 2017.
- "Batang and Balikpapan toll road projects accelerated". Archived from the original on 23 December 2017. Retrieved 23 December 2017.