Chaudhary Charan Singh International Airport
Chaudhary Charan Singh International Airport (IATA: LKO, ICAO: VILK) is an international airport serving Lucknow, the capital of the Indian state of Uttar Pradesh.[5] It is located in Amausi, 14 km (8.7 mi) from the city centre, and was earlier known as ''Amausi Airport''. It was later renamed in 2008 after Chaudhary Charan Singh, the fifth Prime Minister of India.[6] It is owned and operated by the Lucknow International Airport Limited (LIAL), a public–private consortium led by Adani Group.
Chaudhary Charan Singh International Airport | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||
Airport type | Public | ||||||||||
Owner | Airport Authority of India | ||||||||||
Operator | Lucknow International Airport Limited[1] | ||||||||||
Serves | Lucknow Metropolitan Region | ||||||||||
Location | Amausi, Lucknow, Uttar Pradesh, India | ||||||||||
Opened | 1986 | ||||||||||
Focus city for | IndiGo | ||||||||||
Elevation AMSL | 123 m / 404 ft | ||||||||||
Coordinates | 26°45′43″N 080°53′00″E | ||||||||||
Website | CCSIA Lucknow | ||||||||||
Map | |||||||||||
LKO/VILK Location in Amausi, Lucknow, Uttar Pradesh LKO/VILK LKO/VILK (India) LKO/VILK LKO/VILK (South Asia) LKO/VILK LKO/VILK (Middle East) LKO/VILK LKO/VILK (Asia) | |||||||||||
Runways | |||||||||||
| |||||||||||
Statistics (April 2022 – March 2023) | |||||||||||
| |||||||||||
The airport is the 11th busiest airport in terms of passenger traffic in India. It handled more than 5 million passengers, with more than 42,000 aircraft movements in the fiscal year 2022–2023,[2] and handled around 5.5 million passengers, with 38,494 aircraft movements in the fiscal year 2019–2020. Due to the COVID-19 pandemic, passenger traffic declined by 55.1% in the FY 2020-2021 and aircraft movements by 40.4% in the same year.
The airport has two operational terminals (1 and 2), and one under construction passenger terminal (3) that will be completed by the end of 2023.
History
The airport was constructed in 1986 to facilitate service to corporate and government officials. With an increasing number of passengers, AAI decided to upgrade and expand the airport in 1996, owing to an increased number of passengers and the introduction of private operators in the sector.[7]
On 17 July 2008, the Government of India officially renamed Amausi Airport to Chaudhary Charan Singh International Airport.[8]
The second terminal (Terminal 2), equipped with latest technology, was then built in 2012 to handle the increasing domestic traffic.[7] Terminal 2 was inaugurated and granted international status on 19 May 2012.[9]
The construction of a third terminal (Terminal 3) for international operations was announced in 2016 in order to cater for the increasing passenger traffic. In 2018, the Government of India approved the new terminal 3 which is being built at INR 13.83 billion.[10]
In February 2019, the Adani Enterprises led - Lucknow International Airport Limited (LIAL) won the rights of operations, management and development of the airport under the public-private partnership (PPP) model.[11] As per the agreement, the airports would be handed to the company for a period of 50 years at the highest bid of ₹171 per passenger. The company will pay the per-passenger fee (PPF) to AAI for every domestic and international passenger handled at the airport.[12]
Runway
Chaudhary Charan Singh International Airport has ILS CAT IIIB capability on runway 27, which enables landing in low visibility conditions.
Delhi, Lucknow, Bangalore, Kolkata, Jaipur, and Amritsar are the only 6 airports in India with ILS CAT IIIB which helps flights land safely even with visibility as low as 50 metres.[13]
Terminals
The airport has two operational terminals and one under construction:
Terminal 1
- The original terminal, built to complement Charbagh Railway Station's architecture.
- It has two arrival and three departing gates as well as two immigration counters.
- The terminal was expanded in 1996.
- It is now used for international flights after the opening of Terminal 2 in 2012.[14]
- Terminal 1 will be demolished in the second phase of the CCSI airport expansion project to link Terminal 2 and Terminal 3.[15]
- Demolition of terminal 1 is expected to start by October 2023 and will be completed by December 2023.
Terminal 2
- Terminal 2 was originally built to become the international terminal. However, owing to the growing domestic traffic it was made the domestic terminal, leaving Terminal 1 to be the international terminal.
- The terminal building’s elevation to the sky resembles the folded wings of the paper plane. Large wing-like cantilevers on either side of the 200m long terminal building suggest lightness and swiftness. The building itself appears as a dynamic object preparing to take flight. Inside, the gently curving ceiling gives the feeling of being under the belly of a giant aircraft. The design of the building does not labour to represent the culture and heritage of the city, instead gets imprinted with the architects’ own experiences: nightmares about an aircraft crashing down through the roof, the exhilaration of flight, lightness, the indented front of the city as it wraps around the Gomti river, the ruins of the British Residency after the 1857 mutiny-ancient and unhomely, etc. Frosted etchings on the glass façade of the building bear the intricate patterns of chikankari work, Lucknow’s famous embroidery work.[16]
- The terminal was inaugurated by then civil aviation minister Ajit Singh on 19 May 2012 before opening on 2 June 2012.[17] With five boarding gates, Terminal 2 is used for domestic flights.
- Terminal 2 of Lucknow Airport deals with huge passenger traffic every year.[18]
- Air traffic growth has put some pressure on aerodromes as of 2017.
- Minister of State for Civil Aviation said, "project management consultant has been awarded for expansion of existing terminal building for an estimated cost of Rs 8.80 billion".[19]
- Having area of 17,000 square metre, the terminal can handle 1200 passengers per hour and around 4 million passengers per year. The terminal was being used more than its capacity which led LIAL increasing the passenger handling capacity per hour by 200 passengers.[20]
- The terminal was refurbished by the Adani Group in 2022 after takeover in 2020 as per it's plan to refurbish terminals of airports taken over form the AAI. There are also plans to increase the commercial area at the terminal by up to 17 times taking it from 1,000 m2 (11,000 sq ft) to 17,000 m2 (180,000 sq ft).[21]
- After commissioning of terminal 3, terminal 2 will be converted into an administrative building [22]
Terminal 3
In 2018, Suresh Prabhu, the then Minister of Civil Aviation, announced that a new third passenger terminal building will be constructed with an area of 1,11,367 sq.m., including a basement area of 20,461 sq.m. and a connecting corridor between Terminal 2 and Terminal 3, which will cover 6,646 sq.m. area. It will be able to serve more than 13 million passengers annually.
Its features are as follows:
- It is being built at a cost of ₹ 1,383 crore (US$173 million).[10]
- Peak Hour Handling (PHP) capacity of the new terminal will be 4,000 passengers (3,200 domestic & 800 international).[23]
- There will be total 75 check-in counters (60 for domestic and 15 for international passengers) and 18 check-in kiosks for the passengers travelling through the terminal.[24]
- It will be installed with 14 aerobridges through which the passengers can board directly to the flight from their respective boarding gates.[24] 8 will be installed in the first phase while 6 in the second phase.
- It will be equipped with 30 lifts and 5 escalators.[24]
- In 2018, the construction of the terminal building was started by Nagarjuna Construction Company (NCC).
- All design and interiors have been designed by the Pascal+Watson.
- The first phase which includes the construction of Terminal 3 will be completed by the end of the year 2022. The second phase which includes the extension of part of Terminal 3 after demolition of Terminal 1 and constructing a connecting corridor between Terminal 2 and Terminal 3 will be completed by March 2023.[15]
- On 25 February 2019, Adani Group was awarded with the operations and expansion of the existing as well as the new Terminal 3.[25][26]
- It will be a multi-story terminal building with departures at the first floor and arrivals at the ground floor.
- The terminal architecture will endeavour to express the position of Lucknow as a key city and will display the culture and heritage of Uttar Pradesh.
- Strong references to traditional culture will be expressed by the building's architecture.
- Arriving and departing passengers will sense this identity and reference to place.
- The building will be provided with interior decorations to match the modern structure.[27]
- Along with the terminal, a multi-story parking facility is also under construction, which will have a parking of 1,500 vehicles. Terminal 3 is expected to be completed by mid-2023.
- Over 5-km-long storm water drains are being constructed parallel to the runway on either side and the outflow of the water will go into the Bijnor nala.[22]
Cargo Terminal
- Opened in March 2022.
- The facility has increased the cargo handling. capacity of the CCSI airport by 40 per cent to 7000 tonne per year. The airport plans to increase the capacity to over 1000 tones per month by the end of 2022–2023.
- At present, e-commerce, courier, auto parts, Post Office mails, general cargo, valuables, mobile phones, and perishables are exported as well as imported at Lucknow Airport.
- The airport is also in talk with various multi-national companies to use Lucknow as a regional distribution hub.[28]
- New integrated cargo terminal with a capacity of 30,000 tonnes is planned at Lucknow Airport by the administration.
Airlines and destinations
Airlines | Destinations |
---|---|
Air India | Delhi, Mumbai |
Air India Express | Bangalore, Delhi,[29] Dubai–International, Hyderabad (begins 17 November 2023),[30] Mumbai, Pune[31] |
Akasa Air | Bangalore, Mumbai[32] |
Alliance Air | Dehradun,[33] Delhi, Gorakhpur |
flydubai | Dubai–International |
Flynas | Dammam, Riyadh |
IndiGo | Abu Dhabi,[34] Agra, Ahmedabad, Amritsar, Bangalore, Chandigarh, Chennai, Dammam,[35] Dehradun, Delhi, Dubai–International,[36] Goa–Dabolim, Guwahati, Hyderabad, Indore, Jaipur, Kolkata, Mumbai, Nagpur, Patna, Prayagraj, Pune, Raipur,[37] Ranchi,[38] Sharjah, Varanasi[39] |
Oman Air | Muscat |
Saudia | Jeddah, Riyadh |
Thai AirAsia | Bangkok–Don Mueang[40] |
Vistara | Delhi |
Statistics
Future
Airport expansion
- The runway expansion from 2744 m to 3200 m started on 23 February and will last until July.
- The Adani Group will invest Rs 10,700 crore into Lucknow Airport's expansion so that its annual passenger handling capacity zooms from 4 million passengers per annum (MPPA) to 39 MPPA.
- The airport's expansion plan received clearance from the Union Environment Ministry on 15 December. However, the plan submitted to the ministry did not mention the deadline for the expansion.
- The plan of Lucknow International Airport Limited (LIAL), an Adani group company, said: “CCSIA (Chaudhary Charan Singh International Airport) in Lucknow has a total land area of 509.41 hectares (1258.80 acres), making it one of the most land-constrained airports in India.” LIAL now proposes expansion of CCSIA within an area of 457.1 hectares, it added.
- Along with Terminal 3, a new terminal building (Terminal 4), 3 parallel taxiways along the runway with associated infrastructure, support facilities, and utilities will be built to accommodate 39 MPPA, the plan noted.
- Total built up area for Terminal 4 along with Terminal 3 modification would be 4,26,131 square meter whereas the total footprint area of Terminal 4 and Terminal 3 modification would be 1,39,020 square meters [41]
- LIAL's plan said a cargo complex would be developed at CCSIA in a total area of 23.14 hectares to handle cargo up to 0.25 million tonnes per annum.
- During its construction phase, the expansion project will employ about 2,000 people directly and indirectly, and once operational, about 25,000 people will be employed, the plan said.
- A multi-modal transport hub — which includes metro connectivity, multi-level car parking, cityside check-in and self-bag drop facility, and curbside facilities for passengers/visitors arriving at the airport from surrounding areas — will also be developed, it said.
- LIAL has proposed multi-level car parking to accommodate 4,000 car spaces, the plan noted.
- “Pedestrian walkways are planned to connect multi-level car parking to terminal departure and arrival areas, for passengers and greeters to park in multi-level car parking and walk down to the pick-up/drop off kerbs,” it mentioned.
- About 9.6 million litres per day (MLD) of water would be required to handle 39 MPPA, it said. 4.5 MLD will be supplied by the Uttar Pradesh government or borewells and the remaining 5.1 will be sourced from the sewage treatment plant for landscaping and flushing, it added.[42]
- New integrated cargo terminal with a capacity of 30,000 tonnes, new fuel storage facility with 5,000 KL capacity are among other key initiatives that have been planned at the Lucknow International Airport by the administration.[22]
Aero City
A concession Agreement for Operation, Maintenance, Management & Development of Airside and Landside area of Chaudhary Charan Singh International Airport (CCSIA) has been signed between Airports Authority of India (AAI) and Lucknow International Airport Limited (LIAL) (earlier known as Adani Lucknow International Airport Limited) on 14 February 2020. As a part of concession agreement between AAI & LIAL, 110 acres has been allotted to LIAL for City Side development. Adani Airport Holdings Limited has been granted rights to undertake development, operation, management and maintenance of City Side of Chaudhary Charan Singh International Airport (CCSIA) Airport vide a Master Services Agreement dated 18 May 2021 ("MSA") executed between Lucknow International Airport Limited (LIAL) and Adani Airport Holdings Limited and is authorised to obtain required approvals from statutory authorities.
Out of the total land area available for City Side Development. M/s Adani Airport Holdings Limited proposes its phase-I development, on plot area of about 15.36 acres, i.e. 62,182.69 sqm and Built-up area of 3,47,423 sq. m, for which Environment Clearance is being sought. Under the provision of EIA notification 2006, amended until date.
The project is a mixed-use development that comprises the following:
- Retail space (Multiplex, Entertainment, Virtual Reality, and F&B)
- Business Centre (Convention Center and Flexi Office)
- Hotel
- Associated connectivity, utilities and facilities
The total population of project will be 31,108 persons.
Adequate provision will be made for the heavy vehicle parking at the project site to allow smooth movement at the site. The proposed parking area will be 4087 ECS.
The total project cost of the proposed City Side Development project is 1116.50 crores.
The Aero City will be constructed between the new Terminal 3 and the CCSIA Metro Station. Estimated date of completion for the project is 2026.[43][44]
Ground transport
Railways
Amausi railway station is one of the suburban railway stations of Lucknow. It lies on the Lucknow - Kanpur Suburban Railway Line and is just 7 km (4.3 mi) from the airport.
Metro
CCSIA and Amausi are the metro stations on the Red Line of the Lucknow Metro that connects the airport to the rest of the city.
- CCSIA metro station is situated at the front of the Terminal 2.
- Amausi metro station is situated at just 1 km from the Terminal 2.
Local buses
The Lucknow City Transport Services supplies the Air-Conditioned and Non-AC buses from the Airport to the Charbagh Railway Station as well as the rest of the city.
Awards
- The airport was awarded AAI's "Best Airport" award in July 2013 along with Jodhpur Airport.[45]
- Lucknow Airport was rated second-best in the category of small airports catering to 5–10 million passengers per annum by Airports Council International, a global non-profit organisation of airport operators.[46]
- In 2018, Lucknow Airport was awarded the best airport in the category "Best Airport by Size and Region (2–5 million passengers per year in Asia-Pacific Region)" by the Airports Council International.[47]
- The Passenger Terminal 2 Building's Architects, S. Ghosh & Associates were awarded the NDTV-Grohe Infrastructure Architecture Design of the Year Award in 2014 for the project.[48]
- In 2019, the Airport was awarded first position in ASQ awards in Asia Pacific region for 5 to 15 million capacity pet annum by Airport Council International (ACI).[49]
- In January 2021, Lucknow Airport was accredited in the Airports Council International (ACI) Airport Health Accreditation programme. The global recognition demonstrates extraordinary proactive measures put in place by the airport to ensure passenger safety.[50]
- In January 2023, Assocham announced the best regional airport awards for Lucknow and Ahmedabad airports.[51]
See also
References
- "Lucknow International Airport". cbonds.com. Retrieved 7 March 2023.
- "Annexure III – Passenger Data" (PDF). aai.aero. Retrieved 22 April 2023.
- "Annexure II – Aircraft Movement Data" (PDF). aai.aero. Retrieved 22 April 2023.
- "Annexure IV – Freight Movement Data" (PDF). aai.aero. Retrieved 22 April 2023.
- "Lucknow Airport". AAI. Archived from the original on 11 August 2020. Retrieved 21 August 2020.
- "Chaudhary Charan Singh, The 5th Prime Minister of India". My Nation. Asianet News Network Pvt Ltd. Archived from the original on 4 August 2020. Retrieved 27 August 2020.
- "Lucknow Airport- Chaudhary Charan Singh International Airport, Lucknow – Lucknow Travel Guide". Archived from the original on 3 February 2016. Retrieved 6 March 2016.
- Sinha, Saurabh (17 July 2008). "Airport to be named after Charan Singh?". The Times of India. ISSN 0971-8257. Retrieved 25 October 2023.
- "The Times Of India". 4 August 2012. Archived from the original on 13 October 2015. Retrieved 21 August 2014.
- "Govt nod for 3 new airport terminal buildings at Chennai, Lucknow and Guwahati – Times of India". The Times of India. Timesofindia.indiatimes.com. 2 May 2018. Archived from the original on 3 May 2018. Retrieved 3 May 2018.
- PTI (22 October 2020). "Adani To Take Over Airport Ops At Mangaluru, Lucknow, Ahmedabad Soon". NDTV. Archived from the original on 1 November 2020. Retrieved 2 November 2020.
- "Airport makeover: No takeoff in sight for Adani operations". The Financial Express. 23 August 2020. Archived from the original on 7 September 2020. Retrieved 7 September 2020.
- "Airport ready to facilitate landing in 50 m visibility | Lucknow News – Times of India". Timesofindia.indiatimes.com. 9 December 2016. Archived from the original on 7 September 2018. Retrieved 3 May 2018.
- "Swanky Amausi ready for take-off after a month". The Times of India. 17 December 2011. Archived from the original on 4 November 2013.
- "Pandemic delays work on swanky Terminal 3 at CCS Airport by a year". 3 September 2020. Archived from the original on 4 September 2020. Retrieved 3 September 2020.
- Rosenfield, Karissa (29 May 2012). "New Terminal at Lucknow Airport / S. Ghosh & Associates". ArchDaily. Retrieved 1 August 2023.
- "New Terminal at Lucknow Airport". Airport International. 31 May 2012. Archived from the original on 1 June 2012.
- "Airports Authority of India". Archived from the original on 15 September 2014.
- "Kerala firm gets government nod for sea plane operations: Union minister Jayant Sinha". The Financial Express. 20 July 2017. Archived from the original on 7 November 2017. Retrieved 3 May 2018.
- "छोटा पड़ रहा लखनऊ एयरपोर्ट का घरेलू टर्मिनल, 200 यात्रियों की क्षमता बढ़ाने का फैसला".
- "Adani aviation plan: A top airline may be shifted to Navi Mumbai airport". 17 October 2022.
- "Lucknow airport to undergo Rs 5,000 crore upgrade, get new terminal". The Times of India. 2 March 2023.
- "Domestic Projects | AIRPORTS AUTHORITY OF INDIA". Aai.aero. 17 August 2017. Archived from the original on 14 June 2021. Retrieved 21 December 2021.
- "लखनऊ एयरपोर्ट का नया टर्मिनल तीन साल में, ये सुविधाएं होंगी खास". Dainik Jagran (in Hindi). Retrieved 3 November 2022.
- Manoj, Ashwini Phadnis & P. (25 February 2019). "Adani lands 5 airports with winning bids". @businessline. Archived from the original on 14 November 2019. Retrieved 26 January 2020.
- "Adani group wins bids to operate five airports". 25 February 2019. Archived from the original on 8 November 2020. Retrieved 26 January 2020.
- Pascall+Watson / redboxmedia. "Chaudhary Charan Singh International Airport, New Terminal • Aviation • Work • Pascall+Watson". Pascalls.co.uk. Archived from the original on 31 August 2021. Retrieved 21 December 2021.
- "Lucknow Airport Gets New Facility for Inbound Cargo | Lucknow News - Times of India". The Times of India. 12 March 2022.
- "Air India Express flying from Lucknow to Delhi". Air India Express. 13 September 2023.
- "Air India Express to expand flights from Hyderabad". AviationAll. Retrieved 18 October 2023.
- "AirAsia India to commence Lucknow-Pune service in May-2023". CAPA. Retrieved 19 April 2023.
- "Akasa Air Flight Network". Akasa Air. Retrieved 30 June 2023.
- "Alliance Air to start Lucknow-Dehradun flight". Retrieved 13 August 2022.
- "IndiGo adds flights to Abu Dhabi, Dubai from Lucknow". Economic Times. 30 June 2023. Retrieved 30 June 2023.
- "IndiGo NS23 International Service Adjustment – 16APR23". www.aeroroutes.com.
- "IndiGo to resume Lucknow-Dubai service from Jul-2023". CAPA. Retrieved 14 April 2023.
- "IndiGo to resume Lucknow-Raipur-Bhubaneswar service from Jun-2023". CAPA. Retrieved 22 May 2023.
- "Ranchi to get direct flights to Lucknow, Bhubaneshwar". Archived from the original on 3 August 2021. Retrieved 3 August 2021.
- "CM Adityanath inaugurates first flight service between Lucknow, Varanasi". Press Trust of India. 10 August 2023. Retrieved 10 August 2023.
- "Thai Air Asia to Lucknow". Retrieved 23 October 2022.
- "Downloads | Lucknow International Airport".
- "Adani group to invest Rs 10,700 crore to expand Lucknow airport". 18 December 2022.
- "Adani Group plans to build aero cities near its airports". 15 July 2022.
- "Report Part 1(FORM - B)". environmentclearance.nic.in. Retrieved 18 February 2023.
- "Airports Authority of India" (PDF). 23 January 2014. Archived from the original (PDF) on 23 January 2014. Retrieved 26 January 2020.
- "Lucknow airport judged second-best in small airport category – Times of India". The Times of India. 3 March 2016. Archived from the original on 6 January 2017. Retrieved 6 March 2016.
- "Asia-Pacific". Aci.aero. Retrieved 3 May 2018.
- "Infrastructure Architecture Design of the Year (Sports, Transport, Bridges)". NDTV Design And Architecture Awards 2017. 17 July 2015. Archived from the original on 11 July 2019. Retrieved 27 August 2020.
- "Proud achievement! Delhi, Mumbai, Bengaluru, 6 other Indian airports bag awards for World's best airports". The Financial Express. 11 March 2020. Archived from the original on 25 August 2020. Retrieved 27 August 2020.
- "Three Adani Airports including Mangaluru awarded ACI Airport Health Accreditation for safe travel". Daijiworld.com. 18 January 2021. Archived from the original on 30 January 2021. Retrieved 21 December 2021.
- "We are looking to acquire new airports through govt bids: Adani Airports CEO". Business Insider.