Cinere–Jagorawi Toll Road
Cinere–Jagorawi Toll Road or Cijago Toll Road is a 14.64-kilometre (14.64 km) toll road which extends from Cimanggis to Cinere in West Java, Indonesia.[1][2] This toll road is part of the Jakarta Outer Ring Road 2. The toll road is connected to Jagorawi Toll Road, Depok-Antasari Toll Road and Cinere-Serpong Toll Road. Section 1 from Cisalak to Jagorawi was inaugurated on January 27, 2012, which is 3.7 kilometres (2.3 mi) in length. The toll road is expected to be completed by the end of 2018. Metro and long distance and long or medium distances from Depok can use this toll road, without passing Lenteng Agung and Pasar Minggu.[3]
Cinere-Jagorawi Toll Road Cijago | |
---|---|
Route information | |
Maintained by PT Trans lingkar Kita Jaya (TLKJ) | |
Length | 14.64 km (9.10 mi) |
Major junctions | |
West end | Limo Interchange |
East end | Cimanggis Interchange |
Location | |
Country | Indonesia |
Highway system | |
Sections
The toll road is divided into three sections. Section 1 and I is operational while section III is under construction.
- Section 1: extends from Jagorawi to Raya Bogor (operational)
- Section 2: from Raya Bogor to Kukusan (operational),[4]
- Section 3 from Kukusan to Cinere (partially operational).
Toll gate
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
West Java | Limo, Depok | Serpong–Cinere Toll Road (Under construction) | |||||
Limo Interchange |
| ||||||
Beji, Depok | 15.2 | 9.4 | 15 | Kukusan Toll Gate |
|
| |
17.2 | 10.7 | 17 | Margonda Toll Gate |
| |||
Sukmajaya, Depok | 19.9 | 12.4 | 20 | Cisalak Toll Gate |
| ||
Cimanggis, Depok | 23.6 | 14.7 | 23 | Cimanggis Interchange | |||
Tapos, Depok | 24.7 | 15.3 | Cimanggis–Cibitung Toll Road | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- "Terus Dikebut, Begini Update Pembangunan Tol Cijago". Detik. Retrieved 18 September 2018.
- "Dibangun Sejak 2013, Seksi 2 Tol Cijago Beroperasi Bulan Depan". Detik. Retrieved 18 September 2018.
- "Sudah 81 Persen, Seksi II Tol Cijago Rampung sebelum Lebaran". Kompas. Retrieved 18 September 2018.
- "Tol Cijago Seksi II Akan Dibuka Fungsional Hari Ini". Bisnis. Retrieved 3 May 2019.