Cobblebank railway station

Cobblebank railway station is located on the Serviceton line in Victoria, Australia. It serves the western Melbourne suburb of Cobblebank, and opened on 1 December 2019.[2]

Cobblebank
PTV regional rail station
Westbound view from Platform 2 in December 2019
General information
LocationFerris Road,
Cobblebank, Victoria 3338
City of Melton
Australia
Coordinates37°42′42″S 144°36′07″E
Owned byVicTrack
Operated byV/Line
Line(s)Ballarat Ararat Maryborough
(Serviceton)
Distance34.39 kilometres from
Southern Cross
Platforms2 side
Tracks2
Train operatorsV/Line
ConnectionsList of bus routes in Melbourne Bus
Construction
Structure typeAt grade
ParkingYes
Bicycle facilitiesYes
AccessibleYes
Other information
StatusOperational, unstaffed
Station codeTLN
Fare zoneMyki Zone 2
WebsitePublic Transport Victoria
History
Opened1 December 2019 (2019-12-01)
Previous namesToolern (provisionally)
Passengers
2019–202025,450[1]
2020–202146,950[1]Increase 84.47%
Services
Preceding station Railways in Victoria V/Line Following station
Rockbank Ballarat line Melton
towards Wendouree
Ballarat line Melton
Melton
Terminus
Ararat line Melton
towards Ararat
Maryborough line
One daily service
Melton
One-way operation

History

Rail Motor Stopping Place No. 65 opened on 1 October 1934, and was at the approximate location of the present Cobblebank station.[2] By 4 November 1968, it had been removed from the Victorian Railways working timetables and, on 8 July 1969, it was closed to traffic.[2]

In November 2017, the Victorian State Government announced the station would be built, with a scheduled completion date of late 2019.[3][4][5] The station, built as part of the Regional Rail Revival project, was provided to serve future residential developments nearby.[6][7]

On 26 October 2018, the designs for the station were released[8] and, at the same time, it was renamed from Toolern to Cobblebank.[9] Despite that, it still uses the station code for Toolern (TLN).[2]

On 1 December 2019, the station opened,[10] with around 1000 community members attending the opening celebration.[11][12][13] The station opening coincided with the duplication of 18 km of track between Deer Park West and Melton.[14][2]

First announced by the Andrews State Government in 2018, the station will eventually be integrated into the metropolitan railway network, as part of the Western Rail Plan.[15]

Platforms, facilities and services

Cobblebank has two side platforms. The station has a ticketing office, an office and holding cell for Protective Services Officers, a waiting room, male, female and accessible toilets, a Parkiteer bicycle parking cage, an accessible pedestrian overpass with lifts, ramps and stairs, and bus and car parking.[16] The station has provision for two express railway tracks,[17] which will most likely be laid after electrification works to Melton are complete.[18]

It is served by V/Line Ballarat and Ararat line trains.[19]

Platform 1:

Platform 2:

Transit Systems Victoria operates one route to and from Cobblebank station, under contract to Public Transport Victoria:

  •  454 : to Melton station[20]

References

  1. Railway station and tram stop patronage in Victoria for 2008-2021 Archived 17 December 2022 at the Wayback Machine Philip Mallis
  2. "Cobblebank". vicsig.net. Archived from the original on 16 May 2023. Retrieved 25 February 2023.
  3. New train station announced in Toolern precinct City of Melton 3 November 2017
  4. New Train Station for Melbourne's Growing West Archived 21 December 2017 at the Wayback Machine Minister for Public Transport 3 November 2017
  5. Another station coming to Melbourne's west Archived 12 January 2018 at the Wayback Machine Rail Express 6 November 2017
  6. Minister for Public Transport (1 March 2017). "$518 Million Ballarat Line Upgrade Released To Market". Premier of Victoria website. Archived from the original on 19 April 2017. Retrieved 2 February 2019.
  7. "Ballarat Line Upgrade". Rail Projects Victoria. 1 February 2019. Archived from the original on 30 January 2019. Retrieved 2 February 2019.
  8. "Images Revealed For A New Station At Cobblebank". Premier of Victoria. 26 October 2018. Archived from the original on 28 October 2018. Retrieved 28 October 2018.
  9. Ford, Alex (26 October 2018). "Another Ballarat line station on its way". The Courier. Archived from the original on 27 October 2018. Retrieved 28 October 2018.
  10. "Victoria's Newest Station Opens At Cobblebank". Archived from the original on 8 April 2020. Retrieved 20 May 2020.
  11. "Celebrating Cobblebank Station opening". Archived from the original on 11 April 2020. Retrieved 20 May 2020.
  12. "Cobblebank Station To Open In Early December". Premier of Victoria. 22 October 2019. Archived from the original on 22 October 2019. Retrieved 28 October 2019.
  13. "Victoria's Newest Station Opens At Cobblebank". Mirage News. 1 December 2019. Retrieved 1 December 2019.
  14. "Cobblebank Station opening community event". Victoria's Big Build. Archived from the original on 8 November 2021. Retrieved 7 November 2021.
  15. "A Real Plan For Fast Regional Rail And Metro Rail For The West". Archived from the original on 9 April 2019. Retrieved 30 April 2020.
  16. "Cobblebank Station". Rail Projects Victoria. 29 January 2019. Archived from the original on 2 February 2019. Retrieved 2 February 2019.
  17. "New station at Cobblebank". regionalrailrevival.vic.gov.au. Archived from the original on 27 October 2018. Retrieved 28 October 2018.
  18. Carey, Adam (24 February 2016). "Long-planned Melton rail line upgrade being pushed for next state budget". The Age. Archived from the original on 2 March 2021. Retrieved 28 October 2018.
  19. Ballarat - Melbourne timetable Public Transport Victoria
  20. 454 Melton Station to Cobblebank Station Archived 24 March 2022 at the Wayback Machine Public Transport Victoria
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.