Dahisar East metro station

Dahisar East is the elevated northern terminal station on the North-South corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This metro station is located on the Western Express Highway in Northern Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was opened to the public on 2 April 2022.

Dahisar East
Mumbai Metro station
General information
LocationGhartan Pada, Dahisar East, Mumbai, Maharashtra 400068
Coordinates19.2533066°N 72.8774561°E / 19.2533066; 72.8774561
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMumbai Metro
Line(s)Yellow Line 2
PlatformsSide platform
Platform-1 → Train Terminates Here
Platform-2 → Andheri West
Tracks2
ConnectionsMetro interchange Ovaripada Red Line 7
Construction
Structure typeElevated, Double track
ParkingNo
History
Opened2 April 2022 (2022-04-02)
Electrified25 kV 50 Hz AC through overhead catenary
Services
Preceding station Mumbai Metro Following station
Terminus Yellow Line 2A Anand Nagar
towards Andheri West
Future services
Terminus Red Line 9
(under construction)
Pandhurang Wadi
Location

History

J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[1] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[2]

Dahisar East was opened to the public on 2 April 2022, along with the first phase of Line 2A.[3]

Station Layout

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Andheri West next station is Anand Nagar
Platform 1
Northbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2

Power and Signaling System

Like all other stations and railways of Mumbai metro, Dahisar East station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References

  1. "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  2. "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  3. "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.