Expressways are the highest class of roads in India. As of July 2023, India has a total length of 5,145 km (3,197 mi) of expressways. These are controlled-access highways where entrance and exits are controlled by the use of cloverleaf or trumpet or grade separated interchanges that are incorporated into the design of the expressway and designed for maximum speed of 120 km/h, whereas National highways are flyover access or tolled, where entrance and exit is through the side of the flyover, at each intersection of highway with road, flyovers are provided to bypass the city/town/village traffic and these highways are designed for speed of 100 km/h. Some roads are not access-controlled expressways, but are still named as expressways, such as the Biju Expressway, these are actually state highways which are not declared by central government as an Expressway, hence not an Expressway or National Highway. Mumbai–Pune Expressway is the first 6-lane operational expressway in India started in 2002. Expressways follow standards set by Indian Roads Congress and Bureau of Indian Standards.
Currently, the longest expressway in India is the partially-opened Mumbai-Nagpur Expressway (Phase-II) at 600 km (370 mi), which was opened in 2022 and (Phase-II) was inaugurated in May 2023,[1] and the widest expressway is the Delhi – Dasna (UP border) section of the Delhi–Meerut Expressway with 14 lanes, which was opened in 2021.
Development
Greenfield Expressways in India are designed as 12-lane wide Expressways with the initial construction of 8 lanes with maximum speed set as 120 km/h for all type of vehicles. Land for 4-lane future expansion is reserved in the center of the expressways. Greenfield Expressways are designed to avoid inhabited areas and go through new alignments to bring development to new areas and to reduce land acquisition costs and construction timelines. The Delhi–Mumbai Expressway is an example of a new 12-lane approach with initial 8-lane construction.
Brownfield National Highway Project is the widening/re-development of existing National Highways. The upgradation of highway is a Brownfield Expressway Project which has high traffic demand and is a part of both rural and urban setup. The upgradation is carried from 4 Lane to 6 Lane on EPC mode.[2] 43,000 km state highways have been converted to National Highways in last 8 years.[3]
The majority of the investment required for constructing expressways comes from the central government. Uttar Pradesh and Maharashtra are the only states which are investing in building expressways through dedicated expressway corporations.[4]
The National Highways Authority of India operating under the Ministry of Road Transport and Highways will be in-charge of the construction and maintenance of expressways.[5] The National Highways Development Project by the government of India aims to expand the country's current expressway network and plans to add an additional 18,637 km of greenfield expressways by 2025 apart from building 4 lane greenfield national highways of 50,000 km length.[6][7] Currently NHDP Phase-6 and NHDP Phase-7 construction is going on along with Bharatmala project.
Bharatmala is an ecosystem of road development which includes tunnels, bridges, elevated corridors, flyovers, overpass, interchanges, bypasses, ring roads etc. to provide shortest & optimized connectivity to multiple places, it is a centrally-sponsored and funded road and highways project of the Government of India[8] with a target of constructing 83,677 km[9] of new highways over the next five years, was started in 2017 as well as conversion of 4 lane highways into 6 lane Brownfield expressways & some state highways into NH/NE.[10] Phase I of the Bharatmala project involves the construction of 34,800 km of highways (including the remaining projects under NHDP) at an estimated cost of ₹5.35 lakh crore by 2021–22.[11]
Characteristics
As of July 2023, 47 expressways with a combined length of 5,145 km (3,197.0 mi) are operational in India, with 8,772 km more under construction. In 2014, the country had only approximately 1,021 km of expressways. All the expressways are 4 or more lane wide controlled-access highways, where entrance and exit are controlled by the use of slip roads. India has the second largest road network in the world with 6.3 million kms.[12]
Total Length of Expressways Over Time
Year | Total Length in (KM) |
---|---|
2023–2024 (Preliminary) | 5,145 |
2022–2023 | 3,629 |
2021–2022 | 2,501 |
2020–2021 | 2,002 |
2019–2020 | 1,989 |
2018–2019 | 1,762 |
2017–2018 | 1,323 |
2016–2017 | 1,021 |
2015–2016 | 1,021 |
2014–2015 | 1,021 |
2013–2014 | 1,004 |
2012–2013 | 988 |
2011–2012 | 580 |
2010–2011 | 580 |
2009–2010 | 534 |
2008–2009 | 438 |
2007–2008 | 384 |
2006–2007 | 384 |
2005–2006 | 343 |
2004–2005 | 253 |
2003–2004 | 160 |
2002–2003 | 160 |
Expressways summary by state
List of operational expressways by state, as of March 2023:
States | Length (km/mi) | Number of Expressways |
---|---|---|
Uttar Pradesh | 1,396 km (867 mi) | 8 |
Maharashtra | 765.3 km (475.5 mi) | 6 |
Rajasthan | 757 km (470 mi) | 3 |
Haryana | 609 km (378 mi) | 7 |
Madhya Pradesh | 244 km (152 mi) | |
Chhattisgarh | 191 km (119 mi) | 2 |
Karnataka | 171 km (106 mi) | 5 |
Telangana | 169.6 km (105.4 mi) | 2 |
Tamil Nadu | 94.8 km (58.9 mi) | 2 |
Gujarat | 93.1 km (57.8 mi) | 1 |
Jharkhand | 85 km (53 mi) | 1 |
Bihar | 33 km (21 mi) | 2 |
West Bengal | 30.17 km (18.75 mi) | 2 |
Delhi | 26.6 km (16.5 mi) | 4 |
Total | 5,145 km
(3,197) mi |
47 |
Total Operational Expressways By Type
S.No. | Type | Length (km/mi) |
---|---|---|
1 | National Expressways | 814 km (506 mi) |
2 | State Expressways | 3,901 km (2,424 mi) |
3 | By-pass Expressways | 675.8 km (419.9 mi) |
Total | 5,147 km (3,198 mi) |
National Expressways
As of April 2021, eight expressways have been declared as National Expressway (NE) by the Ministry of Road Transport and Highways.
operational under construction planned
Designation | Expressway | Operational (km) | Total Length (km) | Date declared as NE | Date of completion |
---|---|---|---|---|---|
NE 1 | Ahmedabad–Vadodara Expressway | 93 |
93 |
13 Mar 1986[13] | 16 August 2004[14] |
NE 2 | Eastern Peripheral Expressway (KGP) | 135 |
135 |
30 Mar 2006[15] | 27 May 2018[16] |
NE 3 | Delhi–Meerut Expressway | 96 |
96 |
18 Jun 2020[17] | 1 April 2021[18] |
NE 4 | Delhi–Mumbai Expressway | 490 |
1380 |
10 Jan 2020[19] | March 2023 |
NE 5 | Delhi–Amritsar–Katra Expressway | 0 |
398 |
25 Jun 2020[20] | October 2023 |
NE 5A | Nakodar-Amritsar Expressway | 0 |
99 |
17 Sep 2020[21] | October 2023 |
NE 6 | Lucknow–Kanpur Expressway | 0 |
62 |
15 Dec 2020[22] | October 2023 |
NE 7 | Bangalore–Chennai Expressway | 0 |
258 |
1 Jan 2021[23] | March 2024 |
NE 8 | Varanasi–Kolkata Expressway | 0 |
652 |
1 Jan 2023 | December 2026 |
NE 9 | Kharagpur–Morgram section of Kharagpur–Siliguri Economic Corridor | 0 |
230 |
1 Jan 2023 | 25 December 2026 |
NE 10 | Katihar-Kishanganj-Siliguri-Guwahati Expressway | 0 |
676 |
1 Jan 2023 | 25 December 2026 |
Total | 814 | 4,080 |
Expressways list by state
List of list of expressways by state (including State and National expressways).
State expressways
State Expressways are funded by State/Central Government to connect areas within the state. These expressways reduce travel time, allowing for more efficient travel and fuel savings. This also allows for a more equal distribution of goods, especially to rural areas. These expressways are not part of National Expressways but may be operated by state authority or national authority.
Note: AC = Access-Controlled Expressway. GS = Grade Separated Expressway.
For example, Odisha State Government has built two expressways in Odisha.
i.e. Biju Express Way-1(Western Odisha)
and Biju Express Way-2(Berhampur-Jaypore)
Name | States | Start | End | Length (km/mi) | Lanes | Year of Completion | Remarks |
---|---|---|---|---|---|---|---|
Mumbai Nagpur Expressway (AC) (Phase-I and Phase-II) | Maharashtra | Nagpur | Bharvir | 600 km 372.8 mi |
6 | May 2023 | Longest Expressway in India. |
Amritsar–Jamnagar Expressway[24](Phase-I) | Punjab, Haryana, Rajasthan, Gujarat | Hanumangarh district | Jalore district | 500 km
310.7 mi |
4 | July 2023 | 2nd Longest Expressway in India. |
Purvanchal Expressway (AC)[25] | Uttar Pradesh | Lucknow | Ghazipur | 340.8 km 211.8 mi |
6 | November 2021 | 3rd Longest Expressway in India. |
Agra–Lucknow Expressway (AC)[26] | Uttar Pradesh | Agra | Lucknow | 302.2 km 187.8 mi |
6 | February 2017 | 4th longest expressway in India.[27] |
Bundelkhand Expressway (AC) | Uttar Pradesh | Etawah | Chitrakoot | 296 km 183.9 mi |
4 | July 2022 | First expressway in Bundelkhand. |
Trans–Haryana Expressway(Ambala-Narnaul Expressway) (AC) | Haryana | Kurukshetra | Mahendragarh | 227 km 141.1 mi |
6 | August 2022 | Greenfield expressway created as NH 152D |
Yamuna Expressway (AC)[28][29] | Uttar Pradesh | Greater Noida | Agra | 165.5 km 102.8 mi |
6 | August 2012 | Connects Greater Noida and Agra. |
Western Peripheral Expressway (AC) | Haryana | Palwal | Sonipat | 135.6 km 84.3 mi |
6 | November 2018 | Part of ring road for Delhi NCR. |
Raipur–Bilaspur Expressway (AC) | Chhattisgarh | Raipur | Bilaspur | 127 km 78.9 mi |
4-6 | May 2019 | Connects Judicial Capital Bilaspur and State Capital Raipur |
[[ | |||||||
Eastern Peripheral Expressway (AC) | Uttar Pradesh, Haryana | Sonipat | Palwal | 135 km 83.9 mi |
6 | May 2018 | Part of ring road for Delhi NCR. |
Delhi–Meerut Expressway (AC)[30] | Delhi, Uttar Pradesh | New Delhi | Meerut | 96 km 59.7 mi |
6-14 | April 2021 | NE3, India's widest expressway at 14-lanes.[31] |
Mumbai–Pune Expressway (AC)[32] | Maharashtra | Mumbai | Pune | 94.5 km 58.7 mi |
6 | April 2002 | India's first 6-lane wide expressway. |
Ahmedabad–Vadodara Expressway (AC)[33] | Gujarat | Ahmedabad | Vadodara | 93.1 km 57.8 mi |
4 | August 2004 | First Expressway of Gujarat. |
Jaipur–Kishangarh Expressway (AC)[34] | Rajasthan | Jaipur | Kishangarh | 90 km 55.9 mi |
6 | April 2005 | Forms a segment of the NH-8. |
Delhi-Panipat Expressway | Delhi, Haryana | Delhi | Haryana | 70.5 km 43.8 mi |
8 | June 2023 | 2023-06[35] |
Delhi–Gurgaon Expressway (AC)[36] | Delhi, Haryana | New Delhi | Gurgaon | 27.7 km 17.2 mi |
6-10 | January 2008 | Part of the Golden Quadrilateral. |
Noida–Greater Noida Expressway (AC)[37] | Uttar Pradesh | Noida | Greater Noida | 24.5 km 15.2 mi |
6 | 2002 | |
Raipur–Naya Raipur Expressway (AC) | Chhattisgarh | Raipur | Naya Raipur | 12 km 7.5 mi |
4 | 2019 | |
Delhi–Noida Direct Flyway (DND) (AC)[38] | Delhi, Uttar Pradesh | New Delhi | Noida | 9.2 km 5.7 mi |
8 | January 2001 | India's first 8-lane wide expressway. |
Delhi–Faridabad Skyway (AC)[39][40] | Delhi, Haryana | New Delhi | Faridabad | 4.4 km 2.7 mi |
6 | November 2010 | Part of NH44. |
Total | 3,901 km (2,424 mi) |
Bypass Expressways
Bypass Expressways to bypass city traffic such as ring roads, bypass, freeways and elevated roads exist entirely within a city or between two cities. These expressways direct heavy traffic to the outskirts freeing city roads of traffic. This also allows outside traffic to directly pass the city instead of going through it further limiting traffic within a city.
Note: AC = Access-Controlled Expressway. GS = Grade Separated Expressway.
Name | Locale | States | Length (km/mi) | Lanes | Year of Completion | Remarks |
---|---|---|---|---|---|---|
Outer Ring Road, Hyderabad (AC)[41] | Hyderabad | Telangana | 158 km 98.2 mi |
8 | April 2018. | |
Ranchi Ring Road (AC) | Ranchi | Jharkhand | 85 km 52.8 mi |
6 | February 2019 | First expressway of Jharkhand. |
Allahabad Bypass Expressway (AC) | Allahabad (Prayagraj) | Uttar Pradesh | 84.7 km 52.6 mi |
4 | April 2009 | First Expressway of Uttar Pradesh.
Part of NH 19. |
Chennai Outer Ring Road (AC)[42] | Chennai | Tamil Nadu | 62.8 km 39.0 mi |
6 | February 2021 | Longest expressway of Tamil Nadu. |
NICE Peripheral Ring Road | Bangalore | Karnataka | 41 km 25.5 mi |
4 | August 2006 | |
Chennai Bypass (AC)[43] | Chennai | Tamil Nadu | 32 km 19.9 mi |
4-6 | June 2010 | First Expressway of Tamil Nadu. |
JNPT Road (AC) | Panvel, Navi Mumbai | Maharashtra | 28 km 17.4 mi |
6 | April 2022 | 6 lane access controlled road connecting Navi Mumbai to JNPT Port, it runs parallel to Uran-Panvel road |
Sohna Elevated Corridor(AC)[44] | Gurgaon, Sohna | Haryana | 21.7 km 13.5 mi |
6 | July 2022 | Part of Delhi-Mumbai Expressway |
Loknayak Ganga Path Phase I (AC) | Patna | Bihar | 20.5 km 12.7 mi |
4 | June 2022 | |
Narnaul Bypass Expressway (AC) | Narnaul | Haryana | 14 km 8.7 mi |
6 | August 2022 | 14 km Controlled accessed expressway, Part of Ambala-Kotputli Economic Corridor |
Hindon Elevated Road(GS) | Ghaziabad | Uttar Pradesh | 10.3 km 6.4 mi |
6 | 2018 | |
Eastern Freeway (GS) | Mumbai | Maharashtra | 16.8 km 10.4 mi |
4 | June 2014 | |
Belghoria Expressway (GS) | Kolkata | West Bengal | 16 km 9.9 mi |
4 | 2008 | |
Chatrapati Shivaji Maharaj Uddanpul (Nashik Freeway) (AC) (GS) | Nashik | Maharashtra | 16 km 9.9 mi |
4-6 | June 2013 | First NHAI expressway in Maharashtra. The longest flyover in Maharashtra. |
Kona Expressway (GS) | Kolkata, Howrah | West Bengal | 14.17 km 8.8 mi |
6 | 2001 | |
AIIMS-Digha Elevated Road (AC) | Patna | Bihar | 12.5 km 7.8 mi |
6 | November 2020 | First expressway of Bihar.[45] |
P.V. Narasimha Rao Expressway (AC)[46][47] | Hyderabad | Telangana | 11.6 km 7.2 mi |
4 | October 2009 | First Expressway of United Andhra Pradesh. |
Electronic City Elevated Expressway (GS) | Bangalore | Karnataka | 10 km
6.21 mi |
4 | January 2010 | |
Panipat Elevated Expressway (AC)[48] | Panipat | Haryana | 10 km 6.2 mi |
6 | January 2008 | |
Palm Beach Marg (AC) | Navi Mumbai | Maharashtra | 10 km 6.2 mi |
6 | 1995 | Palm Beach road is an access controlled 6 lane ring road of Navi Mumbai |
NICE Link Road (AC) | Bangalore | Karnataka | 7.5 km 4.7 mi |
4 | 2002 | First Expressway of Karnataka. |
NICE Expressway (AC) | Bangalore | Karnataka | 3.5 km 2.2 mi |
4 | Mar 2019 | Part of Bangalore-Mysore Expressway |
Total | 675.77 km (419.90 mi) |
Expressways under-construction
* Ready to inaugurate
Total length listed in this table is 9,521.76 km (5,916.55 mi).
Name | States | Length (km/mi) | Expected Date of Completion |
---|---|---|---|
Paniyala – Barodameo Expressway | Rajasthan | 86.5 km (53.7 mi) | 2024-12 |
Panipat-Dabwali Expressway | Haryana | 300 km (190 mi) | 2026-12[49] |
Ranchi-Jamshedpur Expressway[50][51][52] | Jharkhand | 220 km (140 mi) | 2023-12 |
Ahmedabad–Dholera Expressway | Gujarat | 110 km (68 mi) | 2024-12 |
Airoli–Katai Naka Freeway (Phase 1- 5.2 km section) | Maharashtra | 12.3 km (7.6 mi) | 2024-03 |
Amritsar–Jamnagar Expressway[24] (Phase 2) | Punjab, Haryana, Rajasthan, Gujarat | 757 km (470.4 mi) | 2023-09[53] |
Bengaluru–Chennai Expressway[54] | Karnataka, Andhra Pradesh, Tamil Nadu | 258 km (160.3 mi) | 2024-08 |
Bengaluru-Vijayawada Expressway | Karnataka,Andhra Pradesh | 624 km (387.7 mi) | 2026 |
Bhopal-Indore Expressway[55] | Madhya Pradesh | 157 km (97.6 mi) | 2026 |
Chittoor–Thatchur Expressway | Andhra Pradesh,Tamil Nadu | 117 km (72.7 mi) | 2025 |
Chennai Port–Maduravoyal Expressway[56][57] | Tamil Nadu | 20.6 km (12.8 mi) | 2024-12 |
Delhi-Jaipur Super Expressway(NH-352B) | Rajasthan, Haryana | 195 km (121.2 mi) | 2024-12 |
Surat–Chennai Expressway | Gujarat, Maharashtra, Karnataka, Telangana, Andhra Pradesh, Tamil Nadu | 1,271 km (789.8 mi) | 2026-12 |
Atal Progress-way (Chambal Expressway)[58] | Rajasthan, Madhya Pradesh, Uttar Pradesh | 404 km (251 mi) | 2027 |
Ambala-Shamli Expressway | Haryana, Uttar Pradesh | 120 km (75 mi) | 2024-12[59] |
Coastal Road (Mumbai) (phase 1) | Maharashtra | 29.2 km (18.1 mi) | 2023-11 |
DND–KMP Expressway | Delhi, Haryana | 59 km (37 mi) | 2024-03 |
Delhi–Amritsar–Katra Expressway[60] | Delhi, Haryana, Punjab, Jammu and Kashmir | 687 km (427 mi) | 2023-12 |
Delhi–Mumbai Expressway[61] (Phase 3) | Rajasthan, Gujarat, Maharashtra | 862 km (536 mi) | 2023-12 |
Dwarka Expressway | Delhi, Haryana | 27.6 km (17.1 mi) | 2023-09 |
Faridabad–Noida–Ghaziabad Expressway | Delhi, Haryana, Uttar Pradesh | 56 km (35 mi) | TBA |
Ganga Expressway (Meerut–Prayagraj) | Uttar Pradesh | 594 km (369.1 mi) | 2024-12 |
Gorakhpur Link Expressway[62] | Uttar Pradesh | 91.40 km (56.8 mi) | 2023-12 |
Ghazipur-Ballia-Manjhighat Expressway[63] | Uttar Pradesh | 132.76 km (82.5 mi) | 2023-12[64] |
Lucknow–Kanpur Expressway | Uttar Pradesh | 66 km (41 mi) | 2025-01 |
Lucknow Outer Ring Road | Uttar Pradesh | 108 km (67 mi) | 2023-11 |
Loknayak Ganga Path Phase II | Bihar | 18 km (11 mi) | 2024-12 |
Ludhiana Elevated corridor | Punjab | 13 km (8.1 mi) | 2024-03 |
Mumbai Trans Harbour Link | Maharashtra | 21.8 km (13.5 mi) | 2023-11 |
Mumbai–Nagpur Expressway (Phase III)[65] | Maharashtra | 120 km (74.6 mi) | 2023-12[66] |
Ludhiana-Bhatinda-Ajmer experessway[67]
(Phase 1- Ludhiana to Bhatinda) |
Punjab | 75.5 km (46.9 mi) | 2025-08 |
Satellite Town Ring Road (STRR) (NH-948A) | Karnataka | 280 km (170 mi) | 2024-03 |
Mumbai-Pune Missing Link Expressway | Maharashtra | 13.3 km (8.3 mi) | 2025-08[68] |
Raipur–Visakhapatnam Expressway | Chhattisgarh, Odisha, Andhra Pradesh | 465 km (288.9 mi) | 2024-03 |
Urban Extension Road-II | Delhi | 75.7 km (47.0 mi) | 2023-09 |
Varanasi Ring Road[69][70] | Uttar Pradesh | 63 km (39 mi) | 2024-02 |
Wazirabad–Mayur Vihar Elevated Expressway | Delhi NCR | 18 km (11 mi) | 2027 |
Coimbatore Avinashi Road Elevated Expressway | Tamil Nadu |
10.1 km (6.3 mi) |
2024-01 |
Delhi–Saharanpur–Dehradun Expressway | Delhi, Uttar Pradesh, Uttrakhand | 210 km (130 mi) | 2023-12 |
Total | 8,772.56 km (5,451.02 mi) |
Proposed expressways
Name | States | Length (km/mi) |
---|---|---|
Golden Triangular Expressway[71][52] | Dhanbad-Bokaro-Ranchi-Jamshedpur, Jharkhand | 400 km (248.5 mi) |
Kharagpur–Burdwan–Moregram Expressway | West Bengal | 230 km (142.9 mi) |
Agra-Gwalior Expressway | Uttar Pradesh,Madhya Pradesh | 88.4 km (54.9 mi) |
Amaravati–Anantapur Expressway[72] | Andhra Pradesh | 371 km (230.5 mi) |
Amas–Darbhanga Expressway | Bihar | 189 km (117.4 mi) |
Aurangabad-Darbhanga Expressway[73] | Bihar | 271 km (168.4 mi) |
Ballia Link Expressway[74] | Uttar Pradesh | 30 km (19 mi) |
Bangalore Peripheral Ring Road | Karnataka | 74 km (46 mi) |
Bengaluru – Pune Expressway | Karnataka, Maharashtra | 700 km (430 mi) |
Buxar – Bhagalpur Expressway[75] | Bihar | 308 km (191.4 mi) |
Chennai Elevated Expressways[76] | Tamil Nadu | 10 km (6.2 mi) |
Delhi-Hisar-Fazilka Expressway[77] | Haryana | 170 km (105.6 mi) |
Virar – Alibag Expressway[78] | Maharashtra | 126 km (78.3 mi) |
Ganga Expressway Phase-2[79][80][81][82] | Uttar Pradesh, Uttarakhand | 424 km (263.5 mi) |
GMADA Expressway | Chandigarh, Haryana, Punjab | 284 km (176 mi) |
Pune-Nashik Industrial Expressway[83][84] | Maharashtra | 250 km (160 mi) |
Pune-Aurangabad Expressway | Maharashtra | 225 km (140 mi) |
Gorakhpur–Siliguri Expressway[75] | Uttar Pradesh, Bihar, West Bengal | 607 km (377.2 mi) |
Hyderabad–Indore Expressway[85] | Madhya Pradesh , Maharashtra , Telangana | 713 km (443 mi) |
Raipur-Hyderabad Expressway[86] | Chhattisgarh , Maharashtra, Telangana | 530 km (330 mi) |
Hyderabad–Visakhapatnam Expressway[85] | Telangana , Andhra Pradesh | 225 km (140 mi) |
Indore–Kota Expressway[85] | Rajasthan , Madhya Pradesh | 136 km (85 mi) |
Jalna-Nanded Expressway[85] | Maharashtra | 179 km (111 mi) |
Kadapa Feeder Expressway[87] | Andhra Pradesh | 104.1 km (64.7 mi) |
Konkan Greenfield Expressway | Maharashtra | 500 km (310 mi) |
Mysuru-Kushalnagar Expressway[88] | Karnataka | 115 km (71 mi) |
Kurnool Feeder Expressway[87] | Andhra Pradesh | 123.7 km (76.9 mi) |
Nagpur-Gondia-Gadchiroli Expressway[89] | Maharashtra | 225 km (140 mi) |
Nagpur–Hyderabad–Bengaluru Expressway[90] | Maharashtra, Telangana, Andhra pradesh, Karnataka | 1,100 km (680 mi) |
Nagpur–Vijayawada Expressway[86] | Maharashtra , Telangana , Andhra Pradesh | 457 km (284 mi) |
Nagpur–Goa Expressway[91] | Maharashtra | 760 km (470 mi) |
Prayagraj Link Expressway[92] | Uttar Pradesh | 193 km (120 mi) |
Pune Ring Road | Maharashtra | 128 km (80 mi) |
Meerut-Haridwar Expressway[93] | Uttar Pradesh | 120 km (75 mi) |
Rampur-Rudrapur expressway[93] | Uttar Pradesh | 50 km (31 mi) |
Regional Ring Road, Hyderabad | Telangana | 330 km (210 mi) |
Chitrakoot-Prayagraj Expressway[93] | Uttar Pradesh | 130 km (81 mi) |
Vindhya Expressway[93] | Uttar Pradesh | 190 km (120 mi) |
Vindhya Expressway[94] | Madhya Pradesh | 660 km (410 mi) |
Narmada Expressway[95] | Madhya Pradesh | 1,300 km (810 mi) |
Outer Ring Road, Amaravati[96] | Andhra Pradesh | 220 km (136.7 mi) |
Outer Ring Road, Patna | Bihar | 140 km (87 mi) |
Durg–Raipur–Arang Expressway | Chhattisgarh | 92 km (57 mi) |
Raxaul-Haldia Expressway | Bihar, Jharkhand, West Bengal | 650 km (400 mi) |
Thiruvananthapuram Outer Ring Road[97] | Kerala | 80 km (50 mi) |
Varanasi Link Expressway[98][99] | Uttar Pradesh | 13 km (8.1 mi) |
Total | 14,187 km (8,815 mi) | |
Proposed expressways under Bharatmala
Name | States | Length (km/mi) |
---|---|---|
Bareilly-Gorakhpur Expressway[103] | Uttar Pradesh | 500 km (310 mi) |
Chennai–Salem Expressway | Tamil Nadu | 277 km (172 mi) |
Chennai–Trichy–Thanjavur Expressway | Tamil Nadu | 310 km (190 mi) |
Delhi–Hisar Expressway | Haryana | 170 km (110 mi) |
Durg-Raipur-Arang Expressway | Chhattisgarh | 92 km (57 mi) |
Gurugram–Faridabad Expressway | Haryana | 135 km (84 mi) |
Indore-Mumbai Expressway | Madhya Pradesh, Maharashtra | 515 km (320 mi) |
Gorakhpur-Shamli Expressway[104][105] | Uttar Pradesh | 840 km (520 mi) |
Kharagpur–Kolkata Expressway | West Bengal | 120 km (75 mi) |
Kharagpur–Siliguri Expressway | West Bengal | 516 km (321 mi) |
Mangaluru–Chitradurga Expressway | Karnataka | 196 km (122 mi) |
Pathankot–Ajmer Expressway[106] | Rajasthan, Haryana, Punjab | 600 km (370 mi) |
Pune–Bengaluru Expressway[107] | Karnataka, Maharashtra | 745 km (463 mi) |
Salem–Chengapalli Expressway | Tamil Nadu | 103 km (64 mi) |
Varanasi-Aurangabad-Chordaha Economic Corridor | Uttar Pradesh, Bihar | 262 km (163 mi) |
Varanasi–Ranchi–Kolkata Expressway | Uttar Pradesh, Bihar, Jharkhand, West Bengal | 650 km (400 mi) |
Tharad-Ahmedabad Expressway | Gujarat | 214 km (133 mi) |
Total | 6,031 km (3,747 mi) |
See also
- Ring Roads in India
- Ring roads in India
- Similar rail development
- Future of rail transport in India, rail development
- List of high-speed railway lines in India
- Similar roads development
- Bharatmala
- Diamond Quadrilateral, Subsumed in Bharatmala
- Golden Quadrilateral, completed national road development connectivity older scheme
- National Highways Development Project, Subsumed in Bharatmala
- North-South and East-West Corridor, Subsumed in Bharatmala
- India-China Border Roads, Subsumed in Bharatmala
- Setu Bharatam, river road bridge development in India
- Char Dham Highway, a project under MoRTH
- Similar ports and river transport development
- Indian Rivers Inter-link
- List of National Waterways in India
- Sagar Mala project, national water port development connectivity scheme
- Similar air transport development
- Indian Human Spaceflight Programme
- UDAN, national airport development connectivity scheme
- Highways in India
- List of National Highways in India by highway number
- List of National Highways in India
- List of Expressway in Maharashtra
- General
References
- "Mumbai-Nagpur Expressway: CM Shinde, Dy CM Fadnavis Launch Phase-2 of Samruddhi Mahamarg". 26 May 2023.
- "Brownfield National Highway Project". CEPT. Retrieved 2 August 2022.
- "43,000 km state roads converted to national highways in last eight years". The New Indian Express. Retrieved 2 April 2022.
- "Maharashtra, UP to drive state-led capex in road sector in next 3 yrs – Times of India". The Times of India. 7 May 2019. Retrieved 1 June 2019.
- Dash, Dipak Kumar (23 November 2009). "By 2022, govt to lay 18,637 km of expressways". Times of India.
- Kumar, Ashutosh. "Expressway cost pegged at Rs20 crore/km". Daily News and Analysis. Retrieved 16 September 2016.
- "Working to develop 200,000 km national highway network by 2025: Gadkari". business standard. Retrieved 31 January 2022.
- "Bharat Mala: PM Narendra Modi's planned Rs 14,000 crore road from Gujarat to Mizoram", The Economic Times, New Delhi, 29 April 2015
- "Government to infuse massive Rs 7 trn to build 83,677 km of roads over 5 years". The Financial Express. 30 October 2017. Retrieved 20 July 2020.
- "Bharatmala Phase-I". Ministry of Road Transport and Highways (India).
- "Bharatmala Pariyojana – A Stepping Stone towards New India". National Portal of India. Retrieved 18 January 2018.
- "Basic Road Statistics in India 2018–19". Press Information Bureau Basic Road Statistics in India 2018–19. Retrieved 18 January 2018.
- "Notification dated March 13, 1986" (PDF). The Gazette of India. Retrieved 12 November 2021.
- "Ahmedabad Vadodara Expressway to be ready by March-Source-Business Standard". Archived from the original on 4 October 2012. Retrieved 30 December 2021.
- "Notification dated March 30, 2006" (PDF). The Gazette of India. Retrieved 12 November 2021.
- "Gurgaon: Kundli-Manesar expressway inauguration today". Retrieved 5 November 2018.
- "Notification dated June 18, 2020" (PDF). Archived (PDF) from the original on 29 May 2022. Retrieved 24 September 2020.
- "Delhi-Meerut Expressway open for public, cuts travel time to 45 minutes".
- Notification dated January 10, 2020
- "Notification dated June 25, 2020" (PDF). Archived (PDF) from the original on 3 May 2021. Retrieved 24 September 2020.
- "Notification dated September 17, 2020" (PDF). Archived (PDF) from the original on 3 May 2021. Retrieved 24 September 2020.
- "Notification dated December 15, 2020" (PDF). The Gazette of India. Retrieved 12 November 2021.
- "Notification dated January 1, 2021" (PDF). Archived (PDF) from the original on 21 April 2021. Retrieved 21 April 2021.
- "Nitin Gadkari's ambitious infrastructure plan: 5 new greenfield highways to come up on major routes". The Financial Express. 14 May 2018. Retrieved 2 September 2018.
- "PM Modi to inaugurate 340-km long Purvanchal Expressway on Nov 16 | Check out spectacular photos". Retrieved 12 November 2021.
- "IAF fighter planes to welcome inauguration". Nyooz. Archived from the original on 13 January 2017. Retrieved 23 February 2017.
- "Agra-Lucknow Expressway: India's longest greenfield expressway reduces travel time between Delhi-Lucknow to 6 hours; 10 facts to know". Financial Express. 21 November 2016. Retrieved 21 November 2016.
- "Facts About Yamuna Expressway". Projects Jugaad. 5 October 2013. Archived from the original on 2 December 2013. Retrieved 6 December 2013.
- "Yamuna Expressway Project". Yamuna Expressway Industrial Development Authority. Archived from the original on 7 December 2013. Retrieved 6 December 2013.
- PM Modi Inaugurates Delhi-Meerut Expressway, Will Also Open Eastern Peripheral Expressway Today: 10 Facts, NDTV
- "All you need to know about Delhi-Meerut Expressway". Hindustan Times. 27 May 2018. Retrieved 27 May 2018.
- ""Mumbai-Pune Expressway, India"". Road Traffic Technology. Retrieved 21 August 2010.
- "Ahmedabad-Vadodara Expressway Project". Cclindia.com. Retrieved 16 September 2010.
- "The 10 Amazing Expressways in India". www.walkthroughindia.com. Retrieved 12 November 2021.
- "Delhi-Panipat Expressway (NH-44) : Finally पूरा बन कर तैयार 🤩 #detoxtraveller". Detox Traveller. 26 June 2023.
- "Excess cars made tolling a taxing truth at first: Expressway builder". Express India. Archived from the original on 20 November 2008. Retrieved 16 September 2015.
- "Noida: An idea that has worked". The Times of India. 4 June 2003.
- "Welcome to DND Flyway". Dndflyway.com. 22 July 2009. Archived from the original on 2 October 2011. Retrieved 16 July 2010.
- "Delhi Faridabad Expressway". Archived from the original on 1 January 2016.
- "Badarpur flyover to open today". The Times of India. 5 October 2010. Archived from the original on 10 July 2012.
- "Another Outer Ring Road stretch to be opened today". TOI. Retrieved 16 July 2010.
- "CM opens second phase of Chennai Outer Ring Road | Chennai News – Times of India".
- "PIB Foundation stone for Phase II of Chennai Bypass". PIB. Archived from the original on 28 September 2007. Retrieved 25 February 2017.
- "अब सफर होगा सुहाना: गुरुग्राम के राजीव चौक से सोहना तक 20 मिनट में पहुंचेंगे, छह लेन का एलिवेटिड हाईवे खुला". Amar Ujala (in Hindi). Retrieved 11 July 2022.
- Tripathi, Piyush (30 November 2020). "Bihar CM to inaugurate elevated road between AIIMS and Digha today". The Times of India. Retrieved 20 July 2022.
- "Longest Elevated Expressway inaugurated in Hyderabad | India Trends". Indiatrends.info. 20 October 2009. Archived from the original on 21 July 2011. Retrieved 16 July 2010.
- "Hyderabad gets India's longest flyover". NDTV. Retrieved 16 July 2010.
- "Panipat elevated highway inaugurated". Projectsmonitor.com. Archived from the original on 14 January 2010. Retrieved 16 July 2010.
- "Panipat-Dabwali Expressway to connect Uttar Pradesh, Haryana with THESE states; reduce travel time to Karnal". DNA India. Retrieved 12 February 2023.
- https://www.businesstoday.in/latest/economy/story/union-minister-nitin-gadkari-shares-stunning-images-of-ranchi-jamshedpur-expressway-395868-2023-08-28
- https://economictimes.indiatimes.com/news/economy/infrastructure/nitin-gadkari-inaugurates-lays-foundation-stone-for-nine-projects-in-jamshedpur/articleshow/98942407.cms?from=mdr
- https://riseranchi.in/new-6-lane-ranchi-jamshedpur-expressway-to-boost-connectivity-and-economy-in-jharkhand/
- Saha, Dhruvaksh (19 May 2022). "Amritsar-Jamnagar expressway to be completed by Sep 2023: Gadkari". Business Standard India. Retrieved 12 July 2022.
- "Project report on Bangalore-Chennai Expressway may get ready by March". The Hindu. 21 October 2011. Archived from the original on 2 May 2012. Retrieved 16 August 2012.
- "Indore Bhopal Expressway: Bhopal to Indore in two hours, along with an industrial corridor will be built; 70 m width will be". 16 December 2022.
- "Chennai Port-Maduravoyal corridor to have 6 lanes". The Hindu. 15 March 2018. Retrieved 30 May 2018.
- "Chennai Port to Maduravoyal corridor project in TN to be completed by Dec 2024, says Union Minister Nitin Gadkari". News On AIR. 3 October 2022. Retrieved 13 March 2023.
- "Development of Highway sector in MP: Centre incorporates Atal Progress-Way in Bharatmala Pariyojana Phase-1".
- https://hindi.news18.com/news/business/expressways-ambala-shamli-expressway-ambala-shamli-expressway-construction-work-started-check-route-map-current-status-cost-completion-date-and-travel-time-7106867.html
- "NHAI nod for Asr-Delhi highway extension". The Tribune. 19 April 2017. Archived from the original on 2 October 2017. Retrieved 2 October 2017.
- "Govt announces plans to build Delhi-Mumbai expressway for Rs 1 lakh crore". Hindustan Times. 17 April 2018.
- "Gorakhpur link expressway". Retrieved 14 November 2019.
- "MoRTH invites bids for ₹3,200-cr Gazipur-Ballia highway". 12 August 2022. Retrieved 12 August 2022.
- "UPEIDA to acquire land for Ghazipur-Manjhighat greenfield highway". The Metro Rail Guy. Retrieved 12 July 2022.
- "Work on Nagpur-Mumbai expressway begins in full swing – Times of India". The Times of India. 22 January 2019.
- "Mumbai-Nagpur Expressway: Route Map, Cost and Status". Magicbricks Blog. 24 February 2022. Retrieved 12 July 2022.
- "Work allotted for six-laning of Ludhiana-Bathinda expressway". Tribuneindia News Service. Tribune News Service. Retrieved 12 July 2022.
- "Mumbai-Pune expressway 'missing link' project 60% over, to have Asia's widest tunnel". 10 November 2022.
- "पूर्वांचल के इन जिलों को बड़ा तोहफा, मार्च से शुरू होगा रिंग रोड फेज-2 का निर्माण". Patrika News. 16 January 2018. Retrieved 12 November 2021.
- "NHAI plans to develop Model Stretches in every state". www.outlookindia.com. Retrieved 12 November 2021.
- https://www.jharkhandmirror.net/golden-triangle-ranchi-dhanbad-jamshedpur-expressway-on-the-anvil/
- "Amaravati-Anantapur highway to cost Rs 27,635 crore". Deccan Chronicle. 4 October 2016. Retrieved 12 November 2021.
- "मगध से मिथिला को जोड़ेगा बिहार का पहला ग्रीन फील्ड एक्सप्रेस-वे, जानें कब तक बन कर होगा तैयार, कितने जिलों से गुजरेगी?". Prabhat Khabar – Hindi News. 7 March 2021. Retrieved 12 November 2021.
- "CM Yogi Adityanath OKs link expressway to connect Ballia, Ghazipur". The Times of India. 27 December 2020.
- "Bihar set to get its 4th expressway, will connect Gorakhpur to Siliguri". Hindustan Times. 23 November 2021. Retrieved 24 November 2021.
- "Chennai Elevated Road" (PDF). CMDA. Retrieved 9 January 2016.
- "Faster connectivity from Hisar to Delhi". The Times of India. 9 March 2018. Retrieved 9 March 2018.
- "After Samruddhi Mahamarg, Maharashtra shifts focus on Alibaug-Virar Multi Modal Corridor". The Indian Express. 21 December 2022. Retrieved 23 December 2022.
- "Proposed Alignment" (PDF).
- "Ganga e-way alignment plans ready for UP CM's nod before consultant invite | Lucknow News – Times of India". The Times of India. 18 September 2019. Retrieved 12 November 2021.
- "7 bids for Upper Ganga Canal Expressway". Financialexpress.com. 11 March 2010. Retrieved 16 July 2010.
- "No state consent, NHAI goes ahead with four-laning of highway section". Indian Tollways. 3 December 2009. Archived from the original on 6 December 2009. Retrieved 16 July 2010.
- "NOTICE INVITING TENDER" (PDF). MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LIMITED, MUMBAI(A Govt. of Maharashtra Undertaking). Retrieved 12 October 2022.
- "With Samruddhi Expressway Nearing Completion, Maharashtra Begins Work On 2 New Expressways Connecting Pune-Nashik, Nagpur- Goa". India Infra Hub. 18 October 2022. Retrieved 18 October 2022.
- "23 new expressways and highways coming up in next 5 years". Times of India. 13 August 2020. Retrieved 13 August 2020.
- "NHAI chalks out plan to build 22 greenfield expressways by FY25". Construction Week Online India. Retrieved 4 June 2020.
- "Green Field Express Way (Anantapur to Amaravati)". Retrieved 12 November 2021.
- "Mysuru-Kushalnagar four-lane Expressway: 11 firms bid for tender". 5 March 2023.
- "225km eastern Mah E-way to connect Gadchiroli Gondia to Samrudddhi Mahamarg". Times Of India. 8 December 2021. Retrieved 8 December 2021.
- Ramakrishnan, N (3 January 2018). "Feedback Infra pitches for a big role in designing greenfield expressways". Business Line. Archived from the original on 31 May 2018. Retrieved 31 May 2018.
- "All about Nagpur – Goa Expressway". Times Property. 15 February 2023. Retrieved 11 March 2023.
- "These expressways will shorten the distances in Uttar Pradesh". The Times of India. Retrieved 6 December 2019.
- "Uttar Pradesh: Yogi Govt Plans Six More Expressways, To Connect Major Hindu Religious Cities". The Hindu. India Infra Hub. 21 September 2022. ISSN 0971-751X. Retrieved 21 September 2022.
- "Madhya Pradesh: It will connect Bhopal and Singrauli via Damoh, Katni, Rewa, Sidhi". The Hindu. India Infra Hub. 15 February 2023. ISSN 0971-751X. Retrieved 15 February 2023.
- "Centre approves Chambal, Narmada Expressways in MP". Times of India. Retrieved 8 October 2017.
- "Outer ringroad for Amaravathi". The Times of India. 8 December 2015. Retrieved 8 December 2015.
- Jisha Surya (30 March 2018). "Outer ring road for capital to become a reality soon". The Times of India. Retrieved 15 April 2022.
- "UPEIDA".
- "Development of Purvanchal Expressway" (PDF). Retrieved 12 November 2021.
- Sood, Jyotika (9 July 2018). "Govt may launch 7 greenfield projects under Bharatmala". Mint. Retrieved 13 July 2018.
- "Raipur-Vizag Expressway Proj under Bharatmala Project: Centre". The Pioneer. Retrieved 4 August 2018.
- "bharatmala-2-0-to-focus-on-expressways-add-4000-km-greenfield-roads". The Times of India. January 2019. Retrieved 2 January 2019.
- "Bareilly-Gorakhpur Expressway – Information & Status".
- "यूपी में ये 10 ग्रीनफील्ड एक्सप्रेसवे बदल देंगे प्रदेश की सूरत, होगा 1.38 लाख Cr. का निवेश-Greenfield Expressways in UP".
- "Terai Expressway: सामरिक दृष्टि से अहम होगा 700 KM लंबा गोरखपुर- शामली एक्सप्रेसवे, उतर सकेंगे लड़ाकू विमान".
- "NHAI ने दी मंजूरी- अजमेर-जालंधर ग्रीनफील्ड के लिए 4 जिलों में होगी भू-अवाप्ति". Dainik Bhaskar (in Hindi). Retrieved 2 September 2018.
- "Bharatmala 2.0". TOI. Retrieved 21 January 2019.